Claims Analysis
Total Claims: 27
Claim 1
Independent Claim
197 words
A gas stream heat recovery boiler for recovering heat exhaust from at least one combustion gas turbine to drive a load, comprising: at least one air compressor; at least one combustor receiving air provided by said at least one compressor; at least one gas expansion turbine for expanding gas provided by said at least one combustor and for providing first and second separate exhaust gas streams flowing downstream through first and second steam generators, each steam generator having at least one economizer for heating water provided by a water source and at least one evaporator for converting water to steam; a supplementary fired superheater upstream of the first steam generator, the first exhaust gas stream passing through the supplementary fired superheater, then through the first steam generator; and the second exhaust gas stream bypassing the supplementary fired superheater, then passing through the second steam generator, the first and second steam generators configured such that steam flow generated by the first steam generator is combined with steam flow generated by the second steam generator, such that the temperature of the steam produced by the first and second steam generators is increased by heat from the supplementary fired superheater.
Claim 2
Dependent Claim
197 words
A gas stream heat recovery boiler for recovering heat exhaust from at least one combustion gas turbine to drive a load, comprising: at least one air compressor; at least one combustor receiving air provided by said at least one compressor; at least one gas expansion turbine for expanding gas provided by said at least one combustor and for providing first and second separate exhaust gas streams flowing downstream through first and second steam generators, each steam generator having at least one economizer for heating water provided by a water source and at least one evaporator for converting water to steam; a supplementary fired superheater upstream of the first steam generator, the first exhaust gas stream passing through the supplementary fired superheater, then through the first steam generator; and the second exhaust gas stream bypassing the supplementary fired superheater, then passing through the second steam generator, the first and second steam generators configured such that steam flow generated by the first steam generator is combined with steam flow generated by the second steam generator, such that the temperature of the steam produced by the first and second steam generators is increased by heat from the supplementary fired superheater.
Claim 3
Dependent Claim
22 words
The boiler as defined in claim 1, wherein a damper automatically controls flow in the first gas stream by varying back pressure.
Claim 4
Dependent Claim
17 words
The boiler as defined in claim 1, wherein a damper controls flow of the second gas stream.
Claim 5
Dependent Claim
23 words
The boiler as defined in claim 1, further comprising: an induced draft fan for controlling the flow rate of the first gas stream.
Claim 6
Dependent Claim
33 words
The boiler as defined in claim 1, further comprising: first and second substantially rectilinear-shaped exhaust gas flow chambers within the boiler for transmitting the first and second gas streams, respectively, through the boiler.
Claim 7
Dependent Claim
21 words
The boiler as defined in claim 5, further comprising: an isolation wall for separating the first and second substantially rectilinear-shaped chambers.
Claim 8
Dependent Claim
30 words
The boiler as defined in claim 1, further comprising: first and second substantially annular-shaped chambers within the boiler for transmitting the first and second gas streams, respectively, through the boiler.
Claim 9
Dependent Claim
36 words
The boiler as defined in claim 1, further comprising: first and second flow chambers within the boiler for transmitting the respective first and second gas streams through the boiler in a generally vertical gas flow arrangement.
Claim 10
Dependent Claim
36 words
The boiler as defined in claim 1, further comprising: first and second flow chambers within the boiler for transmitting the respective first and second gas streams through the boiler in a generally horizontal gas flow arrangement.
Claim 11
Dependent Claim
37 words
The boiler as defined in claim 1, further comprising: an initial superheater for partially superheating steam with heat from the first and second gas streams; and a supplementary fired superheater for further heating the first gas stream.
Claim 12
Dependent Claim
32 words
The boiler as defined in claim 1, wherein the first gas stream is heated by a burner within the supplementary fired superheater to a temperature of from 1400° F. to 1600° F.
Claim 13
Dependent Claim
32 words
The boiler as defined in claim 1, wherein the first gas stream is heated by a burner within the supplementary fired superheater to a temperature of from 2400° F. to 2600° F.
Claim 14
Dependent Claim
24 words
The boiler as defined in claim 1 further comprising means for controlling the flow of at least one of the two separate gas streams.
Claim 15
Dependent Claim
29 words
The boiler as defined in claim 13 wherein the means for controlling the flow of at least one of the two separate gas streams comprises at least one damper.
Claim 16
Dependent Claim
37 words
The boiler of claim 1 in which the temperature of the first gas stream leaving the supplementary fired superheater is about the same temperature as the temperature of the first gas stream provided by the gas turbine.
Claim 17
Dependent Claim
191 words
A process for generating superheated steam from exhaust heat from at least one combustion gas turbine to drive a load, the process comprising: providing first and second separate exhaust gas streams from said at least one combustion gas turbine; positioning a supplementary fired superheater and s first steam generator having a first economizer for heating a source of water and generating steam along the first exhaust gas stream; positioning a second steam generator having a second economizer for heating a source of water and generating steam along the second exhaust gas stream; while generating steam in said first steam generator and in said second steam generator, increasing the temperature of said first gas stream by supplementary firing fuel upstream of said supplementary fired superheater; superheating the steam generated by said first steam generator and said second steam generator in said supplementary fired superheater by extracting heat from supplementary fired fuel burned in said first gas stream wherein said steam generated by said first steam generator and said second steam generator is combined and said steam is heated by the supplementary fired superheater; and discharging superheated steam from said supplementary fired superheater.
Claim 18
Dependent Claim
191 words
A process for generating superheated steam from exhaust heat from at least one combustion gas turbine to drive a load, the process comprising: providing first and second separate exhaust gas streams from said at least one combustion gas turbine; positioning a supplementary fired superheater and s first steam generator having a first economizer for heating a source of water and generating steam along the first exhaust gas stream; positioning a second steam generator having a second economizer for heating a source of water and generating steam along the second exhaust gas stream; while generating steam in said first steam generator and in said second steam generator, increasing the temperature of said first gas stream by supplementary firing fuel upstream of said supplementary fired superheater; superheating the steam generated by said first steam generator and said second steam generator in said supplementary fired superheater by extracting heat from supplementary fired fuel burned in said first gas stream wherein said steam generated by said first steam generator and said second steam generator is combined and said steam is heated by the supplementary fired superheater; and discharging superheated steam from said supplementary fired superheater.
Claim 19
Dependent Claim
36 words
The process of claim 16 in which the temperature of the first gas stream leaving the supplementary fired superheater is about the same temperature as that of the first gas stream provided by the gas turbine.
Claim 20
Dependent Claim
22 words
The process of claim 16 additionally comprising the step of controlling the gas flow rate of the first and second gas streams.
Claim 21
Dependent Claim
41 words
The process of claim 16 wherein the step of generating steam in the first and second steam generators comprises heating water at an elevated pressure in the first economizer and the second economizer to a temperature sufficient to provide saturated steam.
Claim 22
Dependent Claim
23 words
The process of claim 19, additionally comprising the step of flashing the high pressure heated water to provide a lower pressure saturated steam.
Claim 23
Dependent Claim
23 words
The process of claim 20 additionally comprising the step of ducting the lower pressure saturated steam to said gas turbine for injection therein.
Claim 24
Dependent Claim
22 words
The process of claim 21, additionally comprising the step of heating the lower pressure saturated steam before injection into the gas turbine.
Claim 25
Dependent Claim
31 words
The process of claim 20, wherein the step of flashing the high pressure heated water provides leftover condensate, which is then combined with water fed to the first and second economizers.
Claim 26
Dependent Claim
36 words
The process of claim 23, wherein gas turbine fuel is provided to the gas turbine, additionally comprising the step of heating the gas turbine fuel with heat from at least a portion of the leftover condensate.
Claim 27
Dependent Claim
25 words
The process of claim 16 additionally comprising the step of reducing the temperature of the first and second gas streams to the minimum stack temperature.