Patent US137771A successfully refreshed from Google Patents.
Patent US5457638A successfully refreshed from Google Patents.
US5457638A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Timing analysis of VLSI circuits
Assignee: NEC Corp
•
Filing: 1993-02-23
•
Granted: 1995-10-10
•
Expires: 2013-02-23
Abstract
Abstract A computer-implemented process for doing timing analysis of a VLSI sequential circuit that includes false paths. It includes the steps of transforming the circuit into a functionally equivalent δ path disjoint circuit for a given delay value and propagating all inverters to primary inputs of the circuit and performing a multifault test on all primary input fanouts of a particular length consisting solely either of all zoroes or of all ones.
Inventors
- 👤 Pranav Ashar
- 👤 Sharad Malik
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-03 14:09
CPC Classifications
G; G01; G01R; G01R31/00; G01R31/28; G01R31/317; G01R31/3181; G01R31/3183; G01R31/318342; G01R31/318357; G01R31/318328; G06; G06F; G06F30/00; G06F30/30; G06F30/32; G06F30/33; G06F30/3308; G06F30/3312
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
171 words
A computer-implemented process for functional timing analysis of a combinational integrated circuit in which there are at least several topologically longest paths comprising the steps of a) first estimating the delay δ of the topologically longest path in a weighted acyclic graph of said circuit, b) transforming said circuit into a functionally equivalent δ path disjoint circuit for the delay value δ, and propagating all the inverters in the circuit to the primary inputs of the circuit, c) performing a multifault test on all primary input fanout points of paths beginning at an input fanout point of length equal to or greater than δ, said multifault test consisting only of all zones or all ones on the said fanouts, and d) if a test is found, treating δ as the delay of the circuit, but if a test is not found, decreasing the values of δ by a unit delay and repeating steps b, c, and d of the process with the decreased values of δ until a test is found.
Claim 2
Dependent Claim
171 words
A computer-implemented process for functional timing analysis of a combinational integrated circuit in which there are at least several topologically longest paths comprising the steps of a) first estimating the delay δ of the topologically longest path in a weighted acyclic graph of said circuit, b) transforming said circuit into a functionally equivalent δ path disjoint circuit for the delay value δ, and propagating all the inverters in the circuit to the primary inputs of the circuit, c) performing a multifault test on all primary input fanout points of paths beginning at an input fanout point of length equal to or greater than δ, said multifault test consisting only of all zones or all ones on the said fanouts, and d) if a test is found, treating δ as the delay of the circuit, but if a test is not found, decreasing the values of δ by a unit delay and repeating steps b, c, and d of the process with the decreased values of δ until a test is found.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1998-10-09 | 1999-04-10 | 1999-10-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2002-10-09 | 2003-04-10 | 2003-10-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2006-10-09 | 2007-04-10 | 2007-10-10 | $7700.00 | Window Closed / Lapsed |