← Back to Patent Explorer
US4118635A Expired / Lapsed US ⏱️ 0.0 years remaining

Synchronization system for a combined cycle electric power plant

Assignee: Westinghouse Electric Corp
•
Filing: 1974-08-08
•
Granted: 1978-10-03
•
Expires: 1994-08-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A combined cycle electric power plant includes gas and steam turbines and steam generators and a digital/analog control system. In the control system, an automatic digital computer control generates position setpoints for the gas turbine fuel valves and the steam turbine inlet valves to control speed and load. A synchronizer system includes a sequencer which is largely embodied in the digital computer as an element of the automatic control and it further includes a synchronizer which is external to the automatic control. The sequencer connects the synchronizer to synchronize the three generators in a sequence which depends on the startup and loading operation of the turbines, the synchronization operation of the synchronizer and the operation of the breakers. Turbine speed changes are initiated by the speed/load control under synchronizer control.

Inventors

  • 👤 Joseph F. Barrett
  • 👤 Roy W. Kiscaden

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 00:31
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/38; H02J3/40; H02J3/42; F; F01; F01D; F01D17/00; F01D17/20; F01D17/22; F01D17/24

Claims Analysis

Total Claims: 28
Claim 1
Independent Claim 186 words
A combined cycle electric power plant comprising at least one gas turbine, means for generating steam in response to heat energy from said gas turbine, a steam turbine driven by steam supplied to it from said steam generating means, an electric generator driven by each of said turbines, means for controlling the operation of said turbines and steam generating means, said controlling means including a speed control for said gas turbine and a speed control for said steam turbine, means for regulating the field voltage of each of said generators, a circuit breaker means for connecting each of said generators to a power system line, means for generating signals representing each generator voltage and each line voltage, means for responding to the generator and line voltage signals to generate voltage change and turbine speed change outputs needed for synchronization and to generate a breaker close signal when line and generator matching occurs, and means for selectively coupling said responding means to the generator and line voltage signals and the speed control and voltage regulator and breaker means associated with one of said turbines at a time.
Claim 2
Dependent Claim 186 words
A combined cycle electric power plant comprising at least one gas turbine, means for generating steam in response to heat energy from said gas turbine, a steam turbine driven by steam supplied to it from said steam generating means, an electric generator driven by each of said turbines, means for controlling the operation of said turbines and steam generating means, said controlling means including a speed control for said gas turbine and a speed control for said steam turbine, means for regulating the field voltage of each of said generators, a circuit breaker means for connecting each of said generators to a power system line, means for generating signals representing each generator voltage and each line voltage, means for responding to the generator and line voltage signals to generate voltage change and turbine speed change outputs needed for synchronization and to generate a breaker close signal when line and generator matching occurs, and means for selectively coupling said responding means to the generator and line voltage signals and the speed control and voltage regulator and breaker means associated with one of said turbines at a time.
Claim 3
Dependent Claim 27 words
A combined cycle electric power plant as claimed in claim 1 wherein the responding means is a synchronizer circuit and said speed control includes a digital computer.
Claim 4
Dependent Claim 50 words
A combined cycle electric power plant as claimed in claim 1 wherein means are provided for delaying the breaker close signal for each breaker means by an amount characteristic to the breaker means so as to equalize the anticipated breaker close time for all breaker means in said responding means.
Claim 5
Dependent Claim 72 words
A combined cycle electric power plant as claimed in claim 1 wherein said coupling means includes respective sets of switch means for the generator and line voltage signals and the turbine speed controls and the voltage regulators and the breaker means for the respective turbine-generators, and means for operating said sets of switch means in a predetermined sequence to obtain sequenced synchronization of the turbine-generators during a plant or multiple turbine startup.
Claim 6
Dependent Claim 32 words
A combined cycle electric power plant as claimed in claim 4 wherein said switch operating means operates said switch means in accordance with the order in which the turbines reach synchronous speed.
Claim 7
Dependent Claim 29 words
A combined cycle electric power plant as claimed in claim 4 wherein means are provided for rejecting any turbine-generator from sequenced synchronization that fails to satisfy predetermined process conditions.
Claim 8
Dependent Claim 32 words
A combined cycle electric power plant as claimed in claim 6 wherein the rejection conditions include a failure of a turbine to reach synchronous speed in less than a predetermined time period.
Claim 9
Dependent Claim 29 words
A combined cycle electric power plant as claimed in claim 6 wherein the rejection conditions include a failure of a turbine-generator to be synchronized within a predetermined time period.
Claim 10
Dependent Claim 32 words
A combined cycle electric power plant as claimed in claim 6 wherein the rejection conditions include a failure of a closed breaker to remain closed for more than a predetermined time period.
Claim 11
Dependent Claim 31 words
A combined cycle electric power plant as claimed in claim 6 wherein the rejection conditions include a failure of a turbine to drive its generator to a predetermined minimum load level.
Claim 12
Dependent Claim 29 words
A combined cycle electric power plant as claimed in claim 7 wherein the rejection conditions include a failure of a turbine-generator to be synchronized within a predetermined time period.
Claim 13
Dependent Claim 32 words
A combined cycle electric power plant as claimed in claim 11 wherein the rejection conditions include a failure of a closed breaker to remain closed for more than a predetermined time period.
Claim 14
Dependent Claim 43 words
A combined cycle electric power plant as claimed in claim 4 wherein an operator panel is provided and means are provided on said panel for generating signals which are coupled to said switch operating means to function as permissives for automatic sequenced synchronizations.
Claim 15
Dependent Claim 35 words
A combined cycle electric power plant as claimed in claim 4 wherein said responding means is a synchronizer circuit and said speed controls include a digital computer, and said computer includes said switch operating means.
Claim 16
Dependent Claim 38 words
A combined cycle electric power plant as claimed in claim 2 wherein said computer includes means for generating outputs to operate said coupling means so that the turbine-generators are synchronized in a sequence dependent on real time events.
Claim 17
Dependent Claim 68 words
A combined cycle electric power plant as claimed in claim 15 wherein said synchronizer circuit applies speed change signals to said computer means and provides for speed generating signals representing the turbine speeds, said computer generates a fuel and steam valve position references for said turbines as a function of the speed signals during speed control and as a function of the speed change signals during synchronizer operation.
Claim 18
Dependent Claim 31 words
A combined cycle electric power plant as claimed in claim 1 wherein said controlling means includes a digital computer and said computer at least functions as part of said speed controls.
Claim 19
Independent Claim 166 words
A system for sequentially synchronizing multiple generators in a combined cycle plant having means for generating steam in response to heat energy from said gas turbine, a steam turbine driven by steam supplied to it from said steam generating means, said synchronizing system comprising a speed control for said gas turbine and a speed control for said steam turbine, means for regulating the field voltage of each of said generators, a circuit breaker means for connecting each of said generators to a power system line, means for generating signals representing each generator voltage and each line voltage, means for responding to the generator and line voltage signals to generate voltage change and turbine speed change outputs needed for synchronization and to generate a breaker close signal when line and generator matching occurs, and means for selectively coupling said responding means to the generator and line voltage signals and the speed control and voltage regulator and breaker means associated with one of said turbines at a time.
Claim 20
Independent Claim 166 words
A system for sequentially synchronizing multiple generators in a combined cycle plant having means for generating steam in response to heat energy from said gas turbine, a steam turbine driven by steam supplied to it from said steam generating means, said synchronizing system comprising a speed control for said gas turbine and a speed control for said steam turbine, means for regulating the field voltage of each of said generators, a circuit breaker means for connecting each of said generators to a power system line, means for generating signals representing each generator voltage and each line voltage, means for responding to the generator and line voltage signals to generate voltage change and turbine speed change outputs needed for synchronization and to generate a breaker close signal when line and generator matching occurs, and means for selectively coupling said responding means to the generator and line voltage signals and the speed control and voltage regulator and breaker means associated with one of said turbines at a time.
Claim 21
Dependent Claim 25 words
A synchronizer system as set forth in claim 18 wherein said responding means is a synchronizer circuit and said speed controls include a digital computer.
Claim 22
Dependent Claim 46 words
A synchronizer system as set forth in claim 18 wherein means are provided for delaying the breaker close signal for each breaker by an amount characteristic to the breaker so as to equalize the anticipated breaker close time for all breaker means in said responding means.
Claim 23
Dependent Claim 70 words
A synchronizer system as set forth in claim 18 wherein said coupling means includes respective sets of switch means for the generator and line voltage signals and the turbine speed controls and the voltage regulators and the breaker means for the respective turbine-generators, and means for operating said sets of switch means in a predetermined sequence to obtain sequenced synchronization of the turbine-generators during a plant or multiple turbine startup.
Claim 24
Dependent Claim 30 words
A synchronizer system as set forth in claim 21 wherein said switch operating means operates said switch means in accordance with the order in which the turbines reach synchronous speed.
Claim 25
Dependent Claim 27 words
A synchronizer system as set forth in claim 21 wherein means are provided for rejecting any turbine-generator from sequenced synchronization that fails to satisfy predetermined process conditions.
Claim 26
Dependent Claim 33 words
A synchronizer system as set forth in claim 21 wherein said responding means is a synchronizer circuit and said speed controls include a digital computer, and said computer includes said switch operating means.
Claim 27
Dependent Claim 36 words
A synchronizer system as set forth in claim 19 wherein said computer includes means for generating outputs to operate said coupling means so that the turbine-generators are synchronizers in a sequence dependent on real time events.
Claim 28
Dependent Claim 66 words
A synchronizer system as set forth in claim 25 wherein said synchronizer circuit applies speed change signals to said computer means and provides for speed generating signals representing the turbine speeds, said computer generates a fuel and steam valve position references for said turbines as a function of the speed signals during speed control and as a function of the speed change signals during synchronizer operation.

References Cited (Backward Citations)

US3300647A Cited
US3427466A Cited
US3489914A Cited
US3794846A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-10-02 1982-04-03 1982-10-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-10-02 1986-04-03 1986-10-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-10-02 1990-04-03 1990-10-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag