US6895740B2
Expired / Lapsed
US
⏱️ 0.0 years remaining
Steam ammonia power cycle
Assignee: Individual
•
Filing: 2003-01-21
•
Granted: 2005-05-24
•
Expires: 2023-01-21
Abstract
Abstract An integrated steam-ammonia power cycle is disclosed which achieves a close match to a glide heat source such as exhaust from a gas turbine, and which also eliminates sub-atmospheric pressure operation. With reference to FIG. 1 , the exhaust heats in sequence steam superheater 107 ; steam boiler 105 ; feedwater preheater 104 plus ammonia superheater 103 ; and ammonia preheater 102 . Steam is expanded to at least 17 psia in turbine 108 , then condensed to boil ammonia in boiler 110 . Superheated ammonia is expanded in turbine 112 , and condensed in condenser 114 . Feed ammonia is preheated in at least two parallel preheaters.
Inventors
- 👤 Donald C Erickson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 22:37
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K23/106; F02; F02C; F02C6/00; F02C6/18; F01K23/04; Y; Y02; Y02E; Y02E20/00; Y02E20/16
Claims Analysis
Total Claims: 26
Claim 1
Independent Claim
87 words
An integrated steam-ammonia power cycle for a gas turbine combined cycle plant, said plant comprised of a gas turbine, an exhaust heated steam boiler, a steam superheater and a steam turbine, said power cycle additionally comprised of: a) a steam condenser/ammonia boiler; b) an ammonia superheater, and a feedwater preheater which are heated by said exhaust after said steam boiler; c) an ammonia turbine, condenser, and feed pump; and d) an ammonia feed preheater which is heated by said exhaust after said feedwater preheater and ammonia superheater.
Claim 2
Dependent Claim
87 words
An integrated steam-ammonia power cycle for a gas turbine combined cycle plant, said plant comprised of a gas turbine, an exhaust heated steam boiler, a steam superheater and a steam turbine, said power cycle additionally comprised of: a) a steam condenser/ammonia boiler; b) an ammonia superheater, and a feedwater preheater which are heated by said exhaust after said steam boiler; c) an ammonia turbine, condenser, and feed pump; and d) an ammonia feed preheater which is heated by said exhaust after said feedwater preheater and ammonia superheater.
Claim 3
Dependent Claim
35 words
The cycle according to claim 1 additionally comprised of a parallel ammonia feed preheater which is heated by exhaust vapor from said ammonia turbine, plus a feed splitter which proportions feed between said ammonia preheaters.
Claim 4
Dependent Claim
33 words
The cycle according to claim 1 additionally comprised of a parallel feedwater preheater which is heated by exhaust vapor from said steam turbine, plus a feedwater splitter which proportions feedwater between said preheaters.
Claim 5
Dependent Claim
23 words
The cycle according to claim 1 additionally comprised of a second ammonia superheater which is heated by exhaust vapor from said steam turbine.
Claim 6
Dependent Claim
46 words
The cycle according to claim 1 additionally comprised of a steam reheater which reheats the exit steam from said steam turbine by said exhaust before said boiler, and a second steam turbine which work expands said reheat steam and discharges it to said steam condenser/ammonia boiler.
Claim 7
Dependent Claim
27 words
The cycle according to claim 1 additionally comprised of parallel feed preheaters heated by different sources plus a splitter for both the feedwater and the ammonia feed.
Claim 8
Dependent Claim
29 words
The cycle according to claim 1 additionally comprised of a second ammonia turbine which is supplied with the same pressure and a lower superheat temperature than said ammonia turbine.
Claim 9
Dependent Claim
12 words
The cycle according to claim 1 wherein said ammonia condenser is air-cooled.
Claim 10
Dependent Claim
12 words
The cycle according to claim 1 wherein said ammonia condenser is evaporatively-cooled.
Claim 11
Dependent Claim
90 words
A power plant comprised of: a) a gas turbine; b) a heat recovery unit for the exhaust gas from said gas turbine, said heat recovery unit (HRU) comprised of in order from hot end to cold end: i. a steam superheater; ii. a steam boiler; and iii. an ammonia superheater and feedwater heater; c) a steam turbine which is supplied said superheated steam; d) a steam condenser/ammonia boiler for the exhaust from a steam turbine; e) an ammonia turbine which is supplied said superheated ammonia; and f) an ammonia condenser.
Claim 12
Dependent Claim
90 words
A power plant comprised of: a) a gas turbine; b) a heat recovery unit for the exhaust gas from said gas turbine, said heat recovery unit (HRU) comprised of in order from hot end to cold end: i. a steam superheater; ii. a steam boiler; and iii. an ammonia superheater and feedwater heater; c) a steam turbine which is supplied said superheated steam; d) a steam condenser/ammonia boiler for the exhaust from a steam turbine; e) an ammonia turbine which is supplied said superheated ammonia; and f) an ammonia condenser.
Claim 13
Dependent Claim
26 words
The power plant according to claim 10 additionally comprised of an ammonia feed pump plus an ammonia feed heater at the cold end of said HRU.
Claim 14
Dependent Claim
32 words
The power plant according to claim 10 additionally comprised of an ammonia feed heater for at least part of said ammonia feed, which exchanges heat with the exhaust from said ammonia turbine.
Claim 15
Dependent Claim
32 words
The power plant according to claim 10 additionally comprised of a second feedwater heater for heating part of said feedwater by heat exchange with exhaust from said steam turbine, before said condensing.
Claim 16
Dependent Claim
44 words
The power plant according to claim 10 additionally comprised of a steam reheater in said HRU in a hotter section than said steam boiler, and a second steam turbine for said reheated steam, said steam reheater being supplied from said first steam turbine exhaust.
Claim 17
Dependent Claim
37 words
The power plant according to claim 14 additionally comprised of a second feedwater heater for heating part of said feedwater by heat exchange with exhaust from said second steam turbine, before condensing said exhaust in said condenser/evaporator.
Claim 18
Dependent Claim
30 words
The power plant according to claim 10 additionally comprised of a second ammonia superheater in said HRU in a hotter section than said steam boiler, and a second ammonia turbine.
Claim 19
Dependent Claim
31 words
The power plant according to claim 10 additionally comprised of a second ammonia turbine which is supplied with superheated ammonia from heat exchange with the exhaust of said first ammonia turbine.
Claim 20
Dependent Claim
96 words
A process for producing power from a hot combustion gaseous exhaust comprising: a) heating in sequence a steam superheater, a steam boiler, an ammonia vapor superheater, and an ammonia economizer by said exhaust; b) expanding said steam in a power producing turbine to a super-atmospheric pressure between 17 and 35 psia; c) condensing said expanded steam by boiling ammonia at a pressure between 600 and 1500 psia; d) superheating said boiled ammonia in said heating step; and e) expanding said superheated ammonia in a power producing ammonia turbine to a pressure between 100 and 280 psia.
Claim 21
Dependent Claim
96 words
A process for producing power from a hot combustion gaseous exhaust comprising: a) heating in sequence a steam superheater, a steam boiler, an ammonia vapor superheater, and an ammonia economizer by said exhaust; b) expanding said steam in a power producing turbine to a super-atmospheric pressure between 17 and 35 psia; c) condensing said expanded steam by boiling ammonia at a pressure between 600 and 1500 psia; d) superheating said boiled ammonia in said heating step; and e) expanding said superheated ammonia in a power producing ammonia turbine to a pressure between 100 and 280 psia.
Claim 22
Dependent Claim
29 words
The process according to claim 18 wherein said steam expanding step is in at least two stages, and comprising at least one steam reheating step between the expanding stages.
Claim 23
Dependent Claim
17 words
The process according to claim 18 additionally comprising heating feedwater in parallel with said ammonia superheating step.
Claim 24
Dependent Claim
22 words
The process according to claim 18 additionally comprising maintaining at least about 20 ppm to 5000 ppm steam in said ammonia vapor.
Claim 25
Dependent Claim
107 words
An integrated steam-ammonia power cycle for a gas turbine combined cycle plant, said plant comprised of a gas turbine, an exhaust heated steam boiler, a steam superheater and a steam turbine, said power cycle additionally comprised of; a) a steam condenser/ammonia boiler: b) an ammonia superheater, and a feedwater preheater which are heated by said exhaust after said steam boiler; c) an ammonia turbine, condenser, and feed pump; d) an ammonia feed preheater which is heated by said exhaust after said feedwater preheater and ammonia superheater; and e) a second ammonia turbine which is supplied the same pressure and a lower superheat temperature than said ammonia turbine.
Claim 26
Dependent Claim
107 words
An integrated steam-ammonia power cycle for a gas turbine combined cycle plant, said plant comprised of a gas turbine, an exhaust heated steam boiler, a steam superheater and a steam turbine, said power cycle additionally comprised of; a) a steam condenser/ammonia boiler: b) an ammonia superheater, and a feedwater preheater which are heated by said exhaust after said steam boiler; c) an ammonia turbine, condenser, and feed pump; d) an ammonia feed preheater which is heated by said exhaust after said feedwater preheater and ammonia superheater; and e) a second ammonia turbine which is supplied the same pressure and a lower superheat temperature than said ammonia turbine.
References Cited (Backward Citations)
US3436912A
Cited
US3988140A
Cited
US4875436A
Cited
US5860279A
Cited
US5950433A
Cited
US6558643B2
Cited
US6070426A
Cited
US6435138B2
Cited
US6266953B1
Cited
US6065280A
Cited
US6058695A
Cited
US6173563B1
Cited
US6195997B1
Cited
US6349558B1
Cited
US6269644B1
Cited
US6397596B1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2008-05-23 | 2008-11-22 | 2009-05-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2012-05-23 | 2012-11-22 | 2013-05-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2016-05-23 | 2016-11-22 | 2017-05-24 | $7700.00 | Window Closed / Lapsed |