Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
364 words
A power generating plant control apparatus, comprising: a) central supervisory control means for carrying out supervisory control of the operating states of individual generating units constituting a power generating plant by giving instructions necessary for operating said individual generating units in accordance with the usage of an electrical system; b) a plurality of memory means provided in each of said individual generating units for storing data necessary to operate said individual generating units; c) transmission means provided between said central supervisory control means and said plurality of memory means for transmitting said instructions and said data necessary for operating said individual generating units; and d) a plurality of unit control means for collectively operating and controlling said plurality of generating units to control a plurality of operation end groups which are respectively unified to each related operation by using a control logic and applying dedicated operations to said operation end groups, individual unit control means of said plurality of unit control means comprising a storage portion for storing said control logic with a predetermined number of patterns of every individual one of said operation end groups, and a calculation portion for independently selecting said control logic of one of said patterns for each of said operation end groups from said patterns stored in said storage portion on the basis of said instructions supplied from said central supervisory control means through said transmission means, wherein said central supervisory control means, said transmission means, and said plurality of memory means and said plurality of unit control means of said individual generating units, are organically combined with each other in the manner that: i) said instructions from said central supervisory control means are supplied to an individual memory means of said plurality of memory means through said transmission means; ii) said data stored in said individual memory means are read out from said central supervisory control means through said transmission means; iii) said individual unit control means processes and executes the control logic of said instructions from said central supervisory control means; and iv) a monitor display provided in said central supervisory control means displays information related to processing and execution of said individual unit control means.
Claim 2
Dependent Claim
364 words
A power generating plant control apparatus, comprising: a) central supervisory control means for carrying out supervisory control of the operating states of individual generating units constituting a power generating plant by giving instructions necessary for operating said individual generating units in accordance with the usage of an electrical system; b) a plurality of memory means provided in each of said individual generating units for storing data necessary to operate said individual generating units; c) transmission means provided between said central supervisory control means and said plurality of memory means for transmitting said instructions and said data necessary for operating said individual generating units; and d) a plurality of unit control means for collectively operating and controlling said plurality of generating units to control a plurality of operation end groups which are respectively unified to each related operation by using a control logic and applying dedicated operations to said operation end groups, individual unit control means of said plurality of unit control means comprising a storage portion for storing said control logic with a predetermined number of patterns of every individual one of said operation end groups, and a calculation portion for independently selecting said control logic of one of said patterns for each of said operation end groups from said patterns stored in said storage portion on the basis of said instructions supplied from said central supervisory control means through said transmission means, wherein said central supervisory control means, said transmission means, and said plurality of memory means and said plurality of unit control means of said individual generating units, are organically combined with each other in the manner that: i) said instructions from said central supervisory control means are supplied to an individual memory means of said plurality of memory means through said transmission means; ii) said data stored in said individual memory means are read out from said central supervisory control means through said transmission means; iii) said individual unit control means processes and executes the control logic of said instructions from said central supervisory control means; and iv) a monitor display provided in said central supervisory control means displays information related to processing and execution of said individual unit control means.
Claim 3
Dependent Claim
60 words
The power generating plant control apparatus according to claim 1, wherein said unit control means includes said control logic as a program for starting, stopping and load operating said generating units, and further includes a dedicated control board for storing said control logic to perform a predetermined processing on the basis of said instructions provided from said operation end groups.
Claim 4
Dependent Claim
109 words
The power generating plant control apparatus according to claim 1, wherein said operation end groups in said individual generating units are classified into a plurality of operation end groups, said groups including a deaerator/sea-water system, a deaerator circulation system, a feed water pump control system, a high-pressure heater control system, a boiler feed water circulation system, a boiler ventilating control system, a boiler fuel control system, a burner control system, a boiler-temperature-elevation/steam-temperature control system, a turbine control system, a generator/excitation control system, a system for controlling electrical power in the plant, and a water-quantity-sampling/chemicals-injection system, and wherein said power generating plant is applied to a thermal power generating plant.
Claim 5
Dependent Claim
48 words
The power generating plant control apparatus according to claim 1, wherein said apparatus is applied specifically to a coal thermal power generating plant, in which there are included a coal-supply-machine/mill control system and a fuel gas desulfurization control system as said operation end groups in said control system.
Claim 6
Dependent Claim
40 words
The power generating plant control apparatus according to claim 4, wherein said power generating plant control apparatus is applied specifically to a petroleum thermal power generating plant, in which a desulfurization control system is included as said operation end groups.
Claim 7
Dependent Claim
48 words
The power generating plant control apparatus according to claim 4, wherein said power generating plant control apparatus is applied specifically to a liquified natural gas (LNG) thermal power generating plant, in which a gas carburetor/supply control system is included as said operation end groups of said control apparatus.