← Back to Patent Explorer
US3671390A Expired / Lapsed US ⏱️ 0.0 years remaining

Fast initial response nuclear reactor control system

Assignee: General Electric Co
•
Filing: 1969-02-14
•
Granted: 1972-06-20
•
Expires: 1989-02-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A control system for boiling moderator-coolant nuclear reactors giving fast response to load changes is disclosed. In this system, the broad operating level of the reactor is set by adjusting the control rods. Then, the reactor operating level is adjusted to follow load requirements by changing the coolant recirculation flow rate. In order to provide fast initial response to rapid load changes an arrangement is provided cooperating with the recirculation flow control to lower the pressure regulator set point when steam demand increases so that reactor internal pressure is temporarily decreased causing increased steam generation due to flashing and sending more steam to the load. A cooperating bypass system is provided to accommodate large sudden decreases in the load steam requirements.

Inventors

  • 👤 John J Hogle

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 17:06
CPC Classifications
G; G21; G21D; G21D3/00; G21D3/08; G21D3/12; G21D3/14; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1975-06-20 1975-12-20 1976-06-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1979-06-20 1979-12-20 1980-06-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1983-06-20 1983-12-20 1984-06-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag