US4161028A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Electric demand control system
Assignee: Leeds and Northrup Co
•
Filing: 1978-05-30
•
Granted: 1979-07-10
•
Expires: 1998-05-30
Abstract
Abstract There is disclosed a method and means for continuously controlling the consumption of power by an industrial customer wherein the control is accomplished by controlling the generation of the customer's own power source and/or his load in response to a signal representing the change necessary to make the energy consumed equal the demand limit. The gain of the control response is modified so that it is increased with increases in the difference between the energy actually consumed and the desired consumption.
Inventors
- 👤 3rd Frederick B. Davis
- 👤 Charles W. Ross
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 00:37
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/38; H02J3/46; H02J3/48; G; G01; G01R; G01R21/00; G01R21/007; G01R21/008; G06; G06G; G06G7/00; G06G7/48; G06G7/62; G06G7/63; G06G7/635; H02J3/466
Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
170 words
A control system for controlling the consumption of power by a customer over a tie line connected to transfer power between a distribution system and said customer without the consumption exceeding a predetermined energy demand limit during a predetermined demand period, comprising: means for determining the power transfer deviation as the change in generation or load required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; means for determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; means for controlling said generation or load in response to said power transfer deviation to tend to reduce that deviation toward zero; and means for modifying the response of said control means in response to a quantity which is a joint function of said energy transfer deviation and the unelapsed time in the demand period.
Claim 2
Dependent Claim
170 words
A control system for controlling the consumption of power by a customer over a tie line connected to transfer power between a distribution system and said customer without the consumption exceeding a predetermined energy demand limit during a predetermined demand period, comprising: means for determining the power transfer deviation as the change in generation or load required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; means for determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; means for controlling said generation or load in response to said power transfer deviation to tend to reduce that deviation toward zero; and means for modifying the response of said control means in response to a quantity which is a joint function of said energy transfer deviation and the unelapsed time in the demand period.
Claim 3
Dependent Claim
164 words
A control system for controlling the consumption of power by a customer over a tie line connected to transfer power between a distribution system and said customer without the consumption exceeding a predetermined energy demand limit during a predetermined demand period, comprising: means for determining the power transfer deviation as the change in generation or load required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; means for determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; means for controlling said generation or load in response to said power transfer deviation to tend to reduce that deviation toward zero; and means for modifying the response of said control means in response to a quantity which is a function of the unelapsed time in the demand period.
Claim 4
Dependent Claim
164 words
A control system for controlling the consumption of power by a customer over a tie line connected to transfer power between a distribution system and said customer without the consumption exceeding a predetermined energy demand limit during a predetermined demand period, comprising: means for determining the power transfer deviation as the change in generation or load required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; means for determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; means for controlling said generation or load in response to said power transfer deviation to tend to reduce that deviation toward zero; and means for modifying the response of said control means in response to a quantity which is a function of the unelapsed time in the demand period.
Claim 5
Dependent Claim
161 words
A control system for controlling the consumption of power by a customer over a tie line connected to transfer power between a distribution system and said customer without the consumption exceeding a predetermined energy demand limit during a predetermined demand period, comprising: means for determining the power transfer deviation as the change in generation or load required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; means for determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; means for controlling said generation or load in response to said power transfer deviation to tend to reduce that deviation toward zero; and means for modifying the response of said control means in response to a quantity which is a function of said energy transfer deviation.
Claim 6
Dependent Claim
161 words
A control system for controlling the consumption of power by a customer over a tie line connected to transfer power between a distribution system and said customer without the consumption exceeding a predetermined energy demand limit during a predetermined demand period, comprising: means for determining the power transfer deviation as the change in generation or load required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; means for determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; means for controlling said generation or load in response to said power transfer deviation to tend to reduce that deviation toward zero; and means for modifying the response of said control means in response to a quantity which is a function of said energy transfer deviation.
Claim 7
Dependent Claim
34 words
A control system as set forth in claim 1 or 2 in which said time function is the reciprocal of the quantity calculated as the total time in the period minus the elapsed time.
Claim 8
Dependent Claim
30 words
A control system as set forth in claim 1 or 2 in which said time function is calculated as the elapsed time divided by the total time in the period.
Claim 9
Dependent Claim
146 words
A control system as set forth in claim 1, 2, or 3, which includes: means for determining the average power required to be transferred over said tie line during the unelapsed portion of the demand period to make the energy transferred during the period equal to the demand limit; means for preventing said control means from increasing the customer's generation or decreasing the customer's load when neither said power transfer deviation nor said average power requirement is in sense such that said control means call for control action of such sense and is of magnitude exceeding a predetermined value; means for preventing said control means from decreasing said generation or restoring the load when either said power transfer deviation or said average power requirement is in sense such that said control means calls for that sense of change and is of magnitude exceeding a predetermined value.
Claim 10
Dependent Claim
34 words
A control system as set forth in claim 1, 2, or 3, in which said control modifying means filters out the effect on said control means of rapid fluctuations in said power transfer deviations.
Claim 11
Dependent Claim
43 words
A control system as set forth in claim 1, 2, or 3, in which said modifying means introduces a first-order lag in the power transfer deviation input to the controller with the time constant of the lag being a function of said quantity.
Claim 12
Dependent Claim
41 words
A control system as set forth in claim 1, 2, or 3, in which said modifying means is a filter means which modifies the gain of said control when the power transfer deviation exceeds a predetermined limit for a predetermined time.
Claim 13
Dependent Claim
53 words
A control system as set forth in claim 1 or 3 in which said modification is only in a sense such that the response of said control means is increased for values of said power transfer deviation which cause the controller to call for an increase in generation or a decrease in load.
Claim 14
Independent Claim
159 words
The method for controlling the generation of power by a customer connected through a tie line to transfer power between a distribution system and said customer without the customer's consumption exceeding a predetermined energy demand limit for a predetermined demand period, comprising the steps of: determining the power transfer deviation as a change in generation required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; controlling said generation in response to said power transfer deviation to tend to reduce said power transfer deviation toward zero; and modifying said control in response to said energy transfer deviation so as to increase the gain of the control response as said energy transfer deviation increases.
Claim 15
Independent Claim
159 words
The method for controlling the generation of power by a customer connected through a tie line to transfer power between a distribution system and said customer without the customer's consumption exceeding a predetermined energy demand limit for a predetermined demand period, comprising the steps of: determining the power transfer deviation as a change in generation required by the customer under existing conditions to make the energy transferred to the customer over the whole demand period correspond to the demand limit; determining the energy transfer deviation as the deviation between the amount of energy actually transferred during the elapsed portion of the existing demand period and the desired energy transfer for that portion; controlling said generation in response to said power transfer deviation to tend to reduce said power transfer deviation toward zero; and modifying said control in response to said energy transfer deviation so as to increase the gain of the control response as said energy transfer deviation increases.
References Cited (Backward Citations)
US3387121A
Cited
US3419772A
Cited
US3454749A
Cited
US3505508A
Cited
US3522421A
Cited
US3539785A
Cited
US3652838A
Cited
US3932735A
Cited
US3872286A
Cited
US4100428A
Cited
US4075699A
Cited
US4064485A
Cited
US4125895A
Cited
US4117537A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1982-07-09 | 1983-01-08 | 1983-07-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1986-07-09 | 1987-01-08 | 1987-07-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1990-07-09 | 1991-01-08 | 1991-07-10 | $7700.00 | Window Closed / Lapsed |