Method for managing production line processes

Assignee: Mitsubishi Electric Corp
•
Filing: 1989-12-07
•
Granted: 1992-05-05
•
Expires: 2009-12-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A system for managing successive processes which are to be performed on raw articles in a production line for producing finished articles. The system comprises a process managing block for receiving data on preceding processes which have already been performed on partially finished articles on the production line and delivers conditions for the processes which are to be subsequently performed on the production line, a data accumulation block for statistically accumulating data concerning preceding processes carried out on the production line, and a simulation block for determining optimum conditions for the processes which are to be subsequently performed based on the data concerning the preceding processes which have been actually performed on the production line and the statistical data accumulated on the data accumulation block. The simulation block provides optimum process conditions to the process managing block. Any deviation of the characteristics of the unfinished product caused by preceding processes are compensated for by appropriately varying the conditions of the subsequent processes whereby finished articles of high quality are produced with a high yield.

Inventors

  • 👤 Norihiko Kotani

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 06:06
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41875; H; H10; H10P; H10P74/00; H10P74/23; G05B2219/00; G05B2219/30; G05B2219/32; G05B2219/32015; G05B2219/32197; G05B2219/32249; Y; Y02; Y02P; Y02P90/00; Y02P90/02

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 208 words
A method for managing processes that are successively carried out by a plurality of individual apparatus in a production line to produce operational finished articles from unfinished articles comprising: inputting a recipe to each of a plurality of individual production apparatus, each apparatus carrying out at least one process in a production line being supplied with unfinished articles at the beginning of the production line, producing partly finished articles in the production line and producing operational finished articles at the end of the production line; monitoring data concerning at least one of the processes which has already been carried out on partially finished articles in accordance with at least one recipe; simulating the operational characteristics of finished articles from the data concerning the partially finished articles and the recipes input to the production apparatus for producing finished articles from the partially finished articles; determining process conditions for the processes for production of finished articles from the partially finished articles in response to the simulation of operational characteristics to produce finished articles having desired operational characteristics; and controlling the conditions in response to the determined process conditions of at least one process to be carried out to produce, from partially finished articles, finished articles having the desired operational characteristics.
Claim 2
Independent Claim 208 words
A method for managing processes that are successively carried out by a plurality of individual apparatus in a production line to produce operational finished articles from unfinished articles comprising: inputting a recipe to each of a plurality of individual production apparatus, each apparatus carrying out at least one process in a production line being supplied with unfinished articles at the beginning of the production line, producing partly finished articles in the production line and producing operational finished articles at the end of the production line; monitoring data concerning at least one of the processes which has already been carried out on partially finished articles in accordance with at least one recipe; simulating the operational characteristics of finished articles from the data concerning the partially finished articles and the recipes input to the production apparatus for producing finished articles from the partially finished articles; determining process conditions for the processes for production of finished articles from the partially finished articles in response to the simulation of operational characteristics to produce finished articles having desired operational characteristics; and controlling the conditions in response to the determined process conditions of at least one process to be carried out to produce, from partially finished articles, finished articles having the desired operational characteristics.
Claim 3
Independent Claim 256 words
A method for managing processes that are successively carried out by a plurality of individual apparatus in a production line to produce operational finished articles from unfinished articles and a plurality of individual inspection apparatus for obtaining data concerning partially finished articles in the production line comprising: inputting a recipe to each of a plurality of individual production apparatus, each apparatus carrying out at least one process in a production line being supplied with unfinished articles at the beginning of the production line, producing partly finished articles in the production line and producing operational finished articles at the end of the production line; monitoring data concerning at least one of the processes which has already been carried out on partially finished articles in accordance with at least one recipe; collecting data concerning at least one inspection of partially finished articles processed in accordance with at least one of the recipes; simulating the operational characteristics of finished articles from the data concerning the partially finished articles and the recipes input to the production apparatus for producing finished articles from the partially finished articles; determining process conditions for the processes for production of finished articles from the partially finished articles in response to the simulation of operational characteristics of finished articles and the collected data in order to produce finished articles having desired operational characteristics; and controlling the conditions in response to the determined process conditions of at least one process to be carried out to produce, from partially finished articles, finished articles having the desired operational characteristics.
Claim 4
Independent Claim 256 words
A method for managing processes that are successively carried out by a plurality of individual apparatus in a production line to produce operational finished articles from unfinished articles and a plurality of individual inspection apparatus for obtaining data concerning partially finished articles in the production line comprising: inputting a recipe to each of a plurality of individual production apparatus, each apparatus carrying out at least one process in a production line being supplied with unfinished articles at the beginning of the production line, producing partly finished articles in the production line and producing operational finished articles at the end of the production line; monitoring data concerning at least one of the processes which has already been carried out on partially finished articles in accordance with at least one recipe; collecting data concerning at least one inspection of partially finished articles processed in accordance with at least one of the recipes; simulating the operational characteristics of finished articles from the data concerning the partially finished articles and the recipes input to the production apparatus for producing finished articles from the partially finished articles; determining process conditions for the processes for production of finished articles from the partially finished articles in response to the simulation of operational characteristics of finished articles and the collected data in order to produce finished articles having desired operational characteristics; and controlling the conditions in response to the determined process conditions of at least one process to be carried out to produce, from partially finished articles, finished articles having the desired operational characteristics.

References Cited (Backward Citations)

US3922642A Cited
US3751647A Cited
US4038531A Cited
US4571685A Cited
US4719586A Cited
US4796194A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1995-05-05 1995-11-04 1996-05-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1999-05-05 1999-11-04 2000-05-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2003-05-05 2003-11-04 2004-05-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag