Abstract A method of preventing intrusion of fluid into a horizontal well bore. A quantity of liquid composition capable of gelling and containing a breaker is introduced into a horizontal well bore up to a point corresponding to the bottom of the intrusion zone. After the liquid composition gels into a temporary gel, a second liquid composition capable of gelling into a permanent gel is introduced into the zone to shut off fluid flow from the zone. The temporary gel prevents flow of the permanent gel into the horizontal well bore. Thereafter the breaker in the temporary gel causes the gel to revert to a liquid, which is removed from the horizontal well bore upon production of the well.
Inventors
- 👤 David O. Falk
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 01:14
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/32; C; C09; C09K; C09K8/00; C09K8/50; C09K8/504; C09K8/506; C09K8/508; C09K8/512; E21B33/00; E21B33/10; E21B33/13; E21B33/138; E21B41/00; E21B41/0035
Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
113 words
In an oil well having a vertical wall bore and a transverse bore extending therefrom, a method of permanently plugging a zone intersected by the transverse bore to prevent fluid flow from said zone into the transverse bore, comprising the steps of: temporarily blocking the transverse bore against fluid flow therethrough at a location below said zone, subsequent to all drilling equipment being removed from said vertical well bore and said transverse bore; introducing plugging material into said zone to permanently block fluid flow from said zone into the transverse bore; and removing the temporary blockage from the transverse bore to permit fluid flow through the transverse bore and into the vertical bore.
Claim 2
Dependent Claim
113 words
In an oil well having a vertical wall bore and a transverse bore extending therefrom, a method of permanently plugging a zone intersected by the transverse bore to prevent fluid flow from said zone into the transverse bore, comprising the steps of: temporarily blocking the transverse bore against fluid flow therethrough at a location below said zone, subsequent to all drilling equipment being removed from said vertical well bore and said transverse bore; introducing plugging material into said zone to permanently block fluid flow from said zone into the transverse bore; and removing the temporary blockage from the transverse bore to permit fluid flow through the transverse bore and into the vertical bore.
Claim 3
Dependent Claim
48 words
A method according to claim 1, wherein the transverse bore is temporarily blocked by introducing into the transverse bore a liquid composition capable of gelling and allowing the liquid composition to gel, and wherein the temporary blockage is removed by causing the gel to revert to a liquid.
Claim 4
Dependent Claim
24 words
A method according to claim 2, wherein the plugging material is a liquid composition which gels to a permanently mature state in said zone.
Claim 5
Dependent Claim
29 words
A method according to claim 2, wherein the gel of the temporary blockage is caused to revert to a fluid by including a gel breaker in the fluid composition.
Claim 6
Dependent Claim
21 words
A method according to claim 4, wherein the gel comprises a carboxylate-containing polymer crosslinked with a chromic carboxylate complex crosslinking agent.
Claim 7
Dependent Claim
13 words
A method according to claim 5, wherein the polymer is an acrylamide polymer.
Claim 8
Dependent Claim
32 words
A method according to claim 6, wherein the polymer is a polymer selected from the group consisting of polyacrylamide and partially hydrolyzed polyacrylamide, and the crosslinking agent comprises a chromic acetate complex.
Claim 9
Dependent Claim
23 words
A method according to claim 2, wherein the transverse bore is filled with the liquid composition substantially to a level adjacent said zone.
Claim 10
Dependent Claim
38 words
A method according to claim 8, including the step of determining the volume of the transverse bore below the bottom of said zone, the amount of liquid composition introduced into the transverse bore substantially corresponding to such volume.
Claim 11
Dependent Claim
177 words
In an oil well having a vertical well bore and a transverse bore extending therefrom, a method of preventing intrusion of fluid into the transverse bore from a zone intersected by the transverse bore, comprising the steps of: determining the volume of the transverse bore below the bottom of said zone; introducing into the transverse bore a quantity of a first liquid composition capable of gelling, the quantity of said first liquid composition being sufficient to fill the transverse bore substantially to the bottom of said zone, the liquid composition containing a breaker; allowing the first liquid composition to gel; plugging said zone with a second liquid composition capable of gelling to a permanently mature state over a period of time and allowing the second liquid composition to gel, the gel maturing from the first liquid composition preventing the second liquid composition from entering the transverse bore below the bottom of said zone; allowing the gel containing the breaker to revert to a liquid; and removing the liquid resulting from the broken gel from the transverse bore.
Claim 12
Dependent Claim
177 words
In an oil well having a vertical well bore and a transverse bore extending therefrom, a method of preventing intrusion of fluid into the transverse bore from a zone intersected by the transverse bore, comprising the steps of: determining the volume of the transverse bore below the bottom of said zone; introducing into the transverse bore a quantity of a first liquid composition capable of gelling, the quantity of said first liquid composition being sufficient to fill the transverse bore substantially to the bottom of said zone, the liquid composition containing a breaker; allowing the first liquid composition to gel; plugging said zone with a second liquid composition capable of gelling to a permanently mature state over a period of time and allowing the second liquid composition to gel, the gel maturing from the first liquid composition preventing the second liquid composition from entering the transverse bore below the bottom of said zone; allowing the gel containing the breaker to revert to a liquid; and removing the liquid resulting from the broken gel from the transverse bore.
References Cited (Backward Citations)
US3056288A
Cited
US3447608A
Cited
US3482635A
Cited
US3615794A
Cited
US3921733A
Cited
US4290485A
Cited
US3785437A
Cited
US3938594A
Cited
US4018286A
Cited
US4137182A
Cited
US4157116A
Cited
US4190109A
Cited
US4343363A
Cited
US4390067A
Cited
US4436165A
Cited
US4444265A
Cited
US4494606A
Cited
US4703799A
Cited
US4722397A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1993-05-28 | 1993-11-27 | 1994-05-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1997-05-28 | 1997-11-27 | 1998-05-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2001-05-28 | 2001-11-27 | 2002-05-29 | $7700.00 | Window Closed / Lapsed |