Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
122 words
A load shedding system for shedding loads within a building to maintain power demand below a predetermined limit, said loads affecting actual conditions in associated zones within said building with respect to desired conditions, said system comprising: condition sensing means for sensing said actual conditions in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said condition sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between said actual conditions and said desired conditions being shed first and those loads having the most deviation being shed last to maintain said demand below said predetermined limit.
Claim 2
Dependent Claim
122 words
A load shedding system for shedding loads within a building to maintain power demand below a predetermined limit, said loads affecting actual conditions in associated zones within said building with respect to desired conditions, said system comprising: condition sensing means for sensing said actual conditions in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said condition sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between said actual conditions and said desired conditions being shed first and those loads having the most deviation being shed last to maintain said demand below said predetermined limit.
Claim 3
Dependent Claim
60 words
The system of claim 1 in which said control means comprises means for adding loads in order of those loads affecting those zones having the highest deviation between said actual conditions and said desired conditions being added first and those loads having the least deviation being added last to the extent that said demand can be maintained below said limit.
Claim 4
Dependent Claim
127 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit, said loads affecting the temperature in associated zones within said building with respect to the desired temperatures for said zones, said system comprising: temperature sensing means for sensing said temperatures in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said temperature sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads having the most deviation being shed last to maintain said demand below said limit.
Claim 5
Dependent Claim
127 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit, said loads affecting the temperature in associated zones within said building with respect to the desired temperatures for said zones, said system comprising: temperature sensing means for sensing said temperatures in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said temperature sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads having the most deviation being shed last to maintain said demand below said limit.
Claim 6
Dependent Claim
60 words
The system of claim 3 in which said control means comprises means for adding loads in order of those loads affecting those zones having the highest deviation between said actual temperatures and said desired temperatures being added first and those loads having the least deviation being added last to the extent that said demand can be maintained below said limit.
Claim 7
Dependent Claim
133 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit wherein said loads which are shed are those loads which control the temperatures in zones supplied with air treated by said loads, said loads having a desired temperature to which said actual temperature is controlled, said system comprising: temperature sensing means for sensing said actual temperatures in said zones of said building; and, control means connected to said temperature sensing means and to said loads for shedding said loads in order of those loads controlling those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads controlling those zones having the most deviation being shed last to maintain said demand below said limit.
Claim 8
Dependent Claim
133 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit wherein said loads which are shed are those loads which control the temperatures in zones supplied with air treated by said loads, said loads having a desired temperature to which said actual temperature is controlled, said system comprising: temperature sensing means for sensing said actual temperatures in said zones of said building; and, control means connected to said temperature sensing means and to said loads for shedding said loads in order of those loads controlling those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads controlling those zones having the most deviation being shed last to maintain said demand below said limit.
Claim 9
Dependent Claim
60 words
The system of claim 5 in which said control means comprises means for adding loads in order of those loads affecting those zones having the highest deviation between said actual temperatures and said desired temperatures being added first and those loads having the least deviation being added last to the extent that said demand can be maintained below said limit.