Patent US5263638A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5263638A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of manufacturing an article by superplastic forming and diffusion bonding and a vacuum chamber for use in processing workpieces for superplastic forming and diffusion bonding

Assignee: Rolls Royce PLC
•
Filing: 1993-04-28
•
Granted: 1993-11-23
•
Expires: 2013-04-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A stack of titanium sheets are placed on a worktable in a vacuum chamber. One of the mating surfaces of each pair of mating surfaces has had a stop off material applied in a desired pattern to prevent diffusion bonding. A pump evacuates the vacuum chamber and heaters heat the stack to evaporate volatile binder from the stop off. When all the binder has been removed the worktable is moved relative to an electron beam gun to weld the edges of the sheets together to form a sealed assembly. The volatile binder is removed quickly and oxidation of the titanium is prevented during baking out of the binder. The sealed assembly is then heated and externally pressurised to diffusion bond the sheets together. The integral structure is then heated and internally pressured to superplastically form one of the sheets to produce an article of predetermined shape.

Inventors

  • 👤 Joseph Douglas

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 15:30
CPC Classifications
B; B23; B23K; B23K20/00; B23K20/18; B21; B21D; B21D53/00; B21D53/02; B21D53/04; B21D53/045; B23K20/14

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 229 words
A method of manufacturing an article by superplastic forming and diffusion bonding at least two metal workpieces comprising the steps of (a) applying a stop off material of a type preventing diffusion bonding in a binder to prevent diffusion bonding to preselected areas of at least one of the surfaces of at least one of the at least two metal workpieces, (b) assembling the at least two workpieces into a stack relative to each other so that the surfaces are in mating abutment, (c) placing the stack in a vacuum chamber, (d) evacuating the vacuum chamber (e) heating the stack while it is within the vacuum chamber to evaporate volatile binder from the stop off material, while continuously evacuating the vacuum chamber to remove the volatile binder from between the at least two workpieces and the vacuum chamber, (f) welding the edges of the at least two workpieces while the stack is within the vacuum chamber to provide an evacuated sealed assembly, (g) applying heat and pressure across the thickness of the at least two workpieces to diffusion bond the at least two workpieces together in areas other than the preselected areas to form an integral structure, (h) heating the integral structure and internally pressurizing it to cause the preselected areas of at least one of the workpieces to be superplastically formed to produce an article of predetermined shape.
Claim 2
Independent Claim 229 words
A method of manufacturing an article by superplastic forming and diffusion bonding at least two metal workpieces comprising the steps of (a) applying a stop off material of a type preventing diffusion bonding in a binder to prevent diffusion bonding to preselected areas of at least one of the surfaces of at least one of the at least two metal workpieces, (b) assembling the at least two workpieces into a stack relative to each other so that the surfaces are in mating abutment, (c) placing the stack in a vacuum chamber, (d) evacuating the vacuum chamber (e) heating the stack while it is within the vacuum chamber to evaporate volatile binder from the stop off material, while continuously evacuating the vacuum chamber to remove the volatile binder from between the at least two workpieces and the vacuum chamber, (f) welding the edges of the at least two workpieces while the stack is within the vacuum chamber to provide an evacuated sealed assembly, (g) applying heat and pressure across the thickness of the at least two workpieces to diffusion bond the at least two workpieces together in areas other than the preselected areas to form an integral structure, (h) heating the integral structure and internally pressurizing it to cause the preselected areas of at least one of the workpieces to be superplastically formed to produce an article of predetermined shape.
Claim 3
Dependent Claim 70 words
A method of manufacturing an article as claimed in claim 1 including after welding the edges of the at least two workpieces to provide a sealed assembly and before applying heat and pressure across the thickness of the at least two workpieces to diffusion bond the at least two workpieces together, the steps of removing the sealed assembly from the vacuum chamber and placing the sealed assembly in an autoclave.
Claim 4
Dependent Claim 31 words
A method as claimed in claim 1 wherein the stack is heated to a temperature between 250° C. and 350° C. to evaporate the volatile binder from the stop off material.
Claim 5
Dependent Claim 22 words
A method as claimed in claim 1 wherein the edges of the at least two workpieces are welded using an electron beam.
Claim 6
Dependent Claim 57 words
A method as claimed in claim 1 wherein, where the workpieces are made of a titanium alloy, the workpieces are heated to a temperature equal to or greater than 850° C. and the pressure applied is equal to or greater than 294 lbs per square inch to diffusion bond the workpieces together to form an integral structure.
Claim 7
Dependent Claim 37 words
A method as claimed in claim 5 wherein the workpieces are heated to a temperature between 900° C. and 950° C. and the pressure applied is between 294 lbs per square inch and 441 per square inch.
Claim 8
Dependent Claim 29 words
A method as claimed in claim 5 wherein the integral structure is heated to a temperature equal to or greater than 850° C. to superplastically form the integral structure.
Claim 9
Dependent Claim 23 words
A method as claimed in claim 7 wherein the integral 20 structure is heated to a temperature between 900° C. and 950° C.
Claim 10
Dependent Claim 43 words
A method as claimed in claim 1 including monitoring the levels of binder evacuated from the vacuum chamber while the vacuum chamber is being continuously evacuated to determine when substantially all the binder has been removed from between the at least two workpieces.
Claim 11
Dependent Claim 80 words
A method as claimed in claim 1, wherein after applying heat and pressure across the thickness of the at least two workpieces to diffusion bond the at least two workpieces together to form the integral structure and before heating the integral structure and internally pressurizing said structure to cause superplastic forming of at least one of the workpieces, the method further includes the step of removing the integral structure from the vacuum chamber and placing said structure between shaped dies.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1996-11-22 1997-05-24 1997-11-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2000-11-22 2001-05-24 2001-11-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2004-11-22 2005-05-24 2005-11-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag