Abstract
Abstract A perforated liner is sealed at longitudinally spaced intervals with a removable sealant. The partially sealed liner maintains sufficiently high fluid flow velocity outside the liner during gravel packing so as to prevent the formation of gravel dunes. After packing is completed, the sealant is removed permitting the passage of fluids through the liner.
Inventors
- 👤 John W. Graham
- 👤 William M. Salathiel
- 👤 Clay Gruesbeck
- 👤 Thomas W. Muecke
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 20:34
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/10; E21B43/04; E21B43/045; E21B43/08; E21B43/086
Claims Analysis
Total Claims: 34
Claim 1
Independent Claim
95 words
In a method of gravel packing a perforated liner opposite a subterranean formation in a well wherein a carrier liquid having gravel suspended therein is flowed downwardly along the outside of said liner to deposit said gravel around said liner, the improvement comprising: restricting the flow of said carrier liquid into said liner so as to maintain the minimum flow velocity of said carrier liquid along the outside of said liner that is necessary to prevent the premature settling of said gravel and the formation of gravel dunes near the upper portions of said liner.
Claim 2
Dependent Claim
95 words
In a method of gravel packing a perforated liner opposite a subterranean formation in a well wherein a carrier liquid having gravel suspended therein is flowed downwardly along the outside of said liner to deposit said gravel around said liner, the improvement comprising: restricting the flow of said carrier liquid into said liner so as to maintain the minimum flow velocity of said carrier liquid along the outside of said liner that is necessary to prevent the premature settling of said gravel and the formation of gravel dunes near the upper portions of said liner.
Claim 3
Dependent Claim
12 words
The method as recited in claim 1 wherein said well is inclined.
Claim 4
Independent Claim
128 words
A method of gravel packing a liner opposite a subterranean formation in a well comprising: partially sealing a perforated liner at longitudinally spaced intervals with a temporary sealant to substantially reduce the total flow area formed by the perforations of said liner; placing said liner in said well; downwardly flowing a carrier liquid having gravel suspended therein about the outer periphery of said liner to deposit said gravel around said liner, said sealed intervals maintaining sufficient flow velocity of said carrier liquid outside said liner to prevent said gravel from prematurely settling out and from forming gravel dunes near the upper portions of said liner, said carrier liquid returning by flowing through the unsealed perforations of said liner and back up said liner; and therefter removing said sealant.
Claim 5
Independent Claim
128 words
A method of gravel packing a liner opposite a subterranean formation in a well comprising: partially sealing a perforated liner at longitudinally spaced intervals with a temporary sealant to substantially reduce the total flow area formed by the perforations of said liner; placing said liner in said well; downwardly flowing a carrier liquid having gravel suspended therein about the outer periphery of said liner to deposit said gravel around said liner, said sealed intervals maintaining sufficient flow velocity of said carrier liquid outside said liner to prevent said gravel from prematurely settling out and from forming gravel dunes near the upper portions of said liner, said carrier liquid returning by flowing through the unsealed perforations of said liner and back up said liner; and therefter removing said sealant.
Claim 6
Dependent Claim
12 words
The method as recited in claim 3 wherein said well is inclined.
Claim 7
Dependent Claim
44 words
The method as recited in claim 3 wherein said sealant is a fusible, heat-sensitive material with a melting point below the normal temperature of said formation where said liner is placed and wherein said sealant is removed by melting said sealant with formation heat.
Claim 8
Dependent Claim
13 words
The method as recited in claim 5 wherein said fusible material is wax.
Claim 9
Dependent Claim
15 words
The method as recited in claim 5 wherein said fusible material is a thermoplastic resin.
Claim 10
Dependent Claim
17 words
The method as recited in claim 5 wherein said fusible material is a low melting point alloy.
Claim 11
Dependent Claim
33 words
The method as recited in claim 3 wherein said sealant is a fusible, heat-sensitive material and wherein said sealant is removed by melting said sealant with a hot fluid injected into said liner.
