← Back to Patent Explorer
US4436165A Expired / Lapsed US ⏱️ 0.0 years remaining

Drain hole drilling

Assignee: Atlantic Richfield Co
•
Filing: 1982-09-02
•
Granted: 1984-03-13
•
Expires: 2002-09-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for enhancing the recovery of liquid products from a wellbore having at least one laterally extending drain hole wellbore extending therefrom, wherein a portion of the primary wellbore near the drain hole wellbore and a portion of the drain hole wellbore itself are completely filled with a hardenable material and the hardened material is then re-drilled leaving an outer layer of hardened material to line the primary wellbore and part of the drain hole wellbore so that gas cannot prematurely cone into the primary wellbore, thereby enhancing liquid recovery by way of the unlined portion of the drain hole wellbore before any gas reaches the drain hole wellbore.

Inventors

  • 👤 Leonard W. Emery

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 05:44
CPC Classifications
E; E21; E21B; E21B41/00; E21B41/0035; E21B41/0042; E21B33/00; E21B33/10; E21B33/13; E21B33/134; E21B7/00; E21B7/04

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 169 words
In a method for drilling at least one laterally extending drain hole wellbore from a primary wellbore into an area of the earth that produces both gas and liquid, the improvement comprising drilling a first portion of said drain hole wellbore into said area, said first portion being at least through the radius of curvature portion of said drain hole wellbore, filling said primary wellbore in said area and at least said radius of curvature portion of said drain hole wellbore with a hardenable material, allowing said material to harden, and re-drilling said primary wellbore and said filled portion of said drain hole wellbore to leave an outer layer of said hardened material around said primary and drain hole wellbores whereby in said area of gas and liquid production a lined primary wellbore and a lined first portion of said drain hole wellbore adjacent said primary wellbore is established to thereby reduce gas coning into same and enhance liquid production through the unlined portion of said drain hole wellbore.
Claim 2
Dependent Claim 169 words
In a method for drilling at least one laterally extending drain hole wellbore from a primary wellbore into an area of the earth that produces both gas and liquid, the improvement comprising drilling a first portion of said drain hole wellbore into said area, said first portion being at least through the radius of curvature portion of said drain hole wellbore, filling said primary wellbore in said area and at least said radius of curvature portion of said drain hole wellbore with a hardenable material, allowing said material to harden, and re-drilling said primary wellbore and said filled portion of said drain hole wellbore to leave an outer layer of said hardened material around said primary and drain hole wellbores whereby in said area of gas and liquid production a lined primary wellbore and a lined first portion of said drain hole wellbore adjacent said primary wellbore is established to thereby reduce gas coning into same and enhance liquid production through the unlined portion of said drain hole wellbore.
Claim 3
Dependent Claim 14 words
In the method according to claim 1 wherein said hardenable material is cement based.
Claim 4
Dependent Claim 21 words
In the method according to claim 1 wherein said gas is essentially natural gas and said liquid is essentially crude oil.
Claim 5
Dependent Claim 49 words
In the method according to claim 1 wherein said area of the earth that produces both gas and liquid is composed of a liquid producing formation and at least one adjacent gas producing formation, and said at least one drain hole wellbore is drilled into said liquid producing formation.
Claim 6
Dependent Claim 32 words
In the method according to claim 4 wherein at least one drain hole wellbore is drilled as far from said gas producing formation as possible while staying within said liquid producing formation.
Claim 7
Dependent Claim 77 words
In the method according to claim 1 wherein the full length of said at least one drain hole wellbore is drilled, said drain hole wellbore is plugged at or downstream of the end of said radius of curvature portion, only the part of said drain hole wellbore upstream of said plug is filled with hardenable material and then re-drilled to re-establish communication through the entire length of the lined and unlined portions of said drain hole wellbore.

References Cited (Backward Citations)

US2079517A Cited
US2193807A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-03-13 1987-09-12 1988-03-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-03-13 1991-09-12 1992-03-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-03-13 1995-09-12 1996-03-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag