Method of operating a steam turbine

Assignee: GE Vernova GmbH
•
Filing: 1996-01-17
•
Granted: 1998-12-08
•
Expires: 2016-01-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a method of operating a steam turbine which consists of at least two separate turbine sections (11, 15), working at different pressures from one another, and works with at least one reheat, in which arrangement the steam is directed to at least one reheater (13) after flowing through the separate turbine section of higher pressure (11), is heated in said reheater (13) and is then fed to the separate turbine section of lower pressure (15), the separate turbine section of lower pressure (15) is fed with cooler steam during the starting and run-up phase than during full-load/continuous operation. This is done, for example, owing to the fact that at least some of the exhaust steam from the separate turbine section of higher pressure (11) is directed via a bypass (18) directly into the separate turbine section of lower pressure (15) during the run-up phase of the turbine, and all the exhaust steam from the separate turbine section of higher pressure (11) is directed into the reheater (13) only upon reaching full-load or in continuous operation, is heated in said reheater (13) and is then fed to the separate turbine section of lower pressure (15). Injection of water into the hot reheater steam is likewise possible. The starting time of the turbine is thereby reduced.

Inventors

  • 👤 Rolf Bachmann

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 17:05
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01D; F01D19/00; F05; F05D; F05D2270/00; F05D2270/01; F05D2270/04; F05D2270/044

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 106 words
A method of operating a steam turbine having at least a higher pressure turbine and a lower pressure section, and at least one reheat circuit between turbine sections, the method comprising the steps of: directing steam to the at least one reheater from the separate turbine section of higher pressure for reheating, feeding the reheated steam to the separate turbine section of lower pressure, and wherein, during a starting and run-up phase until fall-load/continuous operation is reached, the method further comprises the step of injecting water into the reheated steam to cool the reheated steam before feeding the reheated steam to the lower pressure turbine section.
Claim 2
Independent Claim 106 words
A method of operating a steam turbine having at least a higher pressure turbine and a lower pressure section, and at least one reheat circuit between turbine sections, the method comprising the steps of: directing steam to the at least one reheater from the separate turbine section of higher pressure for reheating, feeding the reheated steam to the separate turbine section of lower pressure, and wherein, during a starting and run-up phase until fall-load/continuous operation is reached, the method further comprises the step of injecting water into the reheated steam to cool the reheated steam before feeding the reheated steam to the lower pressure turbine section.
Claim 3
Independent Claim 120 words
A method of operating a steam turbine having at least a higher pressure turbine and a lower pressure section, and at least one reheat circuit between turbine sections, the method comprising the steps of: directing steam to the at least one reheater from the separate turbine section of higher pressure for reheating, and feeding the reheated steam to the separate turbine section of lower pressure, wherein, during a starting and run-up phase until fill-load/continuous operation is reached, the method comprises the steps of directing at least a portion of exhaust steam from the higher pressure turbine section through a bypass line directly into the lower pressure turbine section and injecting water into the steam in the bypass line for cooling.
Claim 4
Independent Claim 120 words
A method of operating a steam turbine having at least a higher pressure turbine and a lower pressure section, and at least one reheat circuit between turbine sections, the method comprising the steps of: directing steam to the at least one reheater from the separate turbine section of higher pressure for reheating, and feeding the reheated steam to the separate turbine section of lower pressure, wherein, during a starting and run-up phase until fill-load/continuous operation is reached, the method comprises the steps of directing at least a portion of exhaust steam from the higher pressure turbine section through a bypass line directly into the lower pressure turbine section and injecting water into the steam in the bypass line for cooling.
Claim 5
Dependent Claim 37 words
The method as claimed in claim 2, wherein all of the exhaust steam from the higher pressure turbine section is directed through the bypass line into the lower pressure turbine section during the starting and run-up phase.

References Cited (Backward Citations)

US4448026A Cited
US4598551A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-12-07 2002-06-08 2002-12-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-12-07 2006-06-08 2006-12-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-12-07 2010-06-08 2010-12-08 $7700.00 Window Closed / Lapsed