← Back to Patent Explorer
US4444265A Expired / Lapsed US ⏱️ 0.0 years remaining

Drain hole drilling

Assignee: Atlantic Richfield Co
•
Filing: 1982-09-02
•
Granted: 1984-04-24
•
Expires: 2002-09-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for enhancing the recovery of liquid products from a wellbore having at least one laterally extending drain hole wellbore extending therefrom wherein a portion of the earth around the primary wellbore and a part of the drain hole wellbore is treated to render same essentially gas impermeable so that gas cannot prematurely cone into the primary wellbore, thereby enhancing the liquid recovery by way of the drain hole wellbore before gas reaches the drain hole wellbore.

Inventors

  • 👤 Jerry W. Schmidt

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 19:37
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/32; E21B33/00; E21B33/10; E21B33/13; E21B33/138; E21B43/30; E21B43/305

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 169 words
In a method for drilling at least one drain hole wellbore which extends laterally from a primary wellbore into an area of the earth that produces both gas and liquid, the improvement comprising said area of the earth that produces both gas and liquid is composed of a liquid producing formation and at least one adjacent gas producing formation, said at least one drain hole wellbore is drilled into said liquid producing formation as far from said gas producing formation as possible while staying within said liquid producing formation, treating a significant portion of the earth around said primary wellbore in said gas and liquid producing area to render said treated portion essentially impermeable to gas, and thereafter drilling or completing drilling said at least one drain hole wellbore through said treated portion and into the untreated gas and liquid producing area whereby undesired gas coning into said primary and/or drain hole wellbores is at least substantially reduced and liquid production from said drain hole wellbore is substantially enhanced.
Claim 2
Dependent Claim 169 words
In a method for drilling at least one drain hole wellbore which extends laterally from a primary wellbore into an area of the earth that produces both gas and liquid, the improvement comprising said area of the earth that produces both gas and liquid is composed of a liquid producing formation and at least one adjacent gas producing formation, said at least one drain hole wellbore is drilled into said liquid producing formation as far from said gas producing formation as possible while staying within said liquid producing formation, treating a significant portion of the earth around said primary wellbore in said gas and liquid producing area to render said treated portion essentially impermeable to gas, and thereafter drilling or completing drilling said at least one drain hole wellbore through said treated portion and into the untreated gas and liquid producing area whereby undesired gas coning into said primary and/or drain hole wellbores is at least substantially reduced and liquid production from said drain hole wellbore is substantially enhanced.
Claim 3
Dependent Claim 21 words
In the method according to claim 1 wherein said gas is essentially natural gas and said liquid is essentially crude oil.
Claim 4
Dependent Claim 50 words
In the method according to claim 1 wherein said at least one drain hole wellbore passes through a radius of curvature portion when it first leaves said primary wellbore, and said treated portion extends laterally from said primary wellbore for at least the distance covered by said radius of curvature.
Claim 5
Dependent Claim 40 words
In the method according to claim 1 wherein the permeability of said treated portion is reduced with at least one material which is not soluble in the gas and liquid originally present in said gas producing and liquid producing formations.
Claim 6
Dependent Claim 20 words
In the method according to claim 4 wherein said material is at least one of a silicate, polymer, and gum.
Claim 7
Dependent Claim 27 words
In the method according to claim 5 wherein said material is at least one of alkali metal silicate, polyacrylamide, polyacrylate, natural gum and derivatives of natural gum.
Claim 8
Dependent Claim 26 words
In the method according to claim 6 wherein said material is at least one of sodium silicate, partially hydrolyzed polyacrylamide, polyacrylate, guar gum and xanthum gum.
Claim 9
Dependent Claim 36 words
In the method according to claim 1 wherein said treated portion is injected with a liquid which when left in place in the earth solidifies over time to render said treated portion essentially impermeable to gas.
Claim 10
Dependent Claim 60 words
In the method according to claim 1 wherein prior to drilling said drain hole wellbore said treating of the earth around said primary wellbore is carried out to render same essentially impermeable to gas, and only after such treating step is said drain hole wellbore drilled from said primary wellbore through said treated earth and into untreated, liquid producing earth.
Claim 11
Dependent Claim 80 words
In the method according to claim 1 wherein a radius of curvature portion of said drain hole wellbore is drilled before any treating step is carried out, after drilling said radius of curvature portion the earth around said primary wellbore and said radius of curvature portion of said drain hole wellbore is treated to render same essentially impermeable to gas, and after such treating step said drain hole wellbore is extended beyond said treated earth into untreated, liquid producing earth.
Claim 12
Dependent Claim 73 words
In the method according to claim 1 wherein the drain hole wellbore is drilled in its entirety prior to any treatment step, a plug is placed in said drain hole wellbore and said primary wellbore and the portion of said drain hole wellbore upstream from said plug are treated to render same essentially gas impermeable after which said plug is removed and liquid recovered from the untreated portion of said drain hole wellbore.

References Cited (Backward Citations)

US2236836A Cited
US2404341A Cited
US2713906A Cited
US3297088A Cited
US3782467A Cited
US3779315A Cited
US4009755A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-04-24 1987-10-24 1988-04-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-04-24 1991-10-24 1992-04-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-04-24 1995-10-24 1996-04-24 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag