← Back to Patent Explorer
US5058676A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for setting well casing using a resin coated particulate

Assignee: Halliburton Co
•
Filing: 1989-10-30
•
Granted: 1991-10-22
•
Expires: 2009-10-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An improved method for completing wells formed in both consolidated and unconsolidated formations is disclosed. Further, methods are disclosed for completing deviated wells formed in consolidated formations which require stimulation by hydraulic fracturing. The present invention specifically relates to more efficient, less expensive techniques for well completion comprising novel techniques for the utilization of permeably consolidatably, resin coated particulates.

Inventors

  • 👤 Harvey J. Fitzpatrick
  • 👤 Jimmie D. Weaver
  • 👤 J. Michael Wilson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 18:07
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/60; C09K8/80; E; E21; E21B; E21B29/00; E21B43/00; E21B43/02; E21B43/025; E21B43/04; E21B43/11; E21B43/116; E21B43/25; E21B43/26; E21B43/261

Claims Analysis

Total Claims: 23
Claim 1
Independent Claim 98 words
An improved method for well completion comprising the steps of: injecting a consolidatable resin coated particulate slurry through unperforated production casing set in the production zone of a producing formation such that said slurry flows into an annulus formed between the casing and the wellbore to form a zone of high conductivity substantially surrounding said casing and communicating with said casing and said formation and concurrently with such injection creating at least one fracture in said formation with said slurry; said formation with said slurry; permitting said consolidatable resin to harden; and perforating the casing and consolidated zone.
Claim 2
Dependent Claim 98 words
An improved method for well completion comprising the steps of: injecting a consolidatable resin coated particulate slurry through unperforated production casing set in the production zone of a producing formation such that said slurry flows into an annulus formed between the casing and the wellbore to form a zone of high conductivity substantially surrounding said casing and communicating with said casing and said formation and concurrently with such injection creating at least one fracture in said formation with said slurry; said formation with said slurry; permitting said consolidatable resin to harden; and perforating the casing and consolidated zone.
Claim 3
Dependent Claim 26 words
The method as set forth in claim 1 wherein the resin coated particulate slurry is injected into the annulus such that said slurry undergoes sub-erosive flow.
Claim 4
Dependent Claim 21 words
The method as set forth in claim 1 wherein the annulus is formed by the turbulent injection of an abrasive slurry.
Claim 5
Dependent Claim 28 words
The method as set forth in claim 1 wherein the production casing is bonded next to said producing zone by the consolidation of said resin coated particulate slurry.
Claim 6
Dependent Claim 44 words
The method of claim 1 further defined to include the step wherein a slotted liner or wire wrapped screen is introduced into the casing across the production zone and a gravel pack is then performed between the slotted liner or screen and the casing.
Claim 7
Independent Claim 119 words
A method for completing a deviated well, comprising the steps of: injecting an abrasive slurry through unperforated casing set in a producing formation at such a rate that the slurry undergoes turbulent flow between the casing and the walls of the wellbore, such as to form an annulus therebetween; injecting a resin coated particulate slurry through said casing at such a rate that the slurry undergoes sub-erosive flow into the annulus to substantially surround said casing; allowing said resin coated slurry to set and bond the casing in place so as to form a zone of high conductivity adjacent said casing; and perforating the production casing and the high conductivity consolidated zone adjacent said casing to complete said well.
Claim 8
Independent Claim 119 words
A method for completing a deviated well, comprising the steps of: injecting an abrasive slurry through unperforated casing set in a producing formation at such a rate that the slurry undergoes turbulent flow between the casing and the walls of the wellbore, such as to form an annulus therebetween; injecting a resin coated particulate slurry through said casing at such a rate that the slurry undergoes sub-erosive flow into the annulus to substantially surround said casing; allowing said resin coated slurry to set and bond the casing in place so as to form a zone of high conductivity adjacent said casing; and perforating the production casing and the high conductivity consolidated zone adjacent said casing to complete said well.
Claim 9
Dependent Claim 23 words
The method of claim 6 wherein the formation is fractured hydraulically through the pressurized introduction of a resin particulate slurry into the annulus.
Claim 10
Dependent Claim 19 words
The method of claim 6 wherein the casing and consolidated zone is perforated using a limited entry perforation technique.
Claim 11
Dependent Claim 24 words
The method of claim 6 including the additional step wherein the well is produced through a gravel packed liner placed inside said production casing.
Claim 12
Independent Claim 122 words
A method of completing a well formed in a subterranean production zone, comprising the steps of: injecting a resin coated particulate slurry through unperforated casing set in or adjacent to said production zone at a pressure such that said slurry exhibits sub-erosive flow into the annulus formed between said casing and said production zone whereby said slurry substantially surround said casing; allowing said slurry to set in and around said casing in said annulus so as to fix said casing in said production zone; perforating said casing in said production zone at widely spaced intervals; fracturing said production zone by injecting a fluid including a consolidatable slurry into said perforations; and reperforating said production zone to produce additional perforations in said casing.
Claim 13
Independent Claim 122 words
A method of completing a well formed in a subterranean production zone, comprising the steps of: injecting a resin coated particulate slurry through unperforated casing set in or adjacent to said production zone at a pressure such that said slurry exhibits sub-erosive flow into the annulus formed between said casing and said production zone whereby said slurry substantially surround said casing; allowing said slurry to set in and around said casing in said annulus so as to fix said casing in said production zone; perforating said casing in said production zone at widely spaced intervals; fracturing said production zone by injecting a fluid including a consolidatable slurry into said perforations; and reperforating said production zone to produce additional perforations in said casing.
Claim 14
Dependent Claim 20 words
The method of claim 10 where the well is deviated in a consolidated formation which requires stimulation by hydraulic fracturing.
Claim 15
Dependent Claim 13 words
The method of claim 10 wherein the particulates are comprised substantially of sand.
Claim 16
Dependent Claim 48 words
The method of claim 10 further including the steps of: injecting an abrasive slurry through the casing prior to injecting resin coated particulate slurry and said injection being made at a pressure and for a duration sufficient to form an annulus between said casing and said production zone.
Claim 17
Dependent Claim 30 words
The method of claim 13 wherein the pressure at which the abrasive slurry is injected through the casing is such as to cause said abrasive slurry to undergo turbulent flow.
Claim 18
Independent Claim 144 words
A method of completing a well formed in an unconsolidated subterranean production zone, comprising the steps of: setting a liner of unperforated production casing in the well opposite the production zone; injecting a first fluid through said liner and into the annulus between the liner and the wall of the well at such a rate that the first fluid removes undesired debris and mudcake from the wall of the well; injecting a slurry of permeably consolidatable, resincoated, particulate through the liner and into the annulus at such a rate that the slurry forms a pack substantially surrounding said liner in the annulus and undergoes transition flow through the annulus so as to not cause failure or sloughing of the wall of the well; consolidating the pack of the resin coated particulate within the annulus to pack off the production zone; and perforating the liner.
Claim 19
Independent Claim 144 words
A method of completing a well formed in an unconsolidated subterranean production zone, comprising the steps of: setting a liner of unperforated production casing in the well opposite the production zone; injecting a first fluid through said liner and into the annulus between the liner and the wall of the well at such a rate that the first fluid removes undesired debris and mudcake from the wall of the well; injecting a slurry of permeably consolidatable, resincoated, particulate through the liner and into the annulus at such a rate that the slurry forms a pack substantially surrounding said liner in the annulus and undergoes transition flow through the annulus so as to not cause failure or sloughing of the wall of the well; consolidating the pack of the resin coated particulate within the annulus to pack off the production zone; and perforating the liner.
Claim 20
Dependent Claim 20 words
The method of claim 15 wherein said first fluid comprises an acidic solution capable or removing the mudcake by dissolution.
Claim 21
Dependent Claim 17 words
The method of claim 15 wherein said first fluid comprises an abrasive slurry of a particulate material.
Claim 22
Dependent Claim 17 words
The method of claim 15 wherein said first fluid comprises an abrasive slurry comprising resin coated particulate.
Claim 23
Dependent Claim 19 words
The method of claim 15 wherein said first fluid comprises a solution of a chemical dispersant for the mudcake.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1994-10-21 1995-04-22 1995-10-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1998-10-21 1999-04-22 1999-10-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2002-10-21 2003-04-22 2003-10-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag