Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
259 words
A system for monitoring incoming electric power being consumed in a facility and for interrupting the flow of electric power within the facility to selected power consuming loads when a preselected peak incoming power load is exceeded for a first preselected time period comprising: first means for producing a power load signal proportional to the instantaneous total incoming amperage flowing into the facility; a peak demand limiter including: second means for receiving said power load signal and for providing a load shed control signal after said first preselected time period during which said power load signal has exceeded said preselected peak load; third means for receiving said load shed control signal and for then sequentially transmitting independent first and second equipment shut-off signals each of short pulsed duration through a first and second phase power transmission line, respectively, of a multi-phase power line within the facility supplying electrical current to an electrical circuit breaker panel within the facility; said third means also for repeating the sequential transmittal of said first and second shut-off signals through the first and second phase power transmission line; a remote receiver connected between the circuit breaker panel and a first power consuming load including: fourth means for receiving each said shut-off signal and for opening a first relay of the first power consuming load to interrupt electrical power being supplied from the circuit breaker panel to the first power consuming load; fifth means for closing said first relay to restore electrical power to the first power consuming load after a second preselected time period.
Claim 2
Independent Claim
259 words
A system for monitoring incoming electric power being consumed in a facility and for interrupting the flow of electric power within the facility to selected power consuming loads when a preselected peak incoming power load is exceeded for a first preselected time period comprising: first means for producing a power load signal proportional to the instantaneous total incoming amperage flowing into the facility; a peak demand limiter including: second means for receiving said power load signal and for providing a load shed control signal after said first preselected time period during which said power load signal has exceeded said preselected peak load; third means for receiving said load shed control signal and for then sequentially transmitting independent first and second equipment shut-off signals each of short pulsed duration through a first and second phase power transmission line, respectively, of a multi-phase power line within the facility supplying electrical current to an electrical circuit breaker panel within the facility; said third means also for repeating the sequential transmittal of said first and second shut-off signals through the first and second phase power transmission line; a remote receiver connected between the circuit breaker panel and a first power consuming load including: fourth means for receiving each said shut-off signal and for opening a first relay of the first power consuming load to interrupt electrical power being supplied from the circuit breaker panel to the first power consuming load; fifth means for closing said first relay to restore electrical power to the first power consuming load after a second preselected time period.
Claim 3
Dependent Claim
61 words
A system as set forth in claim 1, wherein: said second means is also for selectively providing an alternate load shed control signal occurring during a different preselected time of day than that of said first load shed control signal and after said first preselected time period during which said power load signal has continuously exceeded an alternate preselected peak load.
Claim 4
Dependent Claim
46 words
A system as set forth in claim 2, wherein: said third means is also for producing a continuous test signal similar to said first and second equipment turn on signals being received by said remote receiver, said test signal for set-up and testing of said system.
Claim 5
Dependent Claim
29 words
A system as set forth in claim 1, wherein: said third means sequentially transmits said first and second shut-off signals and includes means for repeating the sequential signal transmission.
Claim 6
Dependent Claim
36 words
A system as set forth in claim 4, wherein: said third means is also for providing a reset signal to each said remote receiver immediately upon restoration of the incoming electrical power after a power outage.
Claim 7
Independent Claim
249 words
A system for monitoring incoming electric power being consumed in a facility and for interrupting the flow of electric power within the facility to selected power consuming loads when a preselected peak incoming power load is exceeded for a first preselected time period comprising: first means for producing a power load signal proportional to the instantaneous total incoming amperage flowing into the facility; second means for receiving said power load signal and for providing a load shed control signal after said first preselected time period during which said power load signal has continuously exceeded said preselected peak load; third means for receiving said load shed control signal and for then transmitting independent first and second equipment shut-off signals each of short pulsed duration through a first and second phase power transmission line, respectively, of a multi-phase power line within the facility supplying electrical current to an electrical circuit breaker panel within the facility; said third means also for repeating the sequential transmittal of said first and second shut-off signals through the first and second phase power transmission line; fourth means connected between the circuit breaker panel and a power consuming load for receiving each said shut-off signal and for opening a first relay of the first power consuming load to interrupt electrical power being supplied from the circuit breaker panel to the first power consuming load; fifth means for closing said first relay to restore electrical power to the first power consuming load after a second preselected time period.
Claim 8
Independent Claim
249 words
A system for monitoring incoming electric power being consumed in a facility and for interrupting the flow of electric power within the facility to selected power consuming loads when a preselected peak incoming power load is exceeded for a first preselected time period comprising: first means for producing a power load signal proportional to the instantaneous total incoming amperage flowing into the facility; second means for receiving said power load signal and for providing a load shed control signal after said first preselected time period during which said power load signal has continuously exceeded said preselected peak load; third means for receiving said load shed control signal and for then transmitting independent first and second equipment shut-off signals each of short pulsed duration through a first and second phase power transmission line, respectively, of a multi-phase power line within the facility supplying electrical current to an electrical circuit breaker panel within the facility; said third means also for repeating the sequential transmittal of said first and second shut-off signals through the first and second phase power transmission line; fourth means connected between the circuit breaker panel and a power consuming load for receiving each said shut-off signal and for opening a first relay of the first power consuming load to interrupt electrical power being supplied from the circuit breaker panel to the first power consuming load; fifth means for closing said first relay to restore electrical power to the first power consuming load after a second preselected time period.
Claim 9
Independent Claim
254 words
A system for monitoring incoming electric power being consumed in a facility and for interrupting the flow of electric power within the facility to selected power consuming loads when a preselected peak incoming power load is exceeded for a first preselected time period comprising: first means for producing a power load signal proportional to the instantaneous total incoming amperage flowing into the facility; a peak demand limiter including: second means for receiving said power load signal and for providing a load shed control signal after said first preselected time period during which said power load signal has continuously exceeded said preselected peak load; third means for receiving said load shed control signal and for then transmitting first and second equipment shut-off signals one immediately following the other and each of short pulsed duration through a power transmission line within the facility supplying electrical current to an electrical circuit breaker panel within the facility; said third means also for repeating the sequential transmittal of said first and second shut-off signals through the first and second phase power transmission line; a remote receiver connected between the circuit breaker panel and a first power consuming load including: fourth means for receiving each said shut-off signal and for opening a first relay of the first power consuming load to interrupt electrical power being supplied from the circuit breaker panel to the first power consuming load; fifth means for closing said first relay to restore electrical power to the first power consuming load after a second preselected time period.
Claim 10
Independent Claim
254 words
A system for monitoring incoming electric power being consumed in a facility and for interrupting the flow of electric power within the facility to selected power consuming loads when a preselected peak incoming power load is exceeded for a first preselected time period comprising: first means for producing a power load signal proportional to the instantaneous total incoming amperage flowing into the facility; a peak demand limiter including: second means for receiving said power load signal and for providing a load shed control signal after said first preselected time period during which said power load signal has continuously exceeded said preselected peak load; third means for receiving said load shed control signal and for then transmitting first and second equipment shut-off signals one immediately following the other and each of short pulsed duration through a power transmission line within the facility supplying electrical current to an electrical circuit breaker panel within the facility; said third means also for repeating the sequential transmittal of said first and second shut-off signals through the first and second phase power transmission line; a remote receiver connected between the circuit breaker panel and a first power consuming load including: fourth means for receiving each said shut-off signal and for opening a first relay of the first power consuming load to interrupt electrical power being supplied from the circuit breaker panel to the first power consuming load; fifth means for closing said first relay to restore electrical power to the first power consuming load after a second preselected time period.