Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
228 words
A test system for testing a semiconductor device by having a number of tester pins corresponding to the number of terminal pins of the semiconductor device to be tested, comprising: a tester controller for controlling various operations in the tests system including test patterns to be applied to the semiconductor device, timings and waveforms of the test patterns; a test unit for generating the test patterns and expected value patterns with predetermined timings based on control signals from the tester controller; a pin assignment converter provided between the tester controller and the test unit for providing conversion data showing a conversion relationship between physical pin numbers of the test unit and supplemental tester pin numbers which have been replaced with defective tester pins to the test unit; a test head having drivers for supplying the test patterns from the test unit to the semiconductor device with predetermined amplitudes and comparators for detecting levels of output signals from the semiconductor device and comparing the output levels with the expected values; a switch circuit provided between the test head and the semiconductor device for changing the defective tester pin to the supplemental tester pin based on the conversion data from the pin assignment converter; and a system monitor for monitoring changes in the tester pins in the test system and other changes involving maintenance works and managing the data thereof.
Claim 2
Dependent Claim
228 words
A test system for testing a semiconductor device by having a number of tester pins corresponding to the number of terminal pins of the semiconductor device to be tested, comprising: a tester controller for controlling various operations in the tests system including test patterns to be applied to the semiconductor device, timings and waveforms of the test patterns; a test unit for generating the test patterns and expected value patterns with predetermined timings based on control signals from the tester controller; a pin assignment converter provided between the tester controller and the test unit for providing conversion data showing a conversion relationship between physical pin numbers of the test unit and supplemental tester pin numbers which have been replaced with defective tester pins to the test unit; a test head having drivers for supplying the test patterns from the test unit to the semiconductor device with predetermined amplitudes and comparators for detecting levels of output signals from the semiconductor device and comparing the output levels with the expected values; a switch circuit provided between the test head and the semiconductor device for changing the defective tester pin to the supplemental tester pin based on the conversion data from the pin assignment converter; and a system monitor for monitoring changes in the tester pins in the test system and other changes involving maintenance works and managing the data thereof.
Claim 3
Dependent Claim
49 words
A test system as defined in claim 1 , further comprising a work station which functions as an interface between the test system and a user wherein the user provides the various test conditions in a test program through the work station to carry out the semiconductor device testing.
Claim 4
Dependent Claim
87 words
A test system as defined in claim 1 , further comprising a work station which functions as an interface between the test system and a user wherein the user provides the various test conditions in a test program through the work station to carry out the semiconductor device testing, and wherein the pin assignment converter generates the conversion data which further includes information for replacing logical tester pin numbers specified by the user in the test program through the work station with the physical tester pin numbers.
Claim 5
Dependent Claim
65 words
A test system as defined in claim 3 , wherein the pin assignment converter includes a first memory for storing data converting the logical tester pin numbers to the physical tester pin numbers, a second memory for storing data converting the logical tester pin numbers to the supplemental tester pin numbers, and a multiplexer for selectively outputting the data from the first and second memories.
Claim 6
Dependent Claim
31 words
A test system as defined in claim 1 , wherein the system monitor transfers information concerning the maintenance work of the test system to a service center through a dedicated network.
Claim 7
Dependent Claim
27 words
A test system as defined in claim 1 , a work station is further used as an interface with other test systems through a general purpose network.
Claim 8
Dependent Claim
280 words
A test system for testing a semiconductor device by having a number of tester pins corresponding to the number of terminal pins of the semiconductor device to be tested, comprising: a work station which functions as an interface between the test system and a user of the test system; a tester controller for controlling various operations in the tests system including test patterns to be applied to the semiconductor device, timings and waveforms of the test patterns; a test unit for generating the test patterns and expected value patterns with predetermined timings based on control signals from the tester controller; a pin assignment converter provided between the tester controller and the test unit for providing first conversion data and second conversion data to the test unit, the first conversion data showing a conversion relationship between logical tester pin numbers and physical tester pin numbers of the test unit, and the second conversion data showing a conversion relationship between physical pin numbers of the test unit and supplemental tester pin numbers which have been replaced with defective tester pins; a test head having drivers for supplying the test patterns from the test unit to the semiconductor device with predetermined amplitudes and comparators for detecting levels of output signals from the semiconductor device and comparing the output levels with the expected values; a switch circuit provided between the test head and the semiconductor device for changing the defective tester pin to the supplemental tester pin based on the conversion data from the pin assignment converter; and a system monitor for monitoring the change in the tester pins in the test system and other changes involving maintenance works and managing the data thereof.
Claim 9
Dependent Claim
280 words
A test system for testing a semiconductor device by having a number of tester pins corresponding to the number of terminal pins of the semiconductor device to be tested, comprising: a work station which functions as an interface between the test system and a user of the test system; a tester controller for controlling various operations in the tests system including test patterns to be applied to the semiconductor device, timings and waveforms of the test patterns; a test unit for generating the test patterns and expected value patterns with predetermined timings based on control signals from the tester controller; a pin assignment converter provided between the tester controller and the test unit for providing first conversion data and second conversion data to the test unit, the first conversion data showing a conversion relationship between logical tester pin numbers and physical tester pin numbers of the test unit, and the second conversion data showing a conversion relationship between physical pin numbers of the test unit and supplemental tester pin numbers which have been replaced with defective tester pins; a test head having drivers for supplying the test patterns from the test unit to the semiconductor device with predetermined amplitudes and comparators for detecting levels of output signals from the semiconductor device and comparing the output levels with the expected values; a switch circuit provided between the test head and the semiconductor device for changing the defective tester pin to the supplemental tester pin based on the conversion data from the pin assignment converter; and a system monitor for monitoring the change in the tester pins in the test system and other changes involving maintenance works and managing the data thereof.