← Back to Patent Explorer
US4337401A Expired / Lapsed US ⏱️ 0.0 years remaining

Adaptive load shedding

Assignee: Honeywell Inc
•
Filing: 1981-01-23
•
Granted: 1982-06-29
•
Expires: 2001-01-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A load shedding system for shedding loads within a building to maintain power demand within the building below a predetermined level (i.e. current demand limit) wherein the loads which can be shed are those which affect or control actual conditions in the zones associated with the loads is disclosed having condition sensors for sensing conditions such as temperature in the zones of a building and a control apparatus responsive to the conditions being sensed by the condition sensors and connected to the loads for shedding the loads in order of those loads affecting or controlling the zones having the least deviation between the actual condition and a desired condition being shed first and those loads affecting or controlling those zones having the most deviation being shed last to maintain power demand below the predetermined level.

Inventors

  • 👤 Harold J. Olson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 20:14
CPC Classifications
G; G05; G05D; G05D23/00; G05D23/19; G05D23/1927; G05D23/193; G05D23/1932; G05D23/1934; H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; H02J2105/00; H02J2105/50; H02J2105/52; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 122 words
A load shedding system for shedding loads within a building to maintain power demand below a predetermined limit, said loads affecting actual conditions in associated zones within said building with respect to desired conditions, said system comprising: condition sensing means for sensing said actual conditions in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said condition sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between said actual conditions and said desired conditions being shed first and those loads having the most deviation being shed last to maintain said demand below said predetermined limit.
Claim 2
Dependent Claim 122 words
A load shedding system for shedding loads within a building to maintain power demand below a predetermined limit, said loads affecting actual conditions in associated zones within said building with respect to desired conditions, said system comprising: condition sensing means for sensing said actual conditions in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said condition sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between said actual conditions and said desired conditions being shed first and those loads having the most deviation being shed last to maintain said demand below said predetermined limit.
Claim 3
Dependent Claim 60 words
The system of claim 1 in which said control means comprises means for adding loads in order of those loads affecting those zones having the highest deviation between said actual conditions and said desired conditions being added first and those loads having the least deviation being added last to the extent that said demand can be maintained below said limit.
Claim 4
Dependent Claim 127 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit, said loads affecting the temperature in associated zones within said building with respect to the desired temperatures for said zones, said system comprising: temperature sensing means for sensing said temperatures in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said temperature sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads having the most deviation being shed last to maintain said demand below said limit.
Claim 5
Dependent Claim 127 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit, said loads affecting the temperature in associated zones within said building with respect to the desired temperatures for said zones, said system comprising: temperature sensing means for sensing said temperatures in said zones of said building; connecting means adapted to be connected to said loads within said building; and, control means connected to said temperature sensing means and to said connecting means for shedding said loads in order of those loads affecting those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads having the most deviation being shed last to maintain said demand below said limit.
Claim 6
Dependent Claim 60 words
The system of claim 3 in which said control means comprises means for adding loads in order of those loads affecting those zones having the highest deviation between said actual temperatures and said desired temperatures being added first and those loads having the least deviation being added last to the extent that said demand can be maintained below said limit.
Claim 7
Dependent Claim 133 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit wherein said loads which are shed are those loads which control the temperatures in zones supplied with air treated by said loads, said loads having a desired temperature to which said actual temperature is controlled, said system comprising: temperature sensing means for sensing said actual temperatures in said zones of said building; and, control means connected to said temperature sensing means and to said loads for shedding said loads in order of those loads controlling those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads controlling those zones having the most deviation being shed last to maintain said demand below said limit.
Claim 8
Dependent Claim 133 words
A load shedding system for shedding loads within a building to maintain power demand within the building below a demand limit wherein said loads which are shed are those loads which control the temperatures in zones supplied with air treated by said loads, said loads having a desired temperature to which said actual temperature is controlled, said system comprising: temperature sensing means for sensing said actual temperatures in said zones of said building; and, control means connected to said temperature sensing means and to said loads for shedding said loads in order of those loads controlling those zones having the least deviation between the actual temperatures and the desired temperatures being shed first and those loads controlling those zones having the most deviation being shed last to maintain said demand below said limit.
Claim 9
Dependent Claim 60 words
The system of claim 5 in which said control means comprises means for adding loads in order of those loads affecting those zones having the highest deviation between said actual temperatures and said desired temperatures being added first and those loads having the least deviation being added last to the extent that said demand can be maintained below said limit.

References Cited (Backward Citations)

US4100428A Cited
US4064485A Cited
US4136392A Cited
US4125782A Cited
US4135101A Cited
US4147296A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-06-28 1985-12-28 1986-06-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-06-28 1989-12-28 1990-06-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-06-28 1993-12-28 1994-06-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag