Abstract A fracturing and acidization method for increasing the productivity of relatively hard acid-soluble formations about a perforated well, comprising the steps of producing a formation fracture containing a viscous fluid and propping agent; injecting an acid solution having a viscosity value fifty times less than the contained viscous fluid into the fluid filled fracture, thereby forming etched channels in the fracture walls and displacing the propping agent from such channels; and lowering the fluid pressure in the fracture to allow the walls thereof to become displaced towards a closing position until held open by the propping agent. Channels so formed have a greater width than can be formed by conventional techniques and consequently substantially increase the productivity of such formations.
A method for forming channels of high fluid conductivity in relatively hard acid-soluble formation parts around a cased well which has its casing perforated along at least a part of the casing wall which faces such formation, said method comprising the steps of: (a) producing in the formation a fracture containing a viscous fluid with propping agent and maintaining a fluid pressure at which the fracture is kept open; (b) injecting an acid solution through the perforations into the fracture at a pressure at which the fracture remains open, the viscosity ratio between the viscous fluid and the acid solution being chosen such that the viscous fluid is displaced in the fracture in an unstable manner by the acid solution; (c) continuing the injection of the acid solution through the perforations until channels have been etched in areas of the fracture walls that face each other; and (d) lowering the fluid pressure in the fracture, thereby allowing the adjacent fracture walls to be displaced towards each other until a portion of the non-etched parts of the walls are supported by the propping agent.
Claim 2
Independent Claim
183 words
A method for forming channels of high fluid conductivity in relatively hard acid-soluble formation parts around a cased well which has its casing perforated along at least a part of the casing wall which faces such formation, said method comprising the steps of: (a) producing in the formation a fracture containing a viscous fluid with propping agent and maintaining a fluid pressure at which the fracture is kept open; (b) injecting an acid solution through the perforations into the fracture at a pressure at which the fracture remains open, the viscosity ratio between the viscous fluid and the acid solution being chosen such that the viscous fluid is displaced in the fracture in an unstable manner by the acid solution; (c) continuing the injection of the acid solution through the perforations until channels have been etched in areas of the fracture walls that face each other; and (d) lowering the fluid pressure in the fracture, thereby allowing the adjacent fracture walls to be displaced towards each other until a portion of the non-etched parts of the walls are supported by the propping agent.
Claim 3
Dependent Claim
16 words
The method of claim 1, including the step of lowering the viscosity of the viscous fluid.
Claim 4
Dependent Claim
16 words
The method according to claim 2, wherein the fluid pressure and fluid viscosity are lowered simultaneously.
Claim 5
Dependent Claim
24 words
The method according to claim 1 or 2, wherein the viscosity ratio between the carrying fluid and the acid solution is at least 150.
Claim 6
Dependent Claim
15 words
The method according to claim 4, wherein the viscosity ratio is between 200 and 300.
Claim 7
Dependent Claim
13 words
The method according to claim 1, wherein the formation substantially consists of limestone.
Claim 8
Dependent Claim
22 words
The method according to claim 1, wherein the relatively hard formation consists of a material having a Brinell hardness higher than 15.
Claim 9
Dependent Claim
16 words
The method according to claim 1, wherein the well lies in the plane of the fracture.