US7839275B2
Expired / Lapsed
US
⏱️ 0.0 years remaining
Methods, systems and computer program products for controlling a climate in a building
Assignee: Truveon Corp
•
Filing: 2005-11-09
•
Granted: 2010-11-23
•
Expires: 2025-11-09
Abstract
Abstract Methods, systems and computer program products are provided for controlling a climate in a building. Sensed data is received at a local processor in the building. The sensed data is associated with the climate in the building, weather outside the building and/or occupants of the building. The received sensed data is compared at the local processor with corresponding predictive data associated with the climate in the building, weather outside the building and/or occupants of the building. One or more parameters associated with the climate of the building is adjusted at the local processor based on a result of the comparison of the received sensed data and the predictive data.
Inventors
- 👤 Jan-Dieter Spalink
- 👤 Randall C. Nortman
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-02 10:25
CPC Classifications
G; G05; G05D; G05D23/00; G05D23/19; G05D23/1927; G05D23/193; G05D23/1931; F; F24; F24F; F24F11/00; F24F11/30; F24F11/32; F24F11/38; F24F11/46; F24F11/50; F24F11/56; F24F11/58; F24F11/62; F24F11/63; F24F11/64; F24F2110/00; F24F2110/10; F24F2110/12; F24F2120/00; F24F2120/10; F24F2120/20; F24F2130/00; F24F2130/10
Claims Analysis
Total Claims: 33
Claim 1
Independent Claim
210 words
A method for controlling a climate in a building, the method comprising: receiving sensed data at a local processor in the building, the sensed data being associated with the climate in the building, weather outside the building and/or occupants of the building; comparing, at the local processor, the received sensed data with corresponding predictive data, the predictive data being based on the climate in the building and other buildings, weather outside the building and other buildings and/or occupants of the building and other buildings; and adjusting, at the local processor, at least one parameter associated with the climate of the building based on a result of the comparison of the received sensed data and the predictive data, wherein the local processor in the building communicates with a central processor associated with the building and the other buildings; wherein the local processor in the building is further configured to adjust the at least one parameter associated with the climate of the building for real-time minute-to-minute adjustments within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and other buildings.
Claim 2
Independent Claim
210 words
A method for controlling a climate in a building, the method comprising: receiving sensed data at a local processor in the building, the sensed data being associated with the climate in the building, weather outside the building and/or occupants of the building; comparing, at the local processor, the received sensed data with corresponding predictive data, the predictive data being based on the climate in the building and other buildings, weather outside the building and other buildings and/or occupants of the building and other buildings; and adjusting, at the local processor, at least one parameter associated with the climate of the building based on a result of the comparison of the received sensed data and the predictive data, wherein the local processor in the building communicates with a central processor associated with the building and the other buildings; wherein the local processor in the building is further configured to adjust the at least one parameter associated with the climate of the building for real-time minute-to-minute adjustments within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and other buildings.
Claim 3
Dependent Claim
63 words
The method of claim 1 , further comprising: comparing, at the local processor, the received sensed data with local performance metrics and/or specifications associated with the building, wherein adjusting further comprises adjusting at least one parameter associated with the climate based on a result of the comparison of the received sensed data and the local performance metrics and/or specifications associated with the building.
Claim 4
Dependent Claim
94 words
The method of claim 2 , further comprising: receiving, at the central processor coupled to the local processor, the sensed data associated with the building and sensed data associated with at least one other building; analyzing, at the central processor, the received sensed data associated with the building and the at least one other building; receiving, at the local processor from the central processor, a control modification based on the analyzed sensed data; and modifying, at the local processor, the local performance metrics and/or specifications associated with the building based on the control modification.
Claim 5
Dependent Claim
79 words
The method of claim 3 : wherein receiving further comprises receiving non-sensed data associated with the building and non-sensed data associated with the at least one other building; wherein analyzing, at the central processor, further comprises analyzing the received sensed and non-sensed data associated with the building and the at least one other building; and wherein receiving, from the central processor, further comprises receiving a control modification based on the analyzed sensed and non-sensed data, at the local processor.
Claim 6
Dependent Claim
83 words
The method of claim 3 : wherein comparing, at the local processor, the received sensed data with local performance metrics and/or specifications associated with the building further comprises comparing, at the local processor, the received sensed data with the modified local performance metrics and/or specifications; and wherein adjusting further comprises adjusting at least one parameter associated with the climate based on a result of the comparison of the received sensed data and the modified local performance metrics and/or specifications associated with the building.
Claim 7
Dependent Claim
21 words
The method of claim 3 , further comprising modifying, at the local processor, the predictive data based on the control modification.
Claim 8
Dependent Claim
46 words
The method of claim 3 , wherein receiving, at the central processor coupled to the local processor, the sensed data associated with the building is preceded by: processing the sensed data, at the local processor, such that the sensed data reflects physical attributes of the building.
Claim 9
Dependent Claim
45 words
The method of claim 3 , wherein receiving, at the central processor, is preceded by anonymizing the sensed data associated with the building and/or the occupants of the building and the at least one other building and/or occupants of the at least one other building.
Claim 10
Dependent Claim
64 words
The method of claim 1 , further comprising: receiving, at the local processor, a request for a thermal comfort condition and/or an indoor air quality condition, wherein adjusting further comprises adjusting at least one parameter associated with the climate of the building based on the received request so as to allow achievement of the requested thermal comfort condition and/or the indoor air quality condition.
Claim 11
Dependent Claim
42 words
The method of claim 9 , further comprising converting, at the local processor, the received request for the thermal comfort condition and/or the indoor air quality condition into a form usable by the local processor to adjust the at least one parameter.
Claim 12
Dependent Claim
34 words
The method of claim 1 , wherein adjusting further comprises adjusting the at least one parameter to maintain a predetermined pressure differential between an interior of the building and an exterior of the building.
Claim 13
Dependent Claim
29 words
The method of claim 11 , wherein adjusting to maintain further comprises maintaining the predetermined pressure differential by allowing controlled amounts of air into the interior of the building.
Claim 14
Dependent Claim
19 words
A method according to claim 1 carried out by a computer program product embodied in a computer readable medium.
Claim 15
Dependent Claim
19 words
A method according to claim 3 carried out by a computer program product embodied in a computer readable medium.
Claim 16
Dependent Claim
19 words
A method according to claim 4 carried out by a computer program product embodied in a computer readable medium.
Claim 17
Independent Claim
215 words
A method for controlling a climate in a building, comprising: receiving a request for a thermal comfort condition and/or an indoor air quality condition at a local processor in the building; converting, at the local processor, the request for the thermal comfort condition and/or the request for the indoor air quality condition into parameters used by the local processor to control the climate in the building; and changing, at the local processor, at least one parameter associated with the climate of the building based on the converted request for the thermal comfort condition and/or the request for the indoor air quality condition and reference data associated with the building and at least one other building, wherein the local processor in the building communicates with a central processor associated with the building and the at least one other building; wherein the local processor in the building is further configured to change the at least one parameter associated with the climate of the building for real-time minute-to-minute changes within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and the at least one other building.
Claim 18
Independent Claim
215 words
A method for controlling a climate in a building, comprising: receiving a request for a thermal comfort condition and/or an indoor air quality condition at a local processor in the building; converting, at the local processor, the request for the thermal comfort condition and/or the request for the indoor air quality condition into parameters used by the local processor to control the climate in the building; and changing, at the local processor, at least one parameter associated with the climate of the building based on the converted request for the thermal comfort condition and/or the request for the indoor air quality condition and reference data associated with the building and at least one other building, wherein the local processor in the building communicates with a central processor associated with the building and the at least one other building; wherein the local processor in the building is further configured to change the at least one parameter associated with the climate of the building for real-time minute-to-minute changes within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and the at least one other building.
Claim 19
Independent Claim
227 words
A system for controlling a climate in a building, the system comprising: a local receiving module at a local processor in the building configured to receive sensed data, the sensed data being associated with the climate in the building, weather outside the building and/or occupants of the building; a comparison module, at the local processor, configured to compare the received sensed data with corresponding predictive data, the predictive data being based on the climate in the building and other buildings, weather outside the building and other buildings and/or occupants of the building and other buildings; and a local adjustment module, at the local processor, configured to adjust at least one parameter associated with the climate of the building based on a result of the comparison of the received sensed data and the predictive data, wherein the local processor in the building communicates with a central processor associated with the building and the other buildings; wherein the local processor in the building is further configured to adjust the at least one parameter associated with the climate of the building for real-time minute-to-minute adjustments within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and other buildings.
Claim 20
Independent Claim
227 words
A system for controlling a climate in a building, the system comprising: a local receiving module at a local processor in the building configured to receive sensed data, the sensed data being associated with the climate in the building, weather outside the building and/or occupants of the building; a comparison module, at the local processor, configured to compare the received sensed data with corresponding predictive data, the predictive data being based on the climate in the building and other buildings, weather outside the building and other buildings and/or occupants of the building and other buildings; and a local adjustment module, at the local processor, configured to adjust at least one parameter associated with the climate of the building based on a result of the comparison of the received sensed data and the predictive data, wherein the local processor in the building communicates with a central processor associated with the building and the other buildings; wherein the local processor in the building is further configured to adjust the at least one parameter associated with the climate of the building for real-time minute-to-minute adjustments within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and other buildings.
Claim 21
Dependent Claim
75 words
The system of claim 17 : wherein the comparison module is further configured to compare, at the local processor, the received sensed data with local performance metrics and/or specifications associated with the building; and wherein the local adjustment module is further configured to adjust at least one parameter associated with the climate based on a result of the comparison of the received sensed data and the local performance metrics and/or specifications associated with the building.
Claim 22
Dependent Claim
118 words
The system of claim 18 , further comprising: a central receiving module, at the central processor coupled to the local processor, configured to receive the sensed data associated with the building and sensed data associated with at least one other building; a central analyzing module, at the central processor, configured to analyze the received sensed data associated with the building and the at least one other building, wherein the local receiving module is further configured to receive, from the central processor, a control modification based on the analyzed sensed data; and a local data processing module, at the local processor, configured to modify the local performance metrics and/or specifications associated with the building based on the control modification.
Claim 23
Dependent Claim
86 words
The system of claim 19 : wherein the central receiving module is further configured to receive non-sensed data associated with the building and non-sensed data associated with the at least one other building; wherein the central analyzing module is further configured to analyze the received sensed and non-sensed data associated with the building and the at least one other building; and wherein the local receiving module is further configured to receive a control modification based on the analyzed sensed and non-sensed data, at the local processor.
Claim 24
Dependent Claim
65 words
The system of claim 19 : wherein the local comparison module is further configured to compare the received sensed data with the modified local performance metrics and/or specifications; and wherein the local adjustment module is further configured to adjust the climate based on a result of the comparison of the received sensed data and the modified local performance metrics and/or specifications associated with the building.
Claim 25
Dependent Claim
25 words
The system of claim 19 , wherein the local data processing module is further configured to modify the predictive data based on the control modification.
Claim 26
Dependent Claim
50 words
The system of claim 19 , wherein the local data processing module is further configured to process the sensed data, at the local processor, such that the sensed data reflects physical attributes of the building before the sensed data associated with the building is received by the central receiving module.
Claim 27
Dependent Claim
53 words
The system of claim 19 , wherein the local data processing module is further configured to anonymize the sensed data associated with the building and the at least one other building before the sensed data associated with the building and the at least one other building is received by the central receiving module.
Claim 28
Dependent Claim
61 words
The system of claim 17 : wherein the local receiving module is further configured to receive a request for a thermal comfort condition; and wherein the local adjustment module is further configured to adjust at least one parameter associated with the climate of the building based on the received request so as to allow achievement of the requested thermal comfort condition.
Claim 29
Dependent Claim
37 words
The system of claim 25 , wherein the local data processing module is further configured to convert the received thermal comfort condition into a form usable by the local processor to adjust the at least one parameter.
Claim 30
Independent Claim
237 words
A method for controlling a climate in a building using a collective performance model based on data associated with a plurality of buildings, the method comprising: receiving sensed data at a local processor in the building, the sensed data being associated with the climate in the building, weather outside the building and/or occupants of the building; providing the received sensed data to a central processor, the central processor being configured to receive sensed data from the building and a plurality of other buildings, analyze the received sensed data from the building and the plurality of other buildings and provide control modifications to the building based on the analyzed sensed data; receiving, at the local processor from the central processor, the control modifications; and modifying, at the local processor, local performance metrics and/or specifications associated with the building based on the control modification, wherein the local processor in the building communicates with the central processor associated with the building and the plurality of other buildings; wherein the local processor in the building is further configured to modify local performance metrics and/or specifications associated with the building for real-time minute-to-minute modifications within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and the plurality of other buildings.
Claim 31
Independent Claim
237 words
A method for controlling a climate in a building using a collective performance model based on data associated with a plurality of buildings, the method comprising: receiving sensed data at a local processor in the building, the sensed data being associated with the climate in the building, weather outside the building and/or occupants of the building; providing the received sensed data to a central processor, the central processor being configured to receive sensed data from the building and a plurality of other buildings, analyze the received sensed data from the building and the plurality of other buildings and provide control modifications to the building based on the analyzed sensed data; receiving, at the local processor from the central processor, the control modifications; and modifying, at the local processor, local performance metrics and/or specifications associated with the building based on the control modification, wherein the local processor in the building communicates with the central processor associated with the building and the plurality of other buildings; wherein the local processor in the building is further configured to modify local performance metrics and/or specifications associated with the building for real-time minute-to-minute modifications within the building and control the climate of the building without communicating with the central processor; and wherein the central processor is configured to update information at each of the local processors of each building based on data associated with the building and the plurality of other buildings.
Claim 32
Dependent Claim
31 words
The method of claim 27 , wherein the control modifications comprise a statistical representation of the sensed data and control processes associated with the building and the plurality of other buildings.
Claim 33
Dependent Claim
33 words
The system of claim 17 , wherein the central processor is further configured to transmit rate incentives and/or other instructions from the utility to the local processor of the building and other buildings.
References Cited (Backward Citations)
US4058254A
Cited
US4195337A
Cited
US4212078A
Cited
US4347712A
Cited
US4495577A
Cited
US4475685A
Cited
US4663703A
Cited
US4916909A
Cited
US5094127A
Cited
US5083501A
Cited
US5115967A
Cited
US5197666A
Cited
US5444612A
Cited
US5318104A
Cited
US5170935A
Cited
US5875108A
Cited
US5920477A
Cited
US5903454A
Cited
US6319599B1
Cited
US5395042A
Cited
US6230501B1
Cited
US6865825B2
Cited
US5680337A
Cited
US5586190A
Cited
US5590205A
Cited
US5511724A
Cited
US5602929A
Cited
US5518176A
Cited
US5901246A
Cited
US5579994A
Cited
US5715320A
Cited
US5737934A
Cited
US6145751A
Cited
US6498958B1
Cited
US6439469B1
Cited
US6850252B1
Cited
US6832251B1
Cited
US6643554B2
Cited
US6330799B1
Cited
US7097111B2
Cited
US6621507B1
Cited
US6442455B1
Cited
US6557771B2
Cited
US6478233B1
Cited
US20040148950A1
Cited
US6454178B1
Cited
US20030197426A1
Cited
US6698663B2
Cited
US6616057B1
Cited
US20030160104A1
Cited
US20040133314A1
Cited
US7130719B2
Cited
US20050102068A1
Cited
US7089087B2
Cited
US20030221717A1
Cited
US6651895B1
Cited
US6719623B1
Cited
US6659360B1
Cited
US20050194455A1
Cited
US20050077037A1
Cited
US7225054B2
Cited
US20070084937A1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2013-11-22 | 2014-05-24 | 2014-11-23 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2017-11-22 | 2018-05-24 | 2018-11-23 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2021-11-22 | 2022-05-24 | 2022-11-23 | $7700.00 | Window Closed / Lapsed |