Patent US4808226A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4808226A Expired / Lapsed US ⏱️ 0.0 years remaining

Bearings fabricated from rapidly solidified powder and method

Assignee: United States, AIR FORCE, Secretary of, Department of
•
Filing: 1987-11-24
•
Granted: 1989-02-28
•
Expires: 2007-11-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process of fabricating steel stock for bearing components from highly alloyed steel powders supersaturated in carbon up to 0.5 weight percent in ferrite and up to 1.0 weight percent in austenite type combinations is disclosed. Rapid solidification of an atomized molten composition yields a metal powder with a diameter ranging between 75 and 105 microns. The metal powder is then compressed and heated to a low forging temperature between 1,600 DEG and 1,800 DEG F. to yield the steel stock.

Inventors

  • 👤 Colin M. Adam

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 10:02
CPC Classifications
C; C22; C22C; C22C33/00; C22C33/02; C22C33/0257; C22C33/0278; C22C33/0285; F; F16; F16C; F16C33/00; F16C33/30; F16C33/58; F16C33/62; Y; Y10; Y10S; Y10S384/00; Y10S384/90; Y10S384/912

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 139 words
A process for producing austenite and ferrite steel alloy stock, said process comprising the steps of: selecting and melting an alloy composition to produce a molten alloy wherein said alloy composition is selected from a group consisting of about 9-14 percent Cr, 6 percent Mo, 1 percent V, 1.15 percent C and the balance Fe; atomizing said molten alloy into a spray; rapidly quenching said spray into said steel alloy powder using a stream of helium gas and then screening to a particle size ranging between 75 and 105 microns; pouring said steel alloy powder into cylinders; consolidating said steel alloy powder with pressures ranging between 5 and 30 tons per square inch; and extracting said steel alloy stock from said cylinders when it cools, said alloy stock having RC hardness levels ranging between RC 60 and RC 64.
Claim 2
Dependent Claim 139 words
A process for producing austenite and ferrite steel alloy stock, said process comprising the steps of: selecting and melting an alloy composition to produce a molten alloy wherein said alloy composition is selected from a group consisting of about 9-14 percent Cr, 6 percent Mo, 1 percent V, 1.15 percent C and the balance Fe; atomizing said molten alloy into a spray; rapidly quenching said spray into said steel alloy powder using a stream of helium gas and then screening to a particle size ranging between 75 and 105 microns; pouring said steel alloy powder into cylinders; consolidating said steel alloy powder with pressures ranging between 5 and 30 tons per square inch; and extracting said steel alloy stock from said cylinders when it cools, said alloy stock having RC hardness levels ranging between RC 60 and RC 64.
Claim 3
Dependent Claim 11 words
The steel alloy stock produced by the process of claim 1.
Claim 4
Dependent Claim 142 words
A process for producing austenite and ferrite steel alloy stock, said process comprising the steps of: selecting and melting an alloy composition to produce a molten alloy, wherein said alloy composition is selected from a group consisting of about 4-10 percent tungsten, 1-6 percent chromium, 1-6 percent molybdenum, between 0.1-percent of vanadium, niobium, and carbon, and the balance Fe; atomizing said molten alloy into a spray; rapidly quenching said spray into said steel alloy powder using a stream of helium gas and then screening to a particle size ranging between 75 and 105 microns; pouring said steel alloy powder into cylinders; consolidating said steel alloy powder by extrusion at a temperature ranging between 1600F and 1800F; and extracting said steel alloy stock from said cylinders when it cools, said alloy stock having RC hardness levels ranging between RC 60 and RC 64.
Claim 5
Dependent Claim 142 words
A process for producing austenite and ferrite steel alloy stock, said process comprising the steps of: selecting and melting an alloy composition to produce a molten alloy, wherein said alloy composition is selected from a group consisting of about 4-10 percent tungsten, 1-6 percent chromium, 1-6 percent molybdenum, between 0.1-percent of vanadium, niobium, and carbon, and the balance Fe; atomizing said molten alloy into a spray; rapidly quenching said spray into said steel alloy powder using a stream of helium gas and then screening to a particle size ranging between 75 and 105 microns; pouring said steel alloy powder into cylinders; consolidating said steel alloy powder by extrusion at a temperature ranging between 1600F and 1800F; and extracting said steel alloy stock from said cylinders when it cools, said alloy stock having RC hardness levels ranging between RC 60 and RC 64.
Claim 6
Dependent Claim 11 words
The steel alloy stock produced by the process of claim 3.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-02-28 1992-08-29 1993-02-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-02-28 1996-08-29 1997-02-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-02-28 2000-08-29 2001-02-28 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag