← Back to Patent Explorer
US3983941A Expired / Lapsed US ⏱️ 0.0 years remaining

Well completion technique for sand control

Assignee: Mobil Oil AS
•
Filing: 1975-11-10
•
Granted: 1976-10-05
•
Expires: 1995-11-10
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This specification discloses a method of completing a cased well that penetrates a subterranean formation to control the production of sand from the formation. The well is provided with perforation tunnels that extend through the casing and communicate with the formation. Removable plugs are formed in the perforation tunnels and thereafter a gravel pack is formed and consolidated in the well within the casing adjacent the perforation tunnels. Thereafter the removable plugs are removed from the perforation tunnels to provide unobstructed tunnels for the flow of fluids from the formation into the well. The formation adjacent the perforation tunnels may also be consolidated to mitigate the movement of sand from the formation into the perforation tunnels.

Inventors

  • 👤 John L. Fitch

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 09:22
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/13; E21B33/14; E21B43/00; E21B43/02; E21B43/04

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 76 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and perforation tunnels that extend through said casing and communicate with said formation, comprising: a. forming removable plugs in said perforation tunnels; b. thereafter forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. thereafter chemically or thermally removing said removable plugs to provide unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 2
Independent Claim 76 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and perforation tunnels that extend through said casing and communicate with said formation, comprising: a. forming removable plugs in said perforation tunnels; b. thereafter forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. thereafter chemically or thermally removing said removable plugs to provide unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 3
Dependent Claim 14 words
the method of claim 1 further comprising consolidating said formation adjacent said perforation tunnels.
Claim 4
Independent Claim 91 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and having perforation tunnels that extend through said casing and communicate with said formation, comprising: a. injecting removable granular materials down said well and into said perforation tunnels to form removable plugs therein; b. forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. injecting a fluid down said well to chemically or thermally remove said plugs thereby providing unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 5
Independent Claim 91 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and having perforation tunnels that extend through said casing and communicate with said formation, comprising: a. injecting removable granular materials down said well and into said perforation tunnels to form removable plugs therein; b. forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. injecting a fluid down said well to chemically or thermally remove said plugs thereby providing unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 6
Dependent Claim 50 words
The method of claim 3 wherein said removable granular materials are of a size sufficiently small to pass through said perforation tunnels and sufficiently large to bridge the pores of said formation and wherein said granular materials are injected down said well in sufficient quantity to fill said perforation tunnels.
Claim 7
Dependent Claim 25 words
The method of claim 4 wherein said granular materials are chemically removable and wherein said fluid that is injected down said well is a solvent.
Claim 8
Dependent Claim 25 words
The method of claim 5 wherein said chemically removable granular materials are comprised of calcium carbonate and wherein said chemical is comprised of an acid.
Claim 9
Dependent Claim 38 words
The method of claim 4 wherein said granular materials are thermally removable and wherein said fluid that is injected down said well and into contact with said removable plugs is sufficiently hot to melt and remove said plugs.
Claim 10
Independent Claim 138 words
A method of completing a well that penetrates a subterranean unconsolidated formation to control the production of sand therefrom, said well having casing therein and perforation tunnels that extend through said casing and communicte with said formation, comprising: a. injecting a sand consolidation chemical via said well and said perforation tunnels into said formation to consolidate said formation adjacent said perforation tunnels; b. adding to a tail portion of said sand consolidation chemical granular material for forming removable plugs whereby said material is deposited in said perforation tunnels and removable plugs are formed therein; c. forming a consolidated gravel pack inside said casing adjacent said perforation tunnels; and d. injecting a fluid down said well to chemically or thermally remove said removable plugs from said perforation tunnels thereby providing unobstructed perforation tunnels communicating with said consolidated gravel pack.
Claim 11
Independent Claim 138 words
A method of completing a well that penetrates a subterranean unconsolidated formation to control the production of sand therefrom, said well having casing therein and perforation tunnels that extend through said casing and communicte with said formation, comprising: a. injecting a sand consolidation chemical via said well and said perforation tunnels into said formation to consolidate said formation adjacent said perforation tunnels; b. adding to a tail portion of said sand consolidation chemical granular material for forming removable plugs whereby said material is deposited in said perforation tunnels and removable plugs are formed therein; c. forming a consolidated gravel pack inside said casing adjacent said perforation tunnels; and d. injecting a fluid down said well to chemically or thermally remove said removable plugs from said perforation tunnels thereby providing unobstructed perforation tunnels communicating with said consolidated gravel pack.

References Cited (Backward Citations)

US3044547A Cited
US3097694A Cited
US3237693A Cited
US3233673A Cited
US3333635A Cited
US3336980A Cited
US3672449A Cited
US3709298A Cited
US3826310A Cited
US3814187A Cited
US3800847A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-10-05 1980-04-05 1980-10-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-10-05 1984-04-05 1984-10-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-10-05 1988-04-05 1988-10-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag