System and method for dynamic multi-objective optimization of machine selection, integration and utilization
Assignee: Rockwell Automation Technologies Inc
•
Filing: 2010-08-13
•
Granted: 2012-02-28
•
Expires: 2030-08-13
Abstract
Abstract The invention provides control systems and methodologies for controlling a process having one or more motorized pumps and associated motor drives, which provide for optimized process performance according to one or more performance criteria, such as efficiency, component life expectancy, safety, emissions, noise, vibration, operational cost, or the like. More particularly, the subject invention provides for employing machine diagnostic and/or prognostic information in connection with optimizing an overall business operation over a time horizon.
Inventors
- 👤 Frederick M. Discenzo
- 👤 Ramdas M. Pai
- 👤 Gerald Peter Schaller
- 👤 Michael Scott Roote
- 👤 Richard James Novak
- 👤 David Lee Jensen
- 👤 John Crandall Ference
- 👤 Bennet Ray Williams
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-27 07:15
CPC Classifications
G; G05; G05B; G05B23/00; G05B23/02; G05B23/0205; G05B23/0259; G05B23/0286; G05B23/0294; G05B13/00; G05B13/02; G05B13/0205; G05B13/024; G05B13/0265; G06; G06Q; G06Q10/00; G06Q10/04; G06Q10/06; G06Q10/063; G06Q10/0637; G06Q10/06375; H; H04; H04L; H04L67/00; H04L67/01; H04L67/12; H04L69/00; H04L69/40; G05B2219/00; G05B2219/30; G05B2219/32; G05B2219/32015; G05B2219/32017; Y; Y02; Y02P; Y02P90/00; Y02P90/80; Y02P90/82
Claims Analysis
Total Claims: 18
Claim 1
Independent Claim
278 words
A system that facilitates optimization of business operation, comprising: a processor; a memory communicatively coupled to the processor, the memory having stored therein computer-executable instructions configured to implement the system, including: a first component configured to capture state data relating to a current state of a set of machines associated with at least one process that is part of the business operation; a second component configured to capture second state data of the at least one process; a correlation engine configured to correlate at least the first state data, the second state data, two or more specified business objectives, and efficiency information for at least one machine of the set of machines to derive correlated information; and a prognostics engine configured to infer, at predetermined time intervals, a future state of a subset of the business operation based in part on the correlated information, and to determine, at the predetermined time intervals, an alternate future state of the subset of the business operation predicted to achieve the two or more specified business objectives; and an optimization component configured to select, at the predetermined time intervals, a value for at least one control variable associated with at least one of the set of machines, wherein the value is selected to drive the subset of the business operation from the current state to the alternate future state, wherein the two or more specified business objectives include at least two of decreased energy usage of the business operation, decreased energy cost incurred by the business operation, increased revenue generated by the business operation, increased product throughput, decreased machine life cycle cost, increased machine longevity, reduced machine maintenance cost, or reduced overhead.
Claim 2
Independent Claim
278 words
A system that facilitates optimization of business operation, comprising: a processor; a memory communicatively coupled to the processor, the memory having stored therein computer-executable instructions configured to implement the system, including: a first component configured to capture state data relating to a current state of a set of machines associated with at least one process that is part of the business operation; a second component configured to capture second state data of the at least one process; a correlation engine configured to correlate at least the first state data, the second state data, two or more specified business objectives, and efficiency information for at least one machine of the set of machines to derive correlated information; and a prognostics engine configured to infer, at predetermined time intervals, a future state of a subset of the business operation based in part on the correlated information, and to determine, at the predetermined time intervals, an alternate future state of the subset of the business operation predicted to achieve the two or more specified business objectives; and an optimization component configured to select, at the predetermined time intervals, a value for at least one control variable associated with at least one of the set of machines, wherein the value is selected to drive the subset of the business operation from the current state to the alternate future state, wherein the two or more specified business objectives include at least two of decreased energy usage of the business operation, decreased energy cost incurred by the business operation, increased revenue generated by the business operation, increased product throughput, decreased machine life cycle cost, increased machine longevity, reduced machine maintenance cost, or reduced overhead.
Claim 3
Dependent Claim
41 words
The system of claim 1 , wherein the current state, the future state, and the alternate future state relate to at least one of production throughput, product quality, possibility of equipment failure, machine temperature, part order arrival, or material stock quality.
Claim 4
Dependent Claim
52 words
The system of claim 1 , wherein the prognostics engine and the optimization component are configured to iteratively infer the future state and select the value for the at least one control variable over multiple time intervals to facilitate convergence of the subset of the business operation on the alternate future state.
Claim 5
Dependent Claim
43 words
The system of claim 1 , wherein the optimization component is configured to select the value for the at least one control variable based additionally on extrinsic data relating to one or more factors that are extrinsic to the at least one process.
Claim 6
Dependent Claim
34 words
The system of claim 4 , wherein the one or more factors include at least one of a real-time energy cost, an availability of a replacement component, or a costs of the replacement component.
Claim 7
Dependent Claim
27 words
The system of claim 4 , wherein the one or more factors include environmental data collected from an environment in which the at set of machines operate.
Claim 8
Dependent Claim
35 words
The system of claim 1 , wherein the prognostics engine is configured to infer the future state based in part on analysis of historical data associated with prior operation of the at least one process.
Claim 9
Independent Claim
259 words
A method for controlling one or more aspects of a business operation, comprising: employing a processor executing computer-executable instructions stored on a computer-readable storage medium to implement acts, including specifying two or more business objectives, including specifying two or more of the following: reducing energy usage of the business operation, reducing energy cost incurred by the business operation, increasing revenue generated by the business operation, increasing product throughput, reducing machine life cycle cost, increasing machine longevity, reducing overhead, or reducing machine repair cost; capturing first state data relating to a present state of one or more machines that control at least one process that is part of the business operation; capturing second state data relating to the at least one process; correlating the first state data, the second state data, the two or more business objectives, and efficiency information for at least one machine of the one or more machines to yield correlated information; and iteratively updating at least one control variable associated with the one or more machines, the updating comprising: inferring a future state of the one or more machines based in part on the first state data; determining an alternate future state of the one or more machines that achieves the two or more business objectives based on the correlated information; computing an updated value for the at least one control variable, wherein the updated value is calculated to drive the one or more machines from the present state to the alternate future state; and setting the at least one control variable to the updated value.
Claim 10
Independent Claim
259 words
A method for controlling one or more aspects of a business operation, comprising: employing a processor executing computer-executable instructions stored on a computer-readable storage medium to implement acts, including specifying two or more business objectives, including specifying two or more of the following: reducing energy usage of the business operation, reducing energy cost incurred by the business operation, increasing revenue generated by the business operation, increasing product throughput, reducing machine life cycle cost, increasing machine longevity, reducing overhead, or reducing machine repair cost; capturing first state data relating to a present state of one or more machines that control at least one process that is part of the business operation; capturing second state data relating to the at least one process; correlating the first state data, the second state data, the two or more business objectives, and efficiency information for at least one machine of the one or more machines to yield correlated information; and iteratively updating at least one control variable associated with the one or more machines, the updating comprising: inferring a future state of the one or more machines based in part on the first state data; determining an alternate future state of the one or more machines that achieves the two or more business objectives based on the correlated information; computing an updated value for the at least one control variable, wherein the updated value is calculated to drive the one or more machines from the present state to the alternate future state; and setting the at least one control variable to the updated value.
Claim 11
Dependent Claim
35 words
The method of claim 8 , wherein the inferring the future state comprises inferring at least one of production throughput, product quality, probability of equipment failure, machine temperature, part order arrival, or material stock quality.
Claim 12
Dependent Claim
37 words
The method of claim 8 , wherein the computing the updated value comprises computing the updated value further based on extrinsic data relating to one or more extrinsic factors with respect to the at least one process.
Claim 13
Dependent Claim
48 words
The method of claim 10 , wherein the computing the updated value further based on the extrinsic data comprises computing the updated value based on at least one of a real-time or predicted energy cost, an availability of a replacement component, or a cost of the replacement component.
Claim 14
Dependent Claim
36 words
The method of claim 8 , wherein the inferring the future state comprises inferring the future state based in part on an analysis of trend data associated with prior operation of the one or more machines.
Claim 15
Dependent Claim
39 words
The method of claim 8 , wherein the updating includes iteratively performing the inferring, the determining, the computing, and the setting over multiple time intervals to facilitate convergence of the one or more machines toward the alternate future state.
