Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
76 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and perforation tunnels that extend through said casing and communicate with said formation, comprising: a. forming removable plugs in said perforation tunnels; b. thereafter forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. thereafter chemically or thermally removing said removable plugs to provide unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 2
Independent Claim
76 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and perforation tunnels that extend through said casing and communicate with said formation, comprising: a. forming removable plugs in said perforation tunnels; b. thereafter forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. thereafter chemically or thermally removing said removable plugs to provide unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 3
Dependent Claim
14 words
the method of claim 1 further comprising consolidating said formation adjacent said perforation tunnels.
Claim 4
Independent Claim
91 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and having perforation tunnels that extend through said casing and communicate with said formation, comprising: a. injecting removable granular materials down said well and into said perforation tunnels to form removable plugs therein; b. forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. injecting a fluid down said well to chemically or thermally remove said plugs thereby providing unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 5
Independent Claim
91 words
A method of completing a well that penetrates a subterranean formation, said well having casing therein and having perforation tunnels that extend through said casing and communicate with said formation, comprising: a. injecting removable granular materials down said well and into said perforation tunnels to form removable plugs therein; b. forming an inside-the-casing consolidated gravel pack adjacent said perforation tunnels; and c. injecting a fluid down said well to chemically or thermally remove said plugs thereby providing unobstructed perforation tunnels communicating with said inside -- the -- casing consolidated gravel pack.
Claim 6
Dependent Claim
50 words
The method of claim 3 wherein said removable granular materials are of a size sufficiently small to pass through said perforation tunnels and sufficiently large to bridge the pores of said formation and wherein said granular materials are injected down said well in sufficient quantity to fill said perforation tunnels.
Claim 7
Dependent Claim
25 words
The method of claim 4 wherein said granular materials are chemically removable and wherein said fluid that is injected down said well is a solvent.
Claim 8
Dependent Claim
25 words
The method of claim 5 wherein said chemically removable granular materials are comprised of calcium carbonate and wherein said chemical is comprised of an acid.
Claim 9
Dependent Claim
38 words
The method of claim 4 wherein said granular materials are thermally removable and wherein said fluid that is injected down said well and into contact with said removable plugs is sufficiently hot to melt and remove said plugs.
Claim 10
Independent Claim
138 words
A method of completing a well that penetrates a subterranean unconsolidated formation to control the production of sand therefrom, said well having casing therein and perforation tunnels that extend through said casing and communicte with said formation, comprising: a. injecting a sand consolidation chemical via said well and said perforation tunnels into said formation to consolidate said formation adjacent said perforation tunnels; b. adding to a tail portion of said sand consolidation chemical granular material for forming removable plugs whereby said material is deposited in said perforation tunnels and removable plugs are formed therein; c. forming a consolidated gravel pack inside said casing adjacent said perforation tunnels; and d. injecting a fluid down said well to chemically or thermally remove said removable plugs from said perforation tunnels thereby providing unobstructed perforation tunnels communicating with said consolidated gravel pack.
Claim 11
Independent Claim
138 words
A method of completing a well that penetrates a subterranean unconsolidated formation to control the production of sand therefrom, said well having casing therein and perforation tunnels that extend through said casing and communicte with said formation, comprising: a. injecting a sand consolidation chemical via said well and said perforation tunnels into said formation to consolidate said formation adjacent said perforation tunnels; b. adding to a tail portion of said sand consolidation chemical granular material for forming removable plugs whereby said material is deposited in said perforation tunnels and removable plugs are formed therein; c. forming a consolidated gravel pack inside said casing adjacent said perforation tunnels; and d. injecting a fluid down said well to chemically or thermally remove said removable plugs from said perforation tunnels thereby providing unobstructed perforation tunnels communicating with said consolidated gravel pack.