Claims Analysis
Total Claims: 16
Claim 1
Independent Claim
294 words
A method of energy load management for avoiding energy source use during selected time periods during selected heating and cooling of a building in which air motion conveys air within a selected temperature range for comfort of occupants of said building, said method comprising: providing a first wallboard material on interior portions of said building removed from effects of temperature exterior to said building, said first wall board material containing therein a first phase change material having a melting point temperature substantially in a center of said selected temperature range for comfort; providing a second wallboard material on interior surfaces of portions of said building subject to effects of temperature exterior to said building, said second wallboard material containing therein a second phase change material having a melting point temperature less than, but within about four degrees C. of said melting temperature of said first phase change material; providing a thermostat within said building for setting and determining temperature within said building, said thermostat controlling de-activating said energy source at a beginning of said selected time period and activating said energy source at a conclusion of said selected time period; conditioning air in an interior of said building with said energy source at a temperature to achieve an initial charged state of said first and second phase change materials at said beginning of said selected time period; de-activating said energy source at said beginning of said selected time period whereby said first and second phase change materials change phase from said initial charged state to provide said selected heating and cooling of said building; and activating said energy source at said conclusion of said selected time period whereby said first and second phase change materials change phase to return to said initial charged states.
Claim 2
Independent Claim
294 words
A method of energy load management for avoiding energy source use during selected time periods during selected heating and cooling of a building in which air motion conveys air within a selected temperature range for comfort of occupants of said building, said method comprising: providing a first wallboard material on interior portions of said building removed from effects of temperature exterior to said building, said first wall board material containing therein a first phase change material having a melting point temperature substantially in a center of said selected temperature range for comfort; providing a second wallboard material on interior surfaces of portions of said building subject to effects of temperature exterior to said building, said second wallboard material containing therein a second phase change material having a melting point temperature less than, but within about four degrees C. of said melting temperature of said first phase change material; providing a thermostat within said building for setting and determining temperature within said building, said thermostat controlling de-activating said energy source at a beginning of said selected time period and activating said energy source at a conclusion of said selected time period; conditioning air in an interior of said building with said energy source at a temperature to achieve an initial charged state of said first and second phase change materials at said beginning of said selected time period; de-activating said energy source at said beginning of said selected time period whereby said first and second phase change materials change phase from said initial charged state to provide said selected heating and cooling of said building; and activating said energy source at said conclusion of said selected time period whereby said first and second phase change materials change phase to return to said initial charged states.
Claim 3
Dependent Claim
128 words
The method of claim 1 further comprising: providing a first input to said thermostat, said first input having a signal related to temperature within said building; providing a second input to said thermostat, said second input having a signal related to a clock setting of said selected time period; and providing an output signal from said thermostat to said energy source for said activation and de-activation of said energy source, said output signal controlled by at least one of said signals of said first and second inputs whereby said signal of said first input controls said activation of said energy source to assure said initial charged state of said phase change material prior to said de-activation of said energy source at said beginning of said selected time period.
Claim 4
Dependent Claim
82 words
The method of claim 2 wherein said selected of said heating and cooling is heating of said air in said building and said energy source is a heating system, and wherein said first input prevents said de-activating of said energy source prior to said phase change material in said wallboard material being melted such that heat is given to said interior air of said building during solidification of said phase change material after said de-activating step and prior to said activating step.
Claim 5
Dependent Claim
76 words
The method of claim 2 wherein said selected of said heating and cooling is cooling of said air in said building and said energy source is a cooling system, and wherein said first input prevents said deactivating of said energy source prior to said phase change material in said wallboard material being solidified such that heat is removed from said interior air of said building during melting of said phase change material after said de-activating step.
Claim 6
Dependent Claim
70 words
The method of claim 2 wherein: said first wallboard material contains about 10 weight percent said phase change material having a melting temperature of about 19.65° C.; said second wallboard material contains about 10 weight percent said second phase change material having a melting temperature of about 18.5° C.; and said first input to said thermostat provides activating of said energy source between about 19.65° C. and about 21.3° C.
Claim 7
Dependent Claim
24 words
The method of claim 1 wherein said wallboard material is gypsum wallboard containing from about 5 to about 30 weight percent phase change material.
Claim 8
Dependent Claim
100 words
The method of claim 1 further comprising: passing said conditioned air from said energy source through internal wall cavities within said building such that said cavities create a duct-plenum system for said building, said wall cavities being within walls having provided thereon a third wall board material, said third wallboard material containing a third phase change material having a melting temperature substantially midway between centers of selected temperature ranges for cooling and heating said building; and providing a second thermostat associated with a fan for circulating said conditioned air through said duct-plenum system during said de-activating of said energy source.
Claim 9
Dependent Claim
25 words
The method of claim 7 wherein said third wallboard material is gypsum wallboard containing from about 5 to about 30 weight percent phase change material.
Claim 10
Independent Claim
383 words
A method of energy load management for avoiding energy source use during selected time periods during selected heating and cooling of a building in which air motion conveys air within a selected temperature range for comfort of occupants of said building, said method comprising: providing a first wallboard material upon interior wall portions of said building removed from effects of temperature exterior to said building, said wallboard material containing therein a first phase change material, said first phase change material having a melting point to change phase at a temperature substantially equal to a temperature in a center of said selected temperature range for comfort; providing a second wallboard material upon interior surfaces of building portions subject to effects of temperature exterior to said building, said second wallboard material containing a phase change material having a melting point less than, but within about four degrees C., of said melting temperature of said first phase change material providing a thermostat within said building for setting and determining temperature within said building, said thermostat having a first input signal related to temperature within said building, a second input signal related to a clock setting of said selected time period, and an output signal to said energy source for activation and de-activation of said energy source, said output signal controlled by at least one of said first and second input signals whereby said first input signal controls activation of said energy source to assure an initial fully charged state of said phase change material prior to de-activating of said energy source at a beginning of said selected time period and said second input signal controls activating of said energy source at a conclusion of said selected time period; conditioning air in an interior of said building with said energy source at a temperature to achieve said initial fully charged state of said phase change material at said beginning of said selected time period; de-activating said energy source at said beginning of said selected time period whereby said phase change material changes phase from said initial fully charged state to provide said selected heating and cooling of said building; and activating said energy source at said conclusion of said selected time period whereby said phase change material changes phase to return to said initially fully charged state.
Claim 11
Independent Claim
383 words
A method of energy load management for avoiding energy source use during selected time periods during selected heating and cooling of a building in which air motion conveys air within a selected temperature range for comfort of occupants of said building, said method comprising: providing a first wallboard material upon interior wall portions of said building removed from effects of temperature exterior to said building, said wallboard material containing therein a first phase change material, said first phase change material having a melting point to change phase at a temperature substantially equal to a temperature in a center of said selected temperature range for comfort; providing a second wallboard material upon interior surfaces of building portions subject to effects of temperature exterior to said building, said second wallboard material containing a phase change material having a melting point less than, but within about four degrees C., of said melting temperature of said first phase change material providing a thermostat within said building for setting and determining temperature within said building, said thermostat having a first input signal related to temperature within said building, a second input signal related to a clock setting of said selected time period, and an output signal to said energy source for activation and de-activation of said energy source, said output signal controlled by at least one of said first and second input signals whereby said first input signal controls activation of said energy source to assure an initial fully charged state of said phase change material prior to de-activating of said energy source at a beginning of said selected time period and said second input signal controls activating of said energy source at a conclusion of said selected time period; conditioning air in an interior of said building with said energy source at a temperature to achieve said initial fully charged state of said phase change material at said beginning of said selected time period; de-activating said energy source at said beginning of said selected time period whereby said phase change material changes phase from said initial fully charged state to provide said selected heating and cooling of said building; and activating said energy source at said conclusion of said selected time period whereby said phase change material changes phase to return to said initially fully charged state.
Claim 12
Dependent Claim
30 words
The method of claim 9 wherein said first wallboard material and said second wallboard material are gypsum wallboards containing from about 5 to about 30 weight percent phase change materials.
Claim 13
Dependent Claim
83 words
The method of claim 9 wherein said selected of said heating and cooling is heating of said air in said building and said energy source is a heating system, and wherein said first input prevents said de-activating of said energy source prior to said phase change material in said wallboard material being fully melted such that heat is given to said interior air of said building during solidification of said phase change material after said de-activating step and prior to said activating step.
Claim 14
Dependent Claim
77 words
The method of claim 9 wherein said selected of said heating and cooling is cooling of said air in said building and said energy source is a cooling system, and wherein said first input prevents said deactivating of said energy source prior to said phase change material in said wallboard material being fully solidified such that heat is removed from said interior air of said building during melting of said phase change material after said de-activating step.
Claim 15
Dependent Claim
100 words
The method of claim 9 further comprising: passing said conditioned air from said energy source through internal wall cavities within said building such that said cavities create a duct-plenum system for said building, said wall cavities being within walls having provided thereon a third wall board material, said third wallboard material containing a third phase change material having a melting temperature substantially midway between centers of selected temperature ranges for cooling and heating said building; and providing a second thermostat associated with a fan for circulating said conditioned air through said duct-plenum system during said de-activating of said energy source.
Claim 16
Dependent Claim
25 words
The method of claim 13 wherein said third wallboard material is gypsum wallboard containing from about 5 to about 30 weight percent phase change material.