Claim 16
Dependent Claim
65 words
The method of claim 8 , wherein the determining the alternate future state includes: generating a suite of possible operating conditions for the one or more machines; mapping the suit of possible operating scenarios against the present state of the one or more machines; and selecting the alternate future state from the suit of possible operating conditions based at least in part on the mapping.
Claim 17
Dependent Claim
211 words
A computer-readable medium having stored thereon computer-executable instructions that, in response to execution, cause a computer to perform operations including: collecting operational data from a set of machines and at least one process associated with the set of machines within a business operation; correlating the operational data, two or more specified business objectives, and efficiency information for at least one machine of the one or more machines to yield correlated information; inferring a future state of the at least one process using the operational data; determining an alternative future state of the at least one process that moves at least one process closer, relative to the future state, to two or more specified business objectives, wherein the determining is based on the correlated information, wherein the two or more specified business objectives include two or more of reducing energy usage of the business operation, reducing an energy cost incurred by the business operation, increasing revenue generated by the business operation, increasing product throughput, reducing machine life cycle cost, increasing machine longevity, decreasing overhead, or decreasing machine repair cost; and calculating, based on the correlated information, a value for at least one variable controlling the at least one process predicted to drive the at least one process to the alternative future state.
Claim 18
Dependent Claim
211 words
A computer-readable medium having stored thereon computer-executable instructions that, in response to execution, cause a computer to perform operations including: collecting operational data from a set of machines and at least one process associated with the set of machines within a business operation; correlating the operational data, two or more specified business objectives, and efficiency information for at least one machine of the one or more machines to yield correlated information; inferring a future state of the at least one process using the operational data; determining an alternative future state of the at least one process that moves at least one process closer, relative to the future state, to two or more specified business objectives, wherein the determining is based on the correlated information, wherein the two or more specified business objectives include two or more of reducing energy usage of the business operation, reducing an energy cost incurred by the business operation, increasing revenue generated by the business operation, increasing product throughput, reducing machine life cycle cost, increasing machine longevity, decreasing overhead, or decreasing machine repair cost; and calculating, based on the correlated information, a value for at least one variable controlling the at least one process predicted to drive the at least one process to the alternative future state.
References Cited (Backward Citations)
US2320492A
Cited
US3913829A
Cited
US4508261A
Cited
US5311123A
Cited
US5347466A
Cited
US5680541A
Cited
GB2281132A
Cited
US5630070A
Cited
US5461570A
Cited
US5873251A
Cited
US5737215A
Cited
US6014598A
Cited
US6041287A
Cited
US5917428A
Cited
US6021402A
Cited
US6111643A
Cited
US6359690B1
Cited
US6560549B2
Cited
US6260004B1
Cited
US6330525B1
Cited
US6434512B1
Cited
US6119074A
Cited
US6341266B1
Cited
US6295510B1
Cited
US6233493B1
Cited
US6553816B1
Cited
US6289735B1
Cited
US6298308B1
Cited
US6826538B1
Cited
US6243615B1
Cited
US6326758B1
Cited
US6262550B1
Cited
US20020049653A1
Cited
US20020013635A1
Cited
US6556884B1
Cited
US6567752B2
Cited
US7627493B1
Cited
US20040236450A1
Cited
US20040167677A1
Cited
US6681156B1
Cited
US20020099580A1
Cited
US6633790B2
Cited
US6619111B2
Cited
US20020123864A1
Cited
US6795798B2
Cited
US7143016B1
Cited
US20030172002A1
Cited
US20030023336A1
Cited
EP1286289A2
Cited
US20030061004A1
Cited
US7050873B1
Cited
US6847854B2
Cited
US20040267395A1
Cited
US20030061091A1
Cited
EP1316866A1
Cited
US20030167146A1
Cited
US6691007B2
Cited
US20030208394A1
Cited
US7860737B2
Cited
US7085615B2
Cited
US20040049715A1
Cited
US20040073505A1
Cited
US20040117236A1
Cited
US20040186605A1
Cited
US20050234579A1
Cited
US7966214B2
Cited
US7206644B2
Cited
US20060241986A1
Cited
US20060259173A1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2015-02-27 | 2015-08-29 | 2016-02-28 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2019-02-27 | 2019-08-29 | 2020-02-28 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2023-02-27 | 2023-08-29 | 2024-02-28 | $7700.00 | Window Closed / Lapsed |