← Back to Patent Explorer
US5428950A Expired / Lapsed US ⏱️ 0.0 years remaining

Steam cycle for combined cycle with steam cooled gas turbine

Assignee: General Electric Co
•
Filing: 1993-12-03
•
Granted: 1995-07-04
•
Expires: 2013-12-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a combined cycle system including a gas turbine (412), a steam turbine (420) and a heat recovery steam generator (436), wherein gas turbine exhaust is used in the heat recovery steam generator (436) for reheating steam for the steam turbine (420), an improvement wherein steam is extracted from the high pressure section (422) of the steam turbine 420), conducted to the gas turbine (412) for cooling hot gas turbine parts, and returned to the intermediate pressure section (424) of the steam turbine (420).

Inventors

  • 👤 Leroy O. Tomlinson
  • 👤 Raub W. Smith

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 06:10
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K23/106; F02; F02C; F02C6/00; F02C6/18; F02C7/00; F02C7/12; F02C7/16; F02C7/18; F05; F05D; F05D2260/00; F05D2260/20; F05D2260/232; F05D2260/2322; Y; Y02; Y02E; Y02E20/00; Y02E20/14; Y02E20/16

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 94 words
In a combined cycle system including a gas turbine, a steam turbine and a heat recovery steam generator, wherein gas turbine exhaust is used in the heat recovery steam generator for reheating steam for the steam turbine, the improvement comprising means for supplying gas turbine cooling duty steam from a high pressure section of the steam turbine and conducting the gas turbine cooling duty steam to the gas turbine for cooling hot gas turbine parts, and means for returning the gas turbine cooling duty steam to an intermediate pressure section of the steam turbine.
Claim 2
Dependent Claim 94 words
In a combined cycle system including a gas turbine, a steam turbine and a heat recovery steam generator, wherein gas turbine exhaust is used in the heat recovery steam generator for reheating steam for the steam turbine, the improvement comprising means for supplying gas turbine cooling duty steam from a high pressure section of the steam turbine and conducting the gas turbine cooling duty steam to the gas turbine for cooling hot gas turbine parts, and means for returning the gas turbine cooling duty steam to an intermediate pressure section of the steam turbine.
Claim 3
Dependent Claim 26 words
The improvement of claim 1 wherein said gas turbine cooling duty steam is supplied from the discharge of the high pressure section of the steam turbine.
Claim 4
Dependent Claim 30 words
The improvement of claim 2 wherein said gas turbine cooling duty steam is extracted from a location in the high pressure section of the steam turbine, downstream of the discharge.
Claim 5
Dependent Claim 26 words
The improvement of claim 1 wherein the gas turbine cooling duty steam is returned to an inlet of the intermediate pressure section of the steam turbine.
Claim 6
Dependent Claim 27 words
The improvement of claim 1 wherein the gas turbine cooling duty steam is returned to the intermediate pressure section of the steam turbine downstream of the inlet.
Claim 7
Dependent Claim 31 words
The improvement of claim 1 and including means for conducting steam exiting from the intermediate pressure section of the steam turbine directly to a low pressure section of the steam turbine.
Claim 8
Dependent Claim 42 words
The improvement of claim 1 and including means for conducting steam exiting from the intermediate pressure section of the steam turbine indirectly to a low pressure section of the steam turbine by way of a reheater in the heat recovery steam generator.
Claim 9
Dependent Claim 43 words
The improvement of claim 1 wherein steam from a reheater in the heat recovery steam generator is mixed with said gas turbine cooling duty steam before the gas turbine cooling duty steam is returned to the intermediate pressure section of the steam turbine.
Claim 10
Dependent Claim 21 words
The improvement of claim 8 wherein a portion of said steam from said reheater is conducted to an auxiliary steam header.
Claim 11
Dependent Claim 20 words
The improvement of claim 8 wherein a portion of said steam from said reheater is conducted to a co-generation process.
Claim 12
Dependent Claim 96 words
In a combined cycle system including a gas turbine, a steam turbine, and a heat recovery steam generator wherein gas turbine exhaust is used in the heat recovery steam generator for reheating steam for the steam turbine, the improved method of cooling the gas turbine comprising the steps of: a) removing at least some steam from a high pressure section of the steam turbine and delivering the removed steam to hot parts of the gas turbine to cool said hot parts; and b) returning the removed steam to an intermediate pressure section of the steam turbine.
Claim 13
Dependent Claim 96 words
In a combined cycle system including a gas turbine, a steam turbine, and a heat recovery steam generator wherein gas turbine exhaust is used in the heat recovery steam generator for reheating steam for the steam turbine, the improved method of cooling the gas turbine comprising the steps of: a) removing at least some steam from a high pressure section of the steam turbine and delivering the removed steam to hot parts of the gas turbine to cool said hot parts; and b) returning the removed steam to an intermediate pressure section of the steam turbine.

References Cited (Backward Citations)

US1901873A Cited
US3691760A Cited
GB1408174A Cited
GB1355952A Cited
US3879616A Cited
US4424668A Cited
US4519207A Cited
US4576124A Cited
EP0363979A2 Cited
EP0379930A1 Cited
US5042247A Cited
US5199256A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1998-07-03 1999-01-02 1999-07-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2002-07-03 2003-01-02 2003-07-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2006-07-03 2007-01-02 2007-07-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag