Abstract

Abstract A method of operating a multi-adsorber pressure-swing adsorber installation in which each adsorber is, in a given cycle, operated for a plurality of time slots in an adsorption stage, subjected to a plurality of pressure-relief phases over corresponding time slots by pressure equalization with other adsorbers, the pressure-relief phases are followed by purging phases and ultimately pressure buildup phases likewise by pressure equalization with other adsorbers. According to the invention, upon the detection of a pressure condition, either by direct measurement of pressure or by measurement of another parameter, deviating from a setpoint value indicating a defect in one adsorber or its valve or duct systems, this adsorber is cut out of the system and the remaining adsorbers are continued to be cycled or are temporarily retained in a previous phase with readjustment of the sequencing so that the feed and output remain continuous, the remaining adsorber sequences corresponding to the number of adsorbers which remain operative.

Inventors

  • 👤 Christian Benkmann
  • 👤 Paul Leitgeb
  • 👤 Stefan Asztalos

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 10:21
CPC Classifications
B; B01; B01D; B01D53/00; B01D53/02; B01D53/04; B01D53/047; B01D2259/00; B01D2259/40; B01D2259/40007; B01D2259/40009; B01D2259/40011; B01D2259/40028; B01D2259/4003; B01D2259/40032; B01D2259/40035; B01D2259/40037; B01D2259/40041; B01D2259/40043; B01D2259/40045; B01D2259/40058; B01D2259/40067; B01D2259/40075; B01D2259/404; B01D2259/406; B01D2259/4066

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 251 words
A method of operating a multi-adsorber pressure swing adsorber installation which comprises a multiplicity of adsorber elements and respective duct elements and valve elements interconnecting said adsorber elements and sequenced to operate said adsorbers sequentially and to cycle each adsorber through an adsorption stage at an elevated pressure for a plurality of time slots into which the cycle is divided, through at least one pressure-relief phase over at least one corresponding time slot by pressure equalization with other adsorbers, through at least one purging phase by connection to another adsorber and through at least one pressure buildup phase with such pressure equalization, said method comprising the steps of: monitoring a physical parameter of the operation of at least some of said elements of each adsorber over the cyclical operation of said adsorbers and comparing the monitored physical parameter with a setpoint value thereof corresponding to the respective point in the sequence to detect a defective one of said elements sustaining an apparatus failure; isolating the adsorber associated with the defective element from the remainder of said installation and removing the isolated adsorber from service; and modifying the number of operating phases and time slots per cycle of the adsorbers remaining effective in said installation corresponding to the number os such adsorber remaining effective by continuing the cycling of some of the adsorbers while temporarily interrupting the cycling of other adsorbers, to establish a new sequence corresponding to the number of remaining adsorbers without interrupting the input and output of the installation.
Claim 2
Independent Claim 251 words
A method of operating a multi-adsorber pressure swing adsorber installation which comprises a multiplicity of adsorber elements and respective duct elements and valve elements interconnecting said adsorber elements and sequenced to operate said adsorbers sequentially and to cycle each adsorber through an adsorption stage at an elevated pressure for a plurality of time slots into which the cycle is divided, through at least one pressure-relief phase over at least one corresponding time slot by pressure equalization with other adsorbers, through at least one purging phase by connection to another adsorber and through at least one pressure buildup phase with such pressure equalization, said method comprising the steps of: monitoring a physical parameter of the operation of at least some of said elements of each adsorber over the cyclical operation of said adsorbers and comparing the monitored physical parameter with a setpoint value thereof corresponding to the respective point in the sequence to detect a defective one of said elements sustaining an apparatus failure; isolating the adsorber associated with the defective element from the remainder of said installation and removing the isolated adsorber from service; and modifying the number of operating phases and time slots per cycle of the adsorbers remaining effective in said installation corresponding to the number os such adsorber remaining effective by continuing the cycling of some of the adsorbers while temporarily interrupting the cycling of other adsorbers, to establish a new sequence corresponding to the number of remaining adsorbers without interrupting the input and output of the installation.
Claim 3
Dependent Claim 25 words
The method defined in claim 1 wherein said physical parameter which is monitored is the pressure of at least one element associated with each adsorber.
Claim 4
Dependent Claim 29 words
The method defined in claim 1 wherein the physical parameter which is monitored for at least some of said elements is the time to attainment of a predetermined pressure.
Claim 5
Dependent Claim 25 words
The method defined in claim 1 wherein the physical parameter which is monitored is the setting of one of said valve elements for each adsorber.
Claim 6
Dependent Claim 25 words
The method defined in claim 4 wherein the physical parameter which is measured is the displacement of a valve member as a function of time.
Claim 7
Dependent Claim 48 words
The method defined in claim 1 wherein the pressure in each adsorber is monitored for each phase of the cycle thereof and compared with a respective setpoint value at each phase, a deviation between the monitored pressure and the setpoint value being registered only upon its initial appearance.
Claim 8
Dependent Claim 55 words
The method defined in claim 6 wherein a positive deviation and a negative deviation of a measured pressure value from respective setpoint values are ascertained during a cycle of a given adsorber to detect respective sets of suspect valves for each deviation, the sets being correlated to indicate the faulty valve resulting in such deviations.
Claim 9
Dependent Claim 90 words
The method defined in claim 1 wherein each of the adsorbers in the installation is assigned a number from 1 to n in the sequence in which the respective adsorbers are cycled through their respective time slots based upon successive operation in the respective adsorption stages and, upon the isolation of an adsorber i in its time slot j of even number, the adsorbers numbered up to ##EQU3## are cycled to further time slots in their original sequence prior to the establishment of a new sequence for said remaining adsorbers.
Claim 10
Dependent Claim 88 words
The method defined in claim 1 wherein each of the adsorbers in the installation is assigned a number from 1 to n in the sequence in which the respective adsorbers are cycled through their respective time slots based upon successive operation in the respective adsorption stages and, upon the isolation of one of the adsorbers numbered i in a time slot j of odd number, the adsorbers of numbers up to ##EQU4## are operated to further time slots in their original sequences prior to establishing the new sequences.
Claim 11
Dependent Claim 46 words
The method defined in claim 8 or claim 9 wherein all of the remaining adsorbers, apart from those continued in their original sequence for two time slots, are held in their original time slot and phase upon isolation of the adsorber associated with the defective elements.
Claim 12
Dependent Claim 33 words
The method defined in claim 10 wherein at least some of the adsorbers retained in their respective phases upon isolation of the adsorber associated with the defective elements are vented through additional valves.
Claim 13
Dependent Claim 12 words
The method defined in claim 10 wherein the isolated adsorber is vented.
Claim 14
Dependent Claim 54 words
The method defined in claim 8 or claim 9 wherein the installation is used for the cleaning of a gas and wherein the volume rate of flow of the gas to be cleaned at the installation during the two sequences remains constant during the two time slots through which the original sequence is maintained.
Claim 15
Dependent Claim 54 words
The method defined in claim 13 wherein the volume of the gas to be cleaned per adsorber after the two time slots at the original sequence is increased by a factor ##EQU5## wherein n A equals the number of adsorbers simultaneously operating in the adsorption stage and x is the number of isolated adsorbers.

References Cited (Backward Citations)

US3378992A Cited
US3775946A Cited
US3986849A Cited
DE2624346A1 Cited
SU601035A1 Cited
US4101298A Cited
US4140495A Cited
US4197095A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-11-09 1985-05-11 1985-11-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-11-09 1989-05-11 1989-11-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-11-09 1993-05-11 1993-11-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag