← Back to Patent Explorer
US4078609A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of fracturing a subterranean formation

Assignee: Schlumberger Technology Corp
•
Filing: 1977-03-28
•
Granted: 1978-03-14
•
Expires: 1997-03-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A fracturing method wherein (a) a viscous, prop free fluid is injected into a new or preexisting fracture to widen and extend the fracture, (b) a viscous prop carrying fluid is injected in one or more stages, (c) a viscous prop free spacer is injected, (d) a low viscosity inefficient penetrating fluid is injected, all of the foregoing being injected at rates and pressures calculated to prevent said fracture from healing, (e) injection of fluids at rates and pressures calculated to prevent said fracture from healing is ceased (including the embodiments of injecting a low viscosity penetrating fluid at a matrix rate, ceasing injection entirely, flowing back the well, or a combination thereof), and thereafter at least steps (a) and (b) are repeated.

Inventors

  • 👤 Joseph P. Pavlich

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 23:17
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B33/00; E21B33/10; E21B33/13; E21B33/138; E21B43/16; E21B43/17; E21B43/261

Claims Analysis

Total Claims: 21
Claim 1
Independent Claim 103 words
In a method of fracturing a formation wherein at least two stages of a viscous non-Newtonian fracturing fluid carrying a solid are injected via a borehole into a fracture in said formation at a fracturing rate and pressure, and fluid injection rates and pressures are temporarily reduced at least once between the first and the last of said stages to close the fracture at least partially, the improvement which comprises: immediately preceding the temporary rate and pressure reducing step, injecting in sequence both (a) a non-Newtonian viscous fracturing fluid substantially free of solids and (b) an inefficient penetrating fluid substantially free of solids.
Claim 2
Dependent Claim 103 words
In a method of fracturing a formation wherein at least two stages of a viscous non-Newtonian fracturing fluid carrying a solid are injected via a borehole into a fracture in said formation at a fracturing rate and pressure, and fluid injection rates and pressures are temporarily reduced at least once between the first and the last of said stages to close the fracture at least partially, the improvement which comprises: immediately preceding the temporary rate and pressure reducing step, injecting in sequence both (a) a non-Newtonian viscous fracturing fluid substantially free of solids and (b) an inefficient penetrating fluid substantially free of solids.
Claim 3
Dependent Claim 26 words
The method of claim 1 wherein said temporary rate and pressure reducing step comprises continuing to inject said inefficient penetrating fluid, but at a matrix rate.
Claim 4
Dependent Claim 30 words
The method of claim 2 wherein the matrix rate is a rate resulting in a formation pressure of less than about 0.7 pounds per square inch per foot of depth.
Claim 5
Dependent Claim 54 words
The method of claim 2 wherein the viscosity of the penetrating fluid is less than about 1.5 centipoise and the viscosity of the non-Newtonian fluid is from about 10 to about 400 centipoise, the viscosity of the non-Newtonian fluid being further characterized as exceeding that of the penetrating fluid by at least 10 times.
Claim 6
Dependent Claim 82 words
The method of claim 1 wherein said borehole is adjacent a second borehole, said second borehole is on fire, and said steps recited in claim 1 are carried out so that fluid communication between said boreholes through said formation is established or improved, comprising the additional step subsequent to said steps recited in claim 1 of injecting into said second borehole via said formation and said first borehole, an effective quantity of a fire extinguishing composition so that said fire is extinguished.
Claim 7
Dependent Claim 201 words
In a method for increasing the permeability of a subterranean formation penetrated by a borehole which includes the steps of (i) injecting a high viscosity, non-Newtonian fluid substantially free of solids into a fracture in the formation which is in communication with the borehole, at a fracturing rate and pressure sufficient to widen the fracture so that a propping agent can be injected into the fracture, (ii) injecting a high viscosity non-Newtonian fluid carrying a propping agent while continuing to maintain a wellhead injection rate and pressure calculated to prevent said fracture from healing, (iii) injecting a high viscosity non-Newtonian spacer fluid substantially free of solids while continuing to maintain a wellhead injection rate and pressure calculated to prevent said fracture from healing, (iv) temporarily ceasing to inject fluids at rates and pressures calculated to prevent said fracture from healing, (v) repeating steps (i) and (ii) at least once, and (vi) terminating the treatment by permanently ceasing to inject fluids, the improvement which comprises: (a) immediately preceding step (iv), injecting a stage of a substantially solids-free inefficient penetrating fluid less viscous than said non-Newtonian fluids while continuing to maintain a wellhead injection rate calculated to substantially prevent said fracture from healing.
Claim 8
Dependent Claim 201 words
In a method for increasing the permeability of a subterranean formation penetrated by a borehole which includes the steps of (i) injecting a high viscosity, non-Newtonian fluid substantially free of solids into a fracture in the formation which is in communication with the borehole, at a fracturing rate and pressure sufficient to widen the fracture so that a propping agent can be injected into the fracture, (ii) injecting a high viscosity non-Newtonian fluid carrying a propping agent while continuing to maintain a wellhead injection rate and pressure calculated to prevent said fracture from healing, (iii) injecting a high viscosity non-Newtonian spacer fluid substantially free of solids while continuing to maintain a wellhead injection rate and pressure calculated to prevent said fracture from healing, (iv) temporarily ceasing to inject fluids at rates and pressures calculated to prevent said fracture from healing, (v) repeating steps (i) and (ii) at least once, and (vi) terminating the treatment by permanently ceasing to inject fluids, the improvement which comprises: (a) immediately preceding step (iv), injecting a stage of a substantially solids-free inefficient penetrating fluid less viscous than said non-Newtonian fluids while continuing to maintain a wellhead injection rate calculated to substantially prevent said fracture from healing.
Claim 9
Dependent Claim 23 words
The method of claim 6 wherein step (iv) comprises injecting an inefficient fluid less viscous than said non-Newtonian fluid at a matrix rate.
Claim 10
Dependent Claim 24 words
The method of claim 7 wherein step (iv) consists of injecting an inefficient fluid less viscous than said non-Newtonian fluid at a matrix rate.
Claim 11
Dependent Claim 17 words
The method of claim 6 wherein step (v) includes repeating steps (i) through (iii) at least once.
Claim 12
Dependent Claim 24 words
The method of claim 9 wherein step (iv) consists of injecting an inefficient fluid less viscous than said non-Newtonian fluid at a matrix rate.
Claim 13
Dependent Claim 33 words
The method of claim 6 wherein step (v) includes repeating steps (i) through (iv) at least once, the penetrating fluid injection step being carried out immediately prior to each repetition of step (iv).
Claim 14
Dependent Claim 24 words
The method of claim 11 wherein step (iv) consists of injecting an inefficient fluid less viscous than said non-Newtonian fluid at a matrix rate.
Claim 15
Dependent Claim 35 words
The method of claim 6 including an initial step of injecting a fracturing fluid into said formation at a rate and pressure sufficient to initiate a fracture in said formation in communication with said borehole.
Claim 16
Dependent Claim 44 words
The method of claim 6 wherein said non-Newtonian fluid is selected from the group consisting of a gelled aqueous fluid, or an oil-in-water emulsion, and wherein said fluid of step (a) is water, brine, an aqueous acid solution or a liquified inert inorganic gas.
Claim 17
Dependent Claim 33 words
The method of claim 6 wherein said non-Newtonian fluid is selected from the group consisting of a gelled hydrocarbon or a water-in-oil emulsion and wherein said fluid of step (a) is a hydrocarbon.
Claim 18
Independent Claim 194 words
A method of treating a subterranean formation penetrated by a borehole to increase the permeability thereof, said formation having at least one fracture therein in communication with said borehole, comprising (a) injecting a high viscosity non-Newtonian pad fluid substantially free of solids into said fracture at a rate and pressure sufficient to extend said fracture and widen the fracture sufficiently so that a propping agent can be injected into the fracture; (b) placing propping agent in said fracture by (1) injecting a high viscosity non-Newtonian carrier fluid having a propping agent suspended therein while continuing to maintain a wellhead injection rate and pressure calculated to prevent said fracture from healing and (2) injecting a high viscosity non-Newtonian spacer fluid substantially free of solids into said fracture at a rate and pressure calculated to prevent said fracture from healing; (c) repeating step (b) at least once; (d) injecting an inefficient penetrating fluid less viscous than said non-Newtonian fluid; (e) temporarily ceasing to inject fluids at rates and pressures calculated to prevent said fracture from healing; (f) repeating steps (a) through (d) at least once; and (g) terminating the treatment by permanently ceasing to inject fluids.
Claim 19
Independent Claim 194 words
A method of treating a subterranean formation penetrated by a borehole to increase the permeability thereof, said formation having at least one fracture therein in communication with said borehole, comprising (a) injecting a high viscosity non-Newtonian pad fluid substantially free of solids into said fracture at a rate and pressure sufficient to extend said fracture and widen the fracture sufficiently so that a propping agent can be injected into the fracture; (b) placing propping agent in said fracture by (1) injecting a high viscosity non-Newtonian carrier fluid having a propping agent suspended therein while continuing to maintain a wellhead injection rate and pressure calculated to prevent said fracture from healing and (2) injecting a high viscosity non-Newtonian spacer fluid substantially free of solids into said fracture at a rate and pressure calculated to prevent said fracture from healing; (c) repeating step (b) at least once; (d) injecting an inefficient penetrating fluid less viscous than said non-Newtonian fluid; (e) temporarily ceasing to inject fluids at rates and pressures calculated to prevent said fracture from healing; (f) repeating steps (a) through (d) at least once; and (g) terminating the treatment by permanently ceasing to inject fluids.
Claim 20
Dependent Claim 24 words
The method of claim 16 wherein step (e) comprises injecting an inefficient penetrating fluid less viscous than said non-Newtonian fluids at a matrix rate.
Claim 21
Dependent Claim 25 words
The method of claim 17 wherein step (e) consists of injecting an inefficient penetrating fluid less viscous than said non-Newtonian fluids at a matrix rate.

References Cited (Backward Citations)

US3058909A Cited
US3151678A Cited
US3245470A Cited
US3335797A Cited
US3642068A Cited
US3592266A Cited
US3710865A Cited
US3850247A Cited
US3933205A Cited
US3974077A Cited
US3948325A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-03-13 1981-09-12 1982-03-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-03-13 1985-09-12 1986-03-14 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-03-13 1989-09-12 1990-03-14 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag