← Back to Patent Explorer
US5177688A Expired / Lapsed US ⏱️ 0.0 years remaining

Assembly line balancer

Assignee: Texas Instruments Inc
•
Filing: 1992-01-13
•
Granted: 1993-01-05
•
Expires: 2012-01-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Assembly line balancer groups tasks of multi-sided, mixed model assembly lines on the basis of per side and per model constraints. Resulting compound tasks involve less computational time and power in balancing the line.

Inventors

  • 👤 David Rentschler
  • 👤 David B. Stevens

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 13:22
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41835; G05B2219/00; G05B2219/30; G05B2219/32; G05B2219/32056; Y; Y02; Y02P; Y02P90/00; Y02P90/02

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 151 words
A method for balancing the assignment of a plurality of tasks to a plurality of workstations, comprising the steps of: (a) providing a plurality of partially ordered sets of tasks, each of which tasks has an assigned task time; (b) linearly ordering each of said sets by a ranking technique based on said task times; (c) grouping a plurality of said tasks between said sets on the basis of a first class of constraints; (d) linearly reordering each of said task sets by a ranking technique based on said task times wherein the rank of a task in one of said groups is replaced by the maximum of the ranks of the tasks in said group during said reordering; and (e) selecting for assignment to workstations groups of tasks in order of their rank and without violating a first plurality of constraints, wherein each of said workstations has a cycle time.
Claim 2
Independent Claim 151 words
A method for balancing the assignment of a plurality of tasks to a plurality of workstations, comprising the steps of: (a) providing a plurality of partially ordered sets of tasks, each of which tasks has an assigned task time; (b) linearly ordering each of said sets by a ranking technique based on said task times; (c) grouping a plurality of said tasks between said sets on the basis of a first class of constraints; (d) linearly reordering each of said task sets by a ranking technique based on said task times wherein the rank of a task in one of said groups is replaced by the maximum of the ranks of the tasks in said group during said reordering; and (e) selecting for assignment to workstations groups of tasks in order of their rank and without violating a first plurality of constraints, wherein each of said workstations has a cycle time.
Claim 3
Dependent Claim 28 words
The method of claim 1 wherein said ranking technique ranks said tasks by said task time plus the sum of all said task times of all subsequent tasks.
Claim 4
Dependent Claim 38 words
The method of claim 1 comprising the further steps of: (a) repeating the steps (b)-(e) at least once with a different cycle time for each repetition; and (b) selecting one of the resulting assignments of tasks to workstations.
Claim 5
Dependent Claim 92 words
The method of claim 1, comprising the further steps of: (f) regrouping a plurality of said tasks between said sets on the basis of a second class of constraints; and (g) second linearly reordering each of said task sets of a ranking technique based on said task times wherein the rank of a task in one of said regroups is replaced by the maximum of the ranks of the tasks in said regroup of step (f) during said second reordering; (h) wherein step (e) applies to said regroups instead of said groups.
Claim 6
Dependent Claim 29 words
The method of claim 4 wherein said second ranking technique ranks said tasks by said task time plus the sum of all said task times of all subsequent tasks.
Claim 7
Dependent Claim 40 words
The method of steps (a)-(b) of claim 4 comprising the further steps of: (a) repeating the steps at least once with a different cycle time for each repetition; and (b) selecting one of the resulting assignments of tasks to workstations.
Claim 8
Dependent Claim 22 words
The method of claim 4, wherein said ranking technique of step (g) is the same as the ranking technique of step (d).
Claim 9
Dependent Claim 40 words
The method of steps (b)-(e) of claim 1 comprising the further steps of: (a) repeating the steps at least once with a different cycle time for each repetition; and (b) selecting one of the resulting assignments of tasks to workstations.
Claim 10
Dependent Claim 99 words
The method of claim 1, further comprising the step of displaying a range of possible outcomes of an assembly line balance by providing at least one of a plurality of displays, said plurality including: (i) a display of the number of required workstations and the cumulative idle time for an input range of cycle times; (ii) a display of the required cycle time and the cumulative idle time for an input range of the number of required workstations; (iii) a display of the number of required workstations and the cumulative idle time for an input range of production rates.
Claim 11
Independent Claim 152 words
A system for assembly line balancing the assignment of a plurality of tasks for a plurality of models of a product to a plurality of workstations based on precedence and grouping constraints, comprising: (a) a knowledge base wherein task parameters and said precedence and grouping constraints are input and stored; and (b) processing circuitry coupled to said knowledge base for linearly ordering each of said tasks by a ranking technique based on said task parameters, grouping of a plurality of said tasks on the basis of said grouping constraints, linearly reordering of each of said tasks by a ranking technique wherein the rank of a task in one of said groups is replaced by the maximum of the ranks of the tasks in said group during said reordering, and selecting for assignment to said workstations of groups of tasks in order of their rank and without violating said precedence and grouping constraints.
Claim 12
Independent Claim 152 words
A system for assembly line balancing the assignment of a plurality of tasks for a plurality of models of a product to a plurality of workstations based on precedence and grouping constraints, comprising: (a) a knowledge base wherein task parameters and said precedence and grouping constraints are input and stored; and (b) processing circuitry coupled to said knowledge base for linearly ordering each of said tasks by a ranking technique based on said task parameters, grouping of a plurality of said tasks on the basis of said grouping constraints, linearly reordering of each of said tasks by a ranking technique wherein the rank of a task in one of said groups is replaced by the maximum of the ranks of the tasks in said group during said reordering, and selecting for assignment to said workstations of groups of tasks in order of their rank and without violating said precedence and grouping constraints.
Claim 13
Independent Claim 249 words
A method for balancing the assignment of a plurality of tasks to a plurality of workstations, wherein said tasks are for a plurality of models of a product, each of which models has a plurality of sides, comprising the steps of: (a) providing for each of said sides of each of said models a partially ordered sets of tasks, each of which tasks has an assigned task time; (b) linearly ordering each of said sets by a ranking technique based on said task times; (c) grouping a plurality of said tasks between said sides on the basis of a first class of constraints; (d) linearly reordering each of said task sets by a ranking technique based on said task times wherein the rank of a task in one of said groups is replaced by the maximum of the ranks of the tasks in said group during said reordering; (e) regrouping a plurality of said tasks between said models on the basis of a second class of constraints; (f) second linearly reordering each of said task sets by a ranking technique based on said task times wherein the rank of a task in one of said regroups is replaced by the maximum of the ranks of the tasks in said regroup of step (e) during said second ranking; and (g) selecting for assignment to workstations regroups of tasks in order of their rank and without violating a first plurality of constraints, wherein each of said workstations has a cycle time.
Claim 14
Independent Claim 249 words
A method for balancing the assignment of a plurality of tasks to a plurality of workstations, wherein said tasks are for a plurality of models of a product, each of which models has a plurality of sides, comprising the steps of: (a) providing for each of said sides of each of said models a partially ordered sets of tasks, each of which tasks has an assigned task time; (b) linearly ordering each of said sets by a ranking technique based on said task times; (c) grouping a plurality of said tasks between said sides on the basis of a first class of constraints; (d) linearly reordering each of said task sets by a ranking technique based on said task times wherein the rank of a task in one of said groups is replaced by the maximum of the ranks of the tasks in said group during said reordering; (e) regrouping a plurality of said tasks between said models on the basis of a second class of constraints; (f) second linearly reordering each of said task sets by a ranking technique based on said task times wherein the rank of a task in one of said regroups is replaced by the maximum of the ranks of the tasks in said regroup of step (e) during said second ranking; and (g) selecting for assignment to workstations regroups of tasks in order of their rank and without violating a first plurality of constraints, wherein each of said workstations has a cycle time.
Claim 15
Dependent Claim 27 words
The method of claim 11 wherein said ranking technique ranks said tasks by said task time plus the sum of said task times of all subsequent tasks.
Claim 16
Dependent Claim 16 words
The method of claim 11 wherein said cycle time is equal for all of said workstations.
Claim 17
Dependent Claim 29 words
The method of claim 11 wherein, given n workstations running in parallel, and a nominal cycle time T, the cycle time of each of said n workstations is n×T.
Claim 18
Dependent Claim 22 words
The method of claim 11, wherein said ranking technique of step (d) is the same as the ranking technique of step (f).
Claim 19
Dependent Claim 99 words
The method of claim 7, further comprising the step of displaying a range of possible outcomes of an assembly line balance by providing at least one of a plurality of displays, said plurality including: (i) a display of the number of required workstations and the cumulative idle time for an input range of cycle times; (ii) a display of the required cycle time and the cumulative idle time for an input range of the number of required workstations; (iii) a display of the number of required workstations and the cumulative idle time for an input range of production rates.

References Cited (Backward Citations)

US4459663A Cited
US4561060A Cited
US4591983A Cited
US4802094A Cited
US4747130A Cited
US4958292A Cited
US4937755A Cited
US4994980A Cited
US5053970A Cited
US4887218A Cited
US4942527A Cited
US4896269A Cited
US4931944A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1996-01-05 1996-07-06 1997-01-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2000-01-05 2000-07-06 2001-01-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2004-01-05 2004-07-06 2005-01-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag