← Back to Patent Explorer
US4234322A Expired / Lapsed US ⏱️ 0.0 years remaining

Pressure swing adsorption process

Assignee: Linde GmbH
•
Filing: 1979-05-23
•
Granted: 1980-11-18
•
Expires: 1999-05-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An adiabatic pressure swing adsorption process for the separation of gas mixtures by adsorbing at least one gas component in each of at least eight phase staggered operated adsorbent beds, which can be continued to be operated without any stoppage of installation even if one adsorbent bed is removed from operation due to a defective valve.

Inventors

  • 👤 Herman De Meyer
  • 👤 Roland Doclo
  • 👤 Jan Seynaeve

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 10:21
CPC Classifications
B; B01; B01D; B01D53/00; B01D53/02; B01D53/04; B01D53/047; C; C01; C01B; C01B3/00; C01B3/50; C01B3/56; B01D2256/00; B01D2256/16; B01D2257/00; B01D2257/10; B01D2257/102; B01D2257/50; B01D2257/504; B01D2259/00; B01D2259/40; B01D2259/40007; B01D2259/40011; B01D2259/40028; B01D2259/4003; B01D2259/40035; B01D2259/40041; B01D2259/40043; B01D2259/4005; B01D2259/40052; B01D2259/40058; B01D2259/40075; B01D2259/40077; B01D2259/40081; B01D2259/406; B01D2259/4065; C01B2203/00; C01B2203/04; C01B2203/042; C01B2203/043; C01B2203/0465; C01B2203/0475; Y; Y02; Y02C; Y02C20/00; Y02C20/40; Y02P; Y02P20/00; Y02P20/151

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 271 words
In an adiabatic pressure swing adsorption process for separation of gas mixtures by adsorbing at least one gas component in each of at least eight phase staggered operated adsorbent beds; wherein each of the adsorbent beds is cyclically operated in subsequent operation steps including adsorption, at least two depressurization steps, countercurrent purging, and at least two; repressurization steps; depressurization and repressurization being established by pressure equalization with another adsorbent bed being operated in the operation step repressurization depressurization respectively of adjacent pressure range by means of a number of connecting tubes and valves opening from said adsorbent beds to said connecting tubes; the valves being switched according to a predetermined first valve operation pattern; switching of valves being initiated when a first characteristic physical quantity has reached a predetermined value; the improvement comprising periodically compairing measured actual values with predetermined corresponding nominal values of a second physical quantity characteristic for each operation step; in the case of deviations of the actual values from the nominal values, identifying any valve being potentially defective and therefore potentially responsible for said deviations in any of subsequent operation steps after the first occurence of deviation; identifying the actual defective valve as being the sole valve being identified as potentially defective in any of a sufficient number of operation steps to exclude other valves being also identified as potentially defective in said operation step of first occurance of a deviation; excluding the adsorption bed to which the defective valve belongs from operation by continuing operation of the remaining adsorption beds according to a second valve operation pattern predefined for a such reduced number of adsorption beds.
Claim 2
Dependent Claim 271 words
In an adiabatic pressure swing adsorption process for separation of gas mixtures by adsorbing at least one gas component in each of at least eight phase staggered operated adsorbent beds; wherein each of the adsorbent beds is cyclically operated in subsequent operation steps including adsorption, at least two depressurization steps, countercurrent purging, and at least two; repressurization steps; depressurization and repressurization being established by pressure equalization with another adsorbent bed being operated in the operation step repressurization depressurization respectively of adjacent pressure range by means of a number of connecting tubes and valves opening from said adsorbent beds to said connecting tubes; the valves being switched according to a predetermined first valve operation pattern; switching of valves being initiated when a first characteristic physical quantity has reached a predetermined value; the improvement comprising periodically compairing measured actual values with predetermined corresponding nominal values of a second physical quantity characteristic for each operation step; in the case of deviations of the actual values from the nominal values, identifying any valve being potentially defective and therefore potentially responsible for said deviations in any of subsequent operation steps after the first occurence of deviation; identifying the actual defective valve as being the sole valve being identified as potentially defective in any of a sufficient number of operation steps to exclude other valves being also identified as potentially defective in said operation step of first occurance of a deviation; excluding the adsorption bed to which the defective valve belongs from operation by continuing operation of the remaining adsorption beds according to a second valve operation pattern predefined for a such reduced number of adsorption beds.
Claim 3
Dependent Claim 52 words
The process according to claim 1 wherein the first physical quantity is a predetermined time interval and the second physical quantity is pressure, the actual values thereof are measured in at least one of the adsorbent beds and the connecting tubes, the nominal values thereof being predetermined according to the valve characteristics.
Claim 4
Dependent Claim 64 words
The process according to claim 1 wherein the first physical quantity is pressure, switching being initiated when the predetermined value is reached in any of the adsorbent beds and connecting tubes, and the second physical quantity is time, the actual values thereof being the time interval until a particular switch-initiating pressure is reached, the nominal values thereof being predetermined according to the valve characteristics.
Claim 5
Dependent Claim 19 words
The process according to claim 3 wherein the first physical quantity is the pressure in the repressurized adsorbent bed.
Claim 6
Dependent Claim 61 words
The process according to claim 1 wherein the first physical quantity is a predetermined time interval, during which a predetermined pressure in at least one of the adsorbent beds and connecting tubes is realized by valve operation control, and the second physical quantity is the valve setting, the nominal values of the valve setting being predetermined according to the valve characteristics.
Claim 7
Dependent Claim 63 words
The process according to one of claims 1 to 5 wherein if during operation according to the second valve operation pattern a defective valve is identified the adsorbent bed to which the defective valve belongs is excluded from operation by continuing operation of the remaining adsorbent beds according to a third valve operation pattern predefined for a such reduced number of adsorbent beds.

References Cited (Backward Citations)

US3564816A Cited
US3703068A Cited
US3986849A Cited
DE2624346A1 Cited
US4140495A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1983-11-18 1984-05-19 1984-11-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1987-11-18 1988-05-19 1988-11-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1991-11-18 1992-05-19 1992-11-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag