Claims Analysis
Total Claims: 16
Claim 1
Independent Claim
82 words
A method for closed-loop output control of a steam power plant having a turbo-generator set with a steam turbine, a superheater heating surface and a generator, which comprises: injecting plant water at a superheater heating surface when the steam power plant is in operation; and setting an extra generator output in a range of approximately 3 to 5% of a full load of the power plant within a reaction time of up to approximately 30 seconds by increasing a water injection rate.
Claim 2
Independent Claim
82 words
A method for closed-loop output control of a steam power plant having a turbo-generator set with a steam turbine, a superheater heating surface and a generator, which comprises: injecting plant water at a superheater heating surface when the steam power plant is in operation; and setting an extra generator output in a range of approximately 3 to 5% of a full load of the power plant within a reaction time of up to approximately 30 seconds by increasing a water injection rate.
Claim 3
Dependent Claim
20 words
The method according to claim 1 , wherein the injecting step comprises injecting plant water in the superheater heating surface.
Claim 4
Dependent Claim
21 words
The method according to claim 1 , wherein the injecting step comprises injecting plant water upstream of the superheater heating surface.
Claim 5
Dependent Claim
30 words
The method according to claim 1 , wherein the steam power plant includes a high-pressure superheater and the setting step comprises increasing the water injection rate at the high-pressure superheater.
Claim 6
Dependent Claim
28 words
The method according to claim 1 , wherein the steam power plant includes a reheater and the setting step comprises increasing the water injection rate at the reheater.
Claim 7
Dependent Claim
56 words
The method according to claim 1 , which comprises, after a waiting time of up to approximately one minute after an increase in the water injection rate, lowering a desired value for temperature of the steam flowing out from the superheater heating surface by a prescribable amount calculated from the increase in the water injection rate.
Claim 8
Dependent Claim
59 words
The method according to claim 1 , wherein the steam power plant includes a steam generator and a combustion chamber connected to the steam generator and heated by fossil fuel from a fuel supply, and, simultaneously with increasing the water injection rate, increasing the fuel supply to the combustion chamber by a value matched to the extra generator output.
Claim 9
Dependent Claim
59 words
The method according to claim 1 , wherein the steam power plant includes a steam generator and a combustion chamber connected to the steam generator and heated by fossil fuel from a fuel supply, and, directly after increasing the water injection rate, increasing the fuel supply to the combustion chamber by a value matched to the extra generator output.
Claim 10
Dependent Claim
104 words
A steam power plant receiving water, comprising: a turbo-generator set having a generator and a steam turbine with a water-steam circuit; a controller; and a steam generator having heating surfaces connected to said water-steam circuit of said steam turbine, said heating surfaces including a superheater heating surface having a water injector connected to said controller for setting a water injection rate into said superheater heating surface, said controller sending an actuating signal to said water injector for controlling said water injection rate as a function of a required extra generator output of approximately 3 to 5% of a full load of the power plant.
Claim 11
Dependent Claim
104 words
A steam power plant receiving water, comprising: a turbo-generator set having a generator and a steam turbine with a water-steam circuit; a controller; and a steam generator having heating surfaces connected to said water-steam circuit of said steam turbine, said heating surfaces including a superheater heating surface having a water injector connected to said controller for setting a water injection rate into said superheater heating surface, said controller sending an actuating signal to said water injector for controlling said water injection rate as a function of a required extra generator output of approximately 3 to 5% of a full load of the power plant.
Claim 12
Dependent Claim
26 words
The steam power plant according to claim 9 , wherein said controller prescribes an actuating signal to said water injector for increasing said water injection rate.
Claim 13
Dependent Claim
32 words
The steam power plant according to claim 9 , including a control valve for setting a feedwater supply into said steam generator, said controller having an output connected to said control valve.
Claim 14
Dependent Claim
25 words
The steam power plant according to claim 11 , wherein said output of said controller is connected to said control valve through a signal line.
Claim 15
Dependent Claim
41 words
The steam power plant according to claim 9 , including a combustion chamber connected to said steam generator and a control valve for setting a fuel supply into said combustion chamber, said controller having an output connected to said control valve.
Claim 16
Dependent Claim
25 words
The steam power plant according to claim 13 , wherein said output of said controller is connected to said control valve through a signal line.