Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
211 words
A plant operating method comprising the steps of: detecting plant data from a plant; identifying the actual status of all members of the plant indicating an abnormality of the plant from the detected plant data; estimating a cause of an occurrence of the abnormality in accordance with the actual status of the plant members; predicting the status of all plant members after a given period of time has passed in accordance with the estimated cause: determining whether or not the actual status of the plant members are present in the predicted status of the plant members; repeatedly carrying out the step of estimating a cause of occurrence of the abnormality and predicting the status of all plant members in accordance therewith when it is determined that the actual status of all the plant members are not present in the predicted status of the plant members detected until the actual status of all the plant members come to exist in the predicted status of the plant members; selecting a plant operation plan for overcoming the estimated cause of occurrence of the abnormality when the actual status of all of the plant members are present in the status of the predicted plant members; and operating the plant according to the selected operation plan.
Claim 2
Dependent Claim
211 words
A plant operating method comprising the steps of: detecting plant data from a plant; identifying the actual status of all members of the plant indicating an abnormality of the plant from the detected plant data; estimating a cause of an occurrence of the abnormality in accordance with the actual status of the plant members; predicting the status of all plant members after a given period of time has passed in accordance with the estimated cause: determining whether or not the actual status of the plant members are present in the predicted status of the plant members; repeatedly carrying out the step of estimating a cause of occurrence of the abnormality and predicting the status of all plant members in accordance therewith when it is determined that the actual status of all the plant members are not present in the predicted status of the plant members detected until the actual status of all the plant members come to exist in the predicted status of the plant members; selecting a plant operation plan for overcoming the estimated cause of occurrence of the abnormality when the actual status of all of the plant members are present in the status of the predicted plant members; and operating the plant according to the selected operation plan.
Claim 3
Dependent Claim
30 words
The plant operating method according to claim 1, wherein the step of estimating the cause of occurrence of the abnormality is based upon data providing a cause and effect relationship.
Claim 4
Dependent Claim
117 words
The plant operating method as defined in claim 1, wherein the step of selecting an operation plan for overcoming the estimated cause of the abnormality includes predicting the status of the plant members when the selected operation is put into practice for a given period of time, determining whether or not the selected operation plan should be selected, and repeatedly carrying out selection of an operation plan to overcome an occurrence of the predicted status of the plant members in accordance with the selected operation plan until no operation plan is selected, and thereafter selecting an operating plan which satisfies operating conditions for the plant as the selected operation plan from among the operation plans thus obtained.
Claim 5
Dependent Claim
32 words
The plant operating method according to claim 3, wherein the step of selecting an operation plan includes retrieving data indicting the operation plan corresponding to the predicted status of the plant members.
Claim 6
Dependent Claim
31 words
The plant operating method according to claim 3, including the step of determining the status of the plant members arising as a consequence of the predicted status of the plant members.
Claim 7
Dependent Claim
38 words
The plant operating method according to claim 5, wherein the status of the plant members arising as a consequence of the predicted status of the plant members is obtained by retrieving data providing a cause and effect relationship.
Claim 8
Dependent Claim
85 words
The plant operating method according to claim 1 or 3, further comprising the steps of obtaining a detail procedure for the selected operating plan and determining whether the detail procedure is contrary to the limitations on the plant operation, and carrying out the selected operation plan when the detail procedure is not contrary to limitations on the plant operation, and selecting another operation plan for overcoming the estimated cause of the abnormality when the detail procedure is contrary to the limitations on the plant operation.