Patent US4475930A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4475930A Expired / Lapsed US ⏱️ 0.0 years remaining

Pressure swing adsorption system using product gas as replacement for purge gas

Assignee: Linde GmbH
•
Filing: 1983-02-16
•
Granted: 1984-10-09
•
Expires: 2003-02-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a pressure swing adsorption plant for the purification and separation of gases, with several adsorbers, conducting respectively within one cycle the steps of adsorption, expansion or pressure equalization, purging, and pressure buildup, using as the purge gas residual gas released during the expansion of adsorbers, wherein pressure buildup is conducted at least in part with product gas, and when there is a malfunction in an adsorber yielding purge gas, the product gas is employed not only for the pressure buildup but also for purging one or more adsorbers. The amount of purge gas is controlled so that the adsorber or adsorbers, which are in the pressure buildup phase reach the desired adsorption pressure within a previously determined period of time.

Inventors

  • 👤 Stefan Asztalos

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 10:00
CPC Classifications
B; B01; B01D; B01D53/00; B01D53/02; B01D53/04; B01D53/047; B01D2259/00; B01D2259/40; B01D2259/40007; B01D2259/40011; B01D2259/40043; B01D2259/4005; B01D2259/40052; B01D2259/40058; B01D2259/40062; B01D2259/403

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 147 words
In a pressure swing adsorption process utilizing a plurality of interconnected adsorbers, comprising the steps within one cycle of adsorption, expansion or pressure equalization, purging, and pressure buildup, wherein purified product gas is withdrawn during the adsorption step; purge gas for the purging step comprises residual gas released during the expansion of at least one adsorber; the pressure buildup step is conducted at least in part by blowing in product gas, and wherein there is a malfunction in the at least one adsorber yielding the purge gas so that insufficient purge gas is available, the improvement comprising employing the product gas for the pressure buildup and for purging one or several other adsorbers; and adjusting the amount of product gas used as purge gas so that the adsorbers, which are in the pressure buildup step, reach the desired adsorption pressure within a previously determined period of time.
Claim 2
Dependent Claim 147 words
In a pressure swing adsorption process utilizing a plurality of interconnected adsorbers, comprising the steps within one cycle of adsorption, expansion or pressure equalization, purging, and pressure buildup, wherein purified product gas is withdrawn during the adsorption step; purge gas for the purging step comprises residual gas released during the expansion of at least one adsorber; the pressure buildup step is conducted at least in part by blowing in product gas, and wherein there is a malfunction in the at least one adsorber yielding the purge gas so that insufficient purge gas is available, the improvement comprising employing the product gas for the pressure buildup and for purging one or several other adsorbers; and adjusting the amount of product gas used as purge gas so that the adsorbers, which are in the pressure buildup step, reach the desired adsorption pressure within a previously determined period of time.
Claim 3
Dependent Claim 23 words
A process according to claim 1, wherein the amount of purge gas is throttled if the desired adsorption pressure has not been reached.
Claim 4
Dependent Claim 22 words
A process according to claim 1, wherein the amount of purge gas is increased if the desired adsorption pressure has been reached.
Claim 5
Dependent Claim 31 words
A process according to claim 1, wherein the malfunctioning adsorber is replaced by switching the process over to a process using one less adsorber while providing a continuous mode of operation.
Claim 6
Dependent Claim 22 words
A process according to claim 1, wherein the product gas used for both pressure buildup and purging is from the same adsorber.
Claim 7
Dependent Claim 26 words
A process according to claim 1, wherein the product gas used for both pressure buildup and purging is the highest pressure gas withdrawn from an adsorber.

References Cited (Backward Citations)

US3564816A Cited
US3636679A Cited
US3986849A Cited
US4070164A Cited
DE2624346A1 Cited
US4077780A Cited
US4140495A Cited
US4234322A Cited
US4299595A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-10-09 1988-04-09 1988-10-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-10-09 1992-04-09 1992-10-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-10-09 1996-04-09 1996-10-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag