Patent US4061533A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4061533A Expired / Lapsed US ⏱️ 0.0 years remaining

Control system for a nuclear power producing unit

Assignee: Babcock and Wilcox Co
•
Filing: 1975-09-25
•
Granted: 1977-12-06
•
Expires: 1995-09-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A co-ordinated control system for a nuclear power producing unit having a pressurized water reactor, a plurality of once through steam generators through which the coolant from the reactor is circulated in parallel, and a turbine generator supplied steam from the steam generators for the production of electric power.

Inventors

  • 👤 Oliver W. Durrant

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 13:08
CPC Classifications
G; G21; G21D; G21D3/00; G21D3/08; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 16
Claim 1
Independent Claim 140 words
In a control system for a nuclear power producing unit comprising a pressurized water reactor, a once-through steam generator provided with feedwater supply means, a turbine-generator supplied with steam from the steam generator and means maintaining a flow of pressurized water through the reactor and steam generator, the combination comprising; means generating a feed forward control signal proportional to the desired power output of the power producing unit, a second means for adjusting the reactor heat release, a third means for adjusting the rate of flow of feedwater to the steam generator, said second and third means solely responsive to and operated in parallel from said feed forward control signal whereby the reactor heat release and the rate of flow of feedwater to the steam generator are each maintained in a discrete functional relationship to said feed forward control signal.
Claim 2
Dependent Claim 140 words
In a control system for a nuclear power producing unit comprising a pressurized water reactor, a once-through steam generator provided with feedwater supply means, a turbine-generator supplied with steam from the steam generator and means maintaining a flow of pressurized water through the reactor and steam generator, the combination comprising; means generating a feed forward control signal proportional to the desired power output of the power producing unit, a second means for adjusting the reactor heat release, a third means for adjusting the rate of flow of feedwater to the steam generator, said second and third means solely responsive to and operated in parallel from said feed forward control signal whereby the reactor heat release and the rate of flow of feedwater to the steam generator are each maintained in a discrete functional relationship to said feed forward control signal.
Claim 3
Dependent Claim 52 words
In a control system as set forth in claim 1 further including a fourth means for adjusting the rate of flow of steam from the steam generator to the turbine, said fourth means solely responsive to and operated in parallel with said second and third means from said feed forward control signal.
Claim 4
Dependent Claim 38 words
In a control system as set forth in claim 1 further including a function generator responsive to said feed forward signal and producing a modified feed forward signal, said second means responsive to said modified feed forward signal.
Claim 5
Dependent Claim 46 words
In a control system as set forth in claim 1 further including means modifying the response of said second means to said feed forward signal in proportion to the time integral of the difference between the desired and actual power output of the power producing unit.
Claim 6
Dependent Claim 48 words
In a control system as set forth in claim 2 wherein the nuclear power producing unit has a plurality of critical parameters, further including means modifying the discrete response of said second, third and fourth means in proportion to changes in the magnitudes of said plurality of parameters.
Claim 7
Dependent Claim 53 words
In a control system as set forth in claim 1 further including means modifying the response of said third means to said feed forward signal in proportion to the time integral of the deviation in the average of the temperatures of the said pressurized water entering and leaving the reactor from set point.
Claim 8
Dependent Claim 58 words
In a control system as set forth in claim 6 further including means modifying the response of said third means in accordance with the average of the temperatures of the said pressurized water entering and leaving the reactor from set point in proportion to the difference between the desired and actual power output of the power producing unit.
Claim 9
Dependent Claim 42 words
In a control system as set forth in claim 1 further including means modifying the response of said third means to said feed forward signal in functional relationship to changes in the rate of said pressurized water flow through the steam generator.
Claim 10
Dependent Claim 40 words
In a control system as set forth in claim 1 further including means modifying the response of said third means to said feed forward control signal in proportion to changes in the temperature of the feedwater entering the steam generator.
Claim 11
Dependent Claim 74 words
In a control system as set forth in claim 1 wherein the nuclear power producing unit includes a second once-through steam generator provided with feedwater supply means and supplying steam to the turbine-generator and means maintaining said pressurized water flow through the reactor and said second steam generator, the combination further comprising; means for maintaining the total rate of feedwater flow to said generators in a discreet functional relationship to said feed forward signal.
Claim 12
Dependent Claim 52 words
In a control system as set forth in claim 10 further including means for adjusting the relative rates of feedwater flow to the steam generators in accordance with the difference in the average temperatures of the said pressurized water entering and leaving said first named steam generator and said second steam generator.
Claim 13
Dependent Claim 37 words
In a control system as set forth in claim 11 further including means adjusting the relative rates of feedwater flow to the steam generators in accordance with the time integral of the difference in said average temperatures.
Claim 14
Dependent Claim 42 words
In a control system as set forth in claim 10 further including means for adjusting the relative rates of feedwater flow to the steam generators in accordance with changes in the relative rates of said pressurized water flow through the steam generators.
Claim 15
Dependent Claim 37 words
The combination as set forth in claim 10 further including means for adjusting the relative rates of feedwater flow to the steam generators in proportion to the difference in temperatures of the feedwater supplied the steam generators.
Claim 16
Dependent Claim 73 words
The combination as set forth in claim 10 further including means for adjusting the relative rates of feedwater flow to the steam generators in accordance with the algebraic sum of the difference in the average of the temperatures of the said pressurized water entering and leaving the steam generators, the relative rates of said pressurized water flow through the steam generators and the difference in temperature of the feedwater supplied the steam generators.

References Cited (Backward Citations)

US3008889A Cited
US3042600A Cited
US2989453A Cited
US3061533A Cited
US3253994A Cited
US3434924A Cited
US3630839A Cited
US3671390A Cited
US3778347A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-12-05 1981-06-06 1981-12-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-12-05 1985-06-06 1985-12-06 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-12-05 1989-06-06 1989-12-06 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag