Patent US4703799A successfully refreshed from Google Patents.
US4703799A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Technique for improving gravel pack operations in deviated wellbores
Assignee: Mobil Oil AS
•
Filing: 1986-01-03
•
Granted: 1987-11-03
•
Expires: 2006-01-03
Abstract
Abstract A method for completion of an inclined or deviated well having an in-line opening on its lower side. A work string tubing is removed and a production tube having a slotted liner is directed through a gelled fluid. The gelled fluid is removed and an in-casing gravel pack is placed within said wellbore. Hydrocarbonaceous fluids are then produced from said wellbore.
Inventors
- 👤 Alfred R. Jennings, Jr.
- 👤 Malcolm K. Strubhar
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 17:40
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/04; E21B43/025; E21B43/30; E21B43/305
Claims Analysis
Total Claims: 32
Claim 1
Independent Claim
174 words
A method for completion of a well having a deviated wellbore comprising: (a) cementing a casing string in said wellbore; (b) running a work string tubing through said casing string; (c) penetrating through said casing string into a hydrocarbonaceous pay zone via an in-line opening on the low side of said casing thus fluidly communicating said pay zone with said wellbore; (d) removing any excess particulate matter from said tubing and injecting a chemical blocking agent substantially above said in-line opening which agent upon solidification forms a plug which prevents fluids from entering said wellbore through said opening; (e) placing a weighted solution on top of said plug in an amount sufficient to allow change-out of said work string tubing with a production tubing and slotted liner; (f) directing said production tubing and slotted liner through said weighted solution and said plug; and (g) removing said plug, other solidified blocking agent, and gravel packing the in-casing well area in a manner sufficient to exclude particulate matter from said well when producing hydrocarbonaceous fluids therefrom.
Claim 2
Independent Claim
174 words
A method for completion of a well having a deviated wellbore comprising: (a) cementing a casing string in said wellbore; (b) running a work string tubing through said casing string; (c) penetrating through said casing string into a hydrocarbonaceous pay zone via an in-line opening on the low side of said casing thus fluidly communicating said pay zone with said wellbore; (d) removing any excess particulate matter from said tubing and injecting a chemical blocking agent substantially above said in-line opening which agent upon solidification forms a plug which prevents fluids from entering said wellbore through said opening; (e) placing a weighted solution on top of said plug in an amount sufficient to allow change-out of said work string tubing with a production tubing and slotted liner; (f) directing said production tubing and slotted liner through said weighted solution and said plug; and (g) removing said plug, other solidified blocking agent, and gravel packing the in-casing well area in a manner sufficient to exclude particulate matter from said well when producing hydrocarbonaceous fluids therefrom.
Claim 3
Dependent Claim
19 words
The method as recited in claim 1 where in step (c) said in-line opening comprises at least one notch.
Claim 4
Dependent Claim
19 words
The method as recited in claim 1 where in step (c) said in-line opening comprises at least two perforations.
Claim 5
Dependent Claim
28 words
The method as recited in claim 1 where in step (c) said opening comprises perforations having at least four perforations per foot which perforations are zero degree phased.
Claim 6
Dependent Claim
29 words
The method as recited in claim 1 where in step(d) said blocking agent comprises a solidifiable gel mixture which solidifies or sets-up after about 2 to about 4 hours.
Claim 7
Dependent Claim
35 words
The method as recited in claim 1 where in step(d) said blocking agent comprises a solidifiable gel mixture which forms a solid sufficient to withstand pressures of from about 500 psig to about 20,000 psig.
Claim 8
Dependent Claim
30 words
The method as recited in claim 1 wherein step(d) said blocking agent comprises a solidifiable gel mixture which forms a solid able to withstand temperatures greater than about 450° F.
Claim 9
Dependent Claim
50 words
The method as recited in claim 1 where in step(d) said blocking agent comprises a solidifiable gel mixture which becomes solid or sets-up and is made thermally stable for temperatures of from about 350° F. to about 450° F. for from about 0.5 of a day to about 4 days.
Claim 10
Dependent Claim
59 words
The method as recited in claim 1 where in step(d) said blocking agent comprises a solidifiable gel mixture into which a gel breaker is added in amounts sufficient to breakdown the subsequently formed solid or set-up gel at temperatures of less than from about 60° F. to about 250° F. within from about 2 hours to about 24 hours.
Claim 11
Dependent Claim
58 words
The method as recited in claim 1 where in step(d) said blocking agent comprises a solidifiable gel mixture into which an oxygen scavenger is placed in a concentration of about 0.10 about 0.75 weight percent of said mixture, and said oxygen scavenger is a material selected from the group consisting of sodium thiosulfate and a short chain alcohol.
Claim 12
Dependent Claim
52 words
The method as recited in claim 1 where in step(d) said blocking agent comprises a solidifiable gel mixture which contains a gel breaker capable of breaking down a subsequently formed solid gel at temperatures less than from about 60° F. to about 250° F. within from about 2 to about 24 hours.
Claim 13
Dependent Claim
52 words
The method as recited in claim 1 wherein in step (d) said blocking agent comprises a solidifiable gel mixture which contains a gel breaker capable of breaking down said subsequently formed solid gel where said gel breaker is a material selected from the group consisting of an enzyme and an oxidizing agent.
Claim 14
Dependent Claim
40 words
The method as recited in claim 1 where in step(g) the plug and other solidified blocking agent are removed from the wellbore and treated pay zone by hydrochloric acid in a strength of about 7.5 to about 15.0 volume percent.
Claim 15
Dependent Claim
44 words
The method as recited in claim 1 where after step(c) the pay zone is treated via said in-line opening with a filtering means to pack the area in the formation behind said in-line opening which means comprises a squeeze pack or small fracture treatment.
Claim 16
Dependent Claim
44 words
The method as recited in claim 1 where in step(e) said weighted solution is a member selected from the group consisting of sodium chloride, calcium chloride, potassium chloride, and natural brine in a strength of about 10 to about 28 weight percent in water.
Claim 17
Independent Claim
188 words
A method for well completion in an inclined wellbore in an offshore location which wellbore contains an in-casing gravel pack to control formation fines comprising: (a) cementing a casing string in said wellbore; (b) running a work string tubing through said casing string; (c) penetrating through said tubing into a hydrocarbonaceous pay zone via an in-line opening said tubing on the low side of said casing thus fluidly communicating said pay zone with said wellbore; (d) removing any excess particulate matter from said tubing and injecting a chemical blocking agent substantially above said in-line opening which agent upon solidification forms a plug which prevents fluids from entering said wellbore through said opening; (e) placing a weighted solution on top of said plug in an amount sufficient to allow change-out of said work string tubing with a production tubing and slotted liner; (f) directing said production tubing and slotted liner through said weighted solution and said plug; and (g) removing said plug, other solidified blocking agent, and gravel packing the in-casing well area in a manner sufficient to exclude particulate matter from said well when producing hydrocarbonaceous fluids therefrom.
Claim 18
Independent Claim
188 words
A method for well completion in an inclined wellbore in an offshore location which wellbore contains an in-casing gravel pack to control formation fines comprising: (a) cementing a casing string in said wellbore; (b) running a work string tubing through said casing string; (c) penetrating through said tubing into a hydrocarbonaceous pay zone via an in-line opening said tubing on the low side of said casing thus fluidly communicating said pay zone with said wellbore; (d) removing any excess particulate matter from said tubing and injecting a chemical blocking agent substantially above said in-line opening which agent upon solidification forms a plug which prevents fluids from entering said wellbore through said opening; (e) placing a weighted solution on top of said plug in an amount sufficient to allow change-out of said work string tubing with a production tubing and slotted liner; (f) directing said production tubing and slotted liner through said weighted solution and said plug; and (g) removing said plug, other solidified blocking agent, and gravel packing the in-casing well area in a manner sufficient to exclude particulate matter from said well when producing hydrocarbonaceous fluids therefrom.
Claim 19
Dependent Claim
18 words
The method as recited in claim 16 where in step(c) said in-line opening comprises at least one notch.
Claim 20
Dependent Claim
17 words
The method as recited in claim 16 in step(c) said in-line opening comprises at least two perforations.
Claim 21
Dependent Claim
27 words
The method as recited in claim 16 where in step(c) said opening comprises perforations having at least four perforations per foot which perforations are zero degree phased.
Claim 22
Dependent Claim
27 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidiiable gel mixture which solidifies after about 2 to about 4 hours.
Claim 23
Dependent Claim
35 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidifiable gel mixture which forms a solid sufficient to withstand pressures of from about 500 psig to about 20,000 psig.
Claim 24
Dependent Claim
31 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidifiable gel mixture which forms a solid able to withstand temperatures greater than about 450° F.
Claim 25
Dependent Claim
48 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidifiable gel mixture which becomes solid and is made thermally stable for temperatures of from about 350° F. to about 450° F. for from about 0.5 of a day to about 4 days.
Claim 26
Dependent Claim
57 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidifiable gel mixture into which a gel breaker is added in amounts sufficient to breakdown the subsequently formed solid gel at temperatures of less than from about 60° F. to about 250° F. within from about 2 hours to about 24 hours.
Claim 27
Dependent Claim
59 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidifiable gel mixture into which an oxygen scavenger is placed in a concentration of about 0.10 to about 0.75 weight percent of said mixture, and said oxygen scavenger is a material selected from the group consisting of sodium thiosulfate and a short chain alcohol.
Claim 28
Dependent Claim
52 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidifiable gel mixture which contains a gel breaker capable of breaking down a subsequently formed solid gel at temperatures less than from about 60° F. to about 250° F. within from about 2 to about 24 hours.
Claim 29
Dependent Claim
51 words
The method as recited in claim 16 where in step(d) said blocking agent comprises a solidifiable gel mixture which contains a gel breaker capable of breaking down said subsequently formed solid gel where said gel breaker is a material selected from the group consisting of an enzyme and an oxidizing agent.
Claim 30
Dependent Claim
40 words
The method as recited in claim 16 where in step(g) the plug and other solidified blocking agent are removed from the wellbore and treated pay zone by hydrochloric acid in a strength of about 7.5 to about 15.0 volume percent.
Claim 31
Dependent Claim
44 words
The method as recited in claim 16 where after step(c) the pay zone is treated via said in-line opening with a filtering means to pack the area in the formation behind said in-line opening which means comprises a squeeze pack or small fracture treatment.
Claim 32
Dependent Claim
44 words
The method as recited in claim 16 where in step(e) said weighted solution is a member selected from the group consisting of sodium chloride, calcium chloride, potassium chloride, and natural brine in a strength of about 10 to about 28 weight percent in water.
References Cited (Backward Citations)
US3695355A
Cited
US3800847A
Cited
US3983941A
Cited
US4016931A
Cited
US4194577A
Cited
US4265311A
Cited
US4333461A
Cited
US4378049A
Cited
US4428427A
Cited
US4553595A
Cited
US4549608A
Cited
US4552215A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-11-02 | 1991-05-04 | 1991-11-03 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-11-02 | 1995-05-04 | 1995-11-03 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-11-02 | 1999-05-04 | 1999-11-03 | $7700.00 | Window Closed / Lapsed |