Add/shed load control according to multiple add/shed sequences
Assignee: Honeywell Inc
•
Filing: 1983-12-13
•
Granted: 1985-04-09
•
Expires: 2003-12-13
Abstract
Abstract An add/shed system for adding/shedding loads to maintain a building's power consumption below a predetermined level, each load being assigned to one of the multiple types of add/shed routines, each routine controlling the adding/shedding of the loads in a different sequence.
Inventors
- 👤 Charles H. Culp
- 👤 Denise J. Downar
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 15:11
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; H02J2105/00; H02J2105/50; H02J2105/52; H02J2105/57; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222
Claims Analysis
Total Claims: 19
Claim 1
Independent Claim
115 words
An add/shed system for adding/shedding loads to maintain a building's power consumption below a predetermined level, each load being assigned to at least one of multiple types of add/shed routines, each routine controlling the adding/shedding of said loads in a different sequence, said system comprising: a plurality of loads; and, processor means connected to said plurality of loads and adapted to be connected to a power meter for determining which of said plurality of loads should be added/shed to maintain power consumption below said predetermined level and for determining which type of the multiple types of add/shed routine is assigned to each load, said processor means for adding/shedding each load according to its assigned routine.
Claim 2
Dependent Claim
115 words
An add/shed system for adding/shedding loads to maintain a building's power consumption below a predetermined level, each load being assigned to at least one of multiple types of add/shed routines, each routine controlling the adding/shedding of said loads in a different sequence, said system comprising: a plurality of loads; and, processor means connected to said plurality of loads and adapted to be connected to a power meter for determining which of said plurality of loads should be added/shed to maintain power consumption below said predetermined level and for determining which type of the multiple types of add/shed routine is assigned to each load, said processor means for adding/shedding each load according to its assigned routine.
Claim 3
Dependent Claim
75 words
The system of claim 1 wherein said processor means includes means for determining which of said plurality of loads are assigned to a rotational routine for shedding and adding loads on the basis that the first load shed is the first load added and which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with zones having the least deviation from comfort is shed first.
Claim 4
Dependent Claim
69 words
The system of claim 1 wherein said processor means includes means for determining which of said plurality of loads are assigned to a rotational routine for shedding and adding loads on the basis that the first load shed is the first load added and which are assigned to a sequential routine for shedding and adding loads on the basis that the last load shed is the first load added.
Claim 5
Dependent Claim
74 words
The system of claim 1 wherein said processor means includes means for determining which of said loads are assigned to a sequential routine for shedding and adding loads on the basis that the last load shed is the first load added and which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with the zone having the least deviation from comfort is shed first.
Claim 6
Dependent Claim
99 words
The system of claim 1 wherein said processor means includes means for determining which of said loads are assigned to a rotational routine for adding and shedding loads on the basis that the first load shed is the first load added, which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with the zone having the least deviation from comfort is shed first, and which are assigned to a sequential routine for adding and shedding loads on the basis that the last load shed is the first load added.
Claim 7
Dependent Claim
32 words
The system of claim 5 wherein said processor means includes means for determining which loads should be manually shed and for displaying the loads to be manually shed to a human operator.
Claim 8
Dependent Claim
170 words
An add/shed system for adding/shedding loads to maintain a building's power consumption below a predetermined level, each load being assigned to one of a plurality of shed orders depending upon a preassigned add/shed priority, each shed order being assigned to one of multiple types of add/shed routines, each different type of routine controlling the sequence of adding/shedding of the loads assigned to its associated order, any of the multiple of types of add/shed routines capable of being assigned to more than one shed order, said system comprising: a plurality of loads; and, processor means connected to said plurality of loads and adapted to be connected to a power meter for determining which of said plurality of loads should be added/shed to maintain power consumption below said predetermined level and for determining which shed order and which multiple type of add/shed routine are assigned to each load, said processor means for adding/shedding each load first according to its shed order and then according to the routine assigned to the shed order.
Claim 9
Dependent Claim
170 words
An add/shed system for adding/shedding loads to maintain a building's power consumption below a predetermined level, each load being assigned to one of a plurality of shed orders depending upon a preassigned add/shed priority, each shed order being assigned to one of multiple types of add/shed routines, each different type of routine controlling the sequence of adding/shedding of the loads assigned to its associated order, any of the multiple of types of add/shed routines capable of being assigned to more than one shed order, said system comprising: a plurality of loads; and, processor means connected to said plurality of loads and adapted to be connected to a power meter for determining which of said plurality of loads should be added/shed to maintain power consumption below said predetermined level and for determining which shed order and which multiple type of add/shed routine are assigned to each load, said processor means for adding/shedding each load first according to its shed order and then according to the routine assigned to the shed order.
Claim 10
Dependent Claim
75 words
The system of claim 7 wherein said processor means includes means for determining which of said plurality of loads are assigned to a rotational routine for shedding and adding loads on the basis that the first load shed is the first load added and which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with zones having the least deviation from comfort is shed first.
Claim 11
Dependent Claim
69 words
The system of claim 7 wherein said processor means includes means for determining which of said plurality of loads are assigned to a rotational routine for shedding and adding loads on the basis that the first load shed is the first load added and which are assigned to a sequential routine for shedding and adding loads on the basis that the last load shed is the first load added.
Claim 12
Dependent Claim
74 words
The system of claim 7 wherein said processor means includes means for determining which of said loads are assigned to a sequential routine for shedding and adding loads on the basis that the last load shed is the first load added and which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with the zone having the least deviation from comfort is shed first.
Claim 13
Dependent Claim
99 words
The system of claim 7 wherein said processor means includes means for determining which of said loads are assigned to a rotational routine for adding and shedding loads on the basis that the first load shed is the first load added, which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with the zone having the least deviation from comfort is shed first, and which are assigned to a sequential routine for adding and shedding loads on the basis that the last load shed is the first load added.
Claim 14
Dependent Claim
76 words
The system of claim 7 wherein said processor means includes means for shedding loads associated with up to a predetermined number of shed orders as power consumption within said building approaches a floating demand limit and for allowing said floating demand limit to float upward as power consumption increases until said floating demand limit bears a predetermined relationship with a power demand limit at which time loads associated with the remaining shed orders can be shed.
Claim 15
Dependent Claim
75 words
The system of claim 12 wherein said processor means includes means for determining which of said plurality of loads are assigned to a rotational routine for shedding and adding loads on the basis that the first load shed is the first load added and which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with zones having the least deviation from comfort is shed first.
Claim 16
Dependent Claim
69 words
The system of claim 12 wherein said processor means includes means for determining which of said plurality of loads are assigned to a rotational routine for shedding and adding loads on the basis that the first load shed is the first load added and which are assigned to a sequential routine for shedding and adding loads on the basis that the last load shed is the first load added.
Claim 17
Dependent Claim
74 words
The system of claim 12 wherein said processor means includes means for determining which of said loads are assigned to a sequential routine for shedding and adding loads on the basis that the last load shed is the first load added and which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with the zone having the least deviation from comfort is shed first.
Claim 18
Dependent Claim
99 words
The system of claim 12 wherein said processor means includes means for determining which of said loads are assigned to a rotational routine for adding and shedding loads on the basis that the first load shed is the first load added, which are assigned to a comfort fairness routine for adding and shedding loads on the basis that the load associated with the zones having the least deviation from comfort is shed first, and which are assigned to a sequential routine for adding and shedding loads on the basis that the last load shed is the first load added.
Claim 19
Dependent Claim
48 words
The system of claim 16 wherein said processor means comprises means for assigning the last shed order to a manual shed routine in which loads must be manually shed if power consumption continues to increase even after the loads associated with all other shed orders have been shed.
References Cited (Backward Citations)
US4125782A
Cited
US4216384A
Cited
US4167786A
Cited
US4211933A
Cited
US4354241A
Cited
US4337401A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1988-04-08 | 1988-10-08 | 1989-04-09 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1992-04-08 | 1992-10-08 | 1993-04-09 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1996-04-08 | 1996-10-08 | 1997-04-09 | $7700.00 | Window Closed / Lapsed |