US3954142A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Zonal fracture treatment of well formations
Assignee: Halliburton Co
•
Filing: 1974-08-21
•
Granted: 1976-05-04
•
Expires: 1994-08-21
Abstract
Abstract Methods are provided for treating an underground well formation whereby the treatment is confined to a desired zone within the formation. The methods comprise introducing one or more preflush fluids into one or more fractures in the formation followed by the introduction of a treating fluid having a density differing sufficiently from the density of the preflush fluids whereby the treating fluid is segregated and caused to flow into a desired zone within the formation.
Inventors
- 👤 Gene C. Broaddus
- 👤 Sherman E. Fredrickson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 15:32
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/60; C09K8/62; C09K8/72; E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/27
Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
108 words
A method for placing an acidic treating fluid into a desired zone of a fracture in an underground well formation comprising: introducing a preflush fluid having a known specific gravity into said fracture, and thereafter introducing an acidic treating fluid having a specific gravity not equal to the specific gravity of said preflush fluid into said fracture, the specific gravity of said acidic treating fluid being at least about 0.1 less than the specific gravity of said preflush fluid; whereby said acidic treating fluid having a lower specific gravity than said preflush fluid is caused to override said preflush fluid into a desired upper zone of said fracture.
Claim 2
Independent Claim
108 words
A method for placing an acidic treating fluid into a desired zone of a fracture in an underground well formation comprising: introducing a preflush fluid having a known specific gravity into said fracture, and thereafter introducing an acidic treating fluid having a specific gravity not equal to the specific gravity of said preflush fluid into said fracture, the specific gravity of said acidic treating fluid being at least about 0.1 less than the specific gravity of said preflush fluid; whereby said acidic treating fluid having a lower specific gravity than said preflush fluid is caused to override said preflush fluid into a desired upper zone of said fracture.
Claim 3
Dependent Claim
32 words
The method of claim 1 wherein said preflush fluid is selected from the group consisting of hydrocarbon liquids, water, aqueous sodium chloride solutions, aqueous calcium chloride solutions, and aqueous potassium chloride solutions.
Claim 4
Dependent Claim
27 words
The method of claim 2 wherein said acidic treating fluid is selected from the group consisting of hydrochloric acid, hydrochloric acid-organic acid mixtures and methanol-hydrochloric acid mixtures.
Claim 5
Dependent Claim
56 words
The method of claim 1 which is further characterized to include the additional step of: continuously introducing successive quantities of said preflush fluid and said acidic treating fluid into said fracture so that the overriding of said acidic treating fluid into said upper zone is maintained while said acidic treating fluid is flowed through said fracture.
Claim 6
Dependent Claim
31 words
The method of claim 4 wherein the apparent viscosities of said preflush fluid and said acidic treating fluid at the temperature existing in said fractures are less than about 100 cps.
Claim 7
Dependent Claim
27 words
The method of claim 4 wherein said acidic treating fluid has a specific gravity in the range of from about 1.02 to about 1.34 at room temperature.
Claim 8
Dependent Claim
22 words
The method of claim 1 which is further characterized to include the initial step of inducing one or more of said fractures.
Claim 9
Independent Claim
172 words
A method for placing a treating fluid into a desired zone of a fracture in an underground well formation comprising: introducing a first preflush fluid having a known specific gravity into said fracture, introducing a second preflush fluid into said fracture, said second preflush fluid having a specific gravity sufficiently lower than the specific gravity of said first preflush fluid so that said second preflush fluid overrides said first preflush fluid, producing an interface between said first preflush fluid and said second preflush fluid, and thereafter introducing a treating fluid into said fracture, said treating fluid having a specific gravity of at least about 0.1 less than the specific gravity of said first preflush fluid and at least about 0.04 more than the specific gravity of said second preflush fluid; whereby said treating fluid is caused to override said first preflush fluid and to underride said second preflush fluid and to flow along said interface between said first preflush fluid and said second preflush fluid into a desired zone of said fracture.
Claim 10
Independent Claim
172 words
A method for placing a treating fluid into a desired zone of a fracture in an underground well formation comprising: introducing a first preflush fluid having a known specific gravity into said fracture, introducing a second preflush fluid into said fracture, said second preflush fluid having a specific gravity sufficiently lower than the specific gravity of said first preflush fluid so that said second preflush fluid overrides said first preflush fluid, producing an interface between said first preflush fluid and said second preflush fluid, and thereafter introducing a treating fluid into said fracture, said treating fluid having a specific gravity of at least about 0.1 less than the specific gravity of said first preflush fluid and at least about 0.04 more than the specific gravity of said second preflush fluid; whereby said treating fluid is caused to override said first preflush fluid and to underride said second preflush fluid and to flow along said interface between said first preflush fluid and said second preflush fluid into a desired zone of said fracture.
Claim 11
Dependent Claim
35 words
The method of claim 8 wherein the specific gravity of said second preflush fluid in said fracture is at least about 0.05 less than the specific gravity of said first preflush fluid in said fracture.
Claim 12
Dependent Claim
56 words
The method of claim 9 which is further characterized to include the step of continuously introducing successive quantities of said first preflush fluid, said second preflush fluid and said treating fluid into said fracture so that the flow of said treating fluid along said interface is maintained while said treating fluid is flowed through said fracture.
Claim 13
Dependent Claim
38 words
The method of claim 10 wherein said first preflush fluid and said second preflush fluid are selected from the group consisting of hydrocarbon liquids, water, aqueous sodium chloride solutions, aqueous calcium chloride solutions, and aqueous potassium chloride solutions.
Claim 14
Dependent Claim
26 words
The method of claim 11 wherein said treating fluid is selected from the group consisting of hydrochloric acid, hydrochloric acid-organic acid mixtures and methanol-hydrochloric acid mixtures.
Claim 15
Dependent Claim
33 words
The method of claim 12 wherein the apparent viscosities of said first and second preflush fluids and said treating fluid at the temperature existing in said fractures are less than about 100 cps.
Claim 16
Dependent Claim
58 words
The method of claim 13 wherein said first and second preflush fluids are aqueous solutions having specific gravities in the range of from about 1 to about 1.4 at room temperature and wherein said treating fluid is an aqueous acid solution having a specific gravity in the range of from about 1.075 to about 1.15 at room temperature.
Claim 17
Dependent Claim
22 words
The method of claim 9 which is further characterized to include the initial step of inducing one or more of said fractures.
References Cited (Backward Citations)
US3003554A
Cited
US3131759A
Cited
US3160207A
Cited
US3294765A
Cited
US3642068A
Cited
US3550686A
Cited
US3568772A
Cited
US3781203A
Cited
US3768564A
Cited
US3819520A
Cited
US3847224A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1979-05-04 | 1979-11-03 | 1980-05-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1983-05-04 | 1983-11-03 | 1984-05-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1987-05-04 | 1987-11-03 | 1988-05-04 | $7700.00 | Window Closed / Lapsed |