Claim 12
Dependent Claim
13 words
The method as recited in claim 9 wherein said hot fluid is steam.
Claim 13
Dependent Claim
13 words
The method as recited in claim 9 wherein said fusible material is wax.
Claim 14
Dependent Claim
15 words
The method as recited in claim 9 wherein said fusible material is a thermoplastic resin.
Claim 15
Dependent Claim
17 words
The method as recited in claim 9 wherein said fusible material is a low melting point alloy.
Claim 16
Dependent Claim
27 words
The method as recited in claim 3 wherein said sealant is a dissolvable material and wherein said sealant is removed by extracting said sealant with a solvent.
Claim 17
Dependent Claim
28 words
The method as recited in claim 3 wherein said sealant is a decomposable material and wherein said sealant is removed by decomposing said sealant with a corrosive chemical.
Claim 18
Dependent Claim
25 words
The method as recited in claim 3 wherein the partial sealing of said liner reduces the total flow area by at least about 60 percent.
Claim 19
Dependent Claim
19 words
The method as recited in claim 16 wherein the flow area reduction is between about 67 and 83 percent.
Claim 20
Dependent Claim
148 words
In a method of gravel packing a perforated liner opposite a subterranean formation in a well wherein a carrier liquid having gravel suspended therein is flowed downwardly along the outside of said liner, said gravel being deposited around said liner, and said carrier liquid is then flowed through the perforations of said liner and upwardly through a return tube which extends substantially through the entire length of said liner, the improvement wherein said liner is provided with a plurality of temporary seals longitudinally spaced therealong to reduce the total flow area of said liner perforations and to thereby maintain sufficient flow velocity of said carrier liquid along the outside of said liner so that the premature settling of said gravel and the formation of gravel dunes near the upper portions of said liner is prevented, said temporary seal being fusible at the normal subsurface temperature of said formation.
Claim 21
Dependent Claim
148 words
In a method of gravel packing a perforated liner opposite a subterranean formation in a well wherein a carrier liquid having gravel suspended therein is flowed downwardly along the outside of said liner, said gravel being deposited around said liner, and said carrier liquid is then flowed through the perforations of said liner and upwardly through a return tube which extends substantially through the entire length of said liner, the improvement wherein said liner is provided with a plurality of temporary seals longitudinally spaced therealong to reduce the total flow area of said liner perforations and to thereby maintain sufficient flow velocity of said carrier liquid along the outside of said liner so that the premature settling of said gravel and the formation of gravel dunes near the upper portions of said liner is prevented, said temporary seal being fusible at the normal subsurface temperature of said formation.
Claim 22
Dependent Claim
71 words
Apparatus for gravel packing wells comprising: a perforated liner; and a removable sealant placed on or in said liner to partially seal said liner, said liner having unsealed perforations substantially throughout its entire length, said sealant being located to selectively seal perforations distributed along said liner to reduce the total flow area of said perforations by at least about 60 percent and to restrict the flow of fluids into said liner.
Claim 23
Dependent Claim
71 words
Apparatus for gravel packing wells comprising: a perforated liner; and a removable sealant placed on or in said liner to partially seal said liner, said liner having unsealed perforations substantially throughout its entire length, said sealant being located to selectively seal perforations distributed along said liner to reduce the total flow area of said perforations by at least about 60 percent and to restrict the flow of fluids into said liner.
Claim 24
Dependent Claim
17 words
Apparatus as defined in claim 19 wherein said sealant partially seals said liner at longitudinally spaced intervals.
Claim 25
Dependent Claim
14 words
Apparatus as defined in claim 19 wherein said sealant is a fusible, heat-sensitive material.
Claim 26
Dependent Claim
12 words
Apparatus as defined in claim 21 wherein said fusible material is wax.
Claim 27
Dependent Claim
14 words
Apparatus as defined in claim 21 wherein said fusible material is a thermoplastic resin.
Claim 28
Dependent Claim
16 words
Apparatus as defined in claim 21 wherein said fusible material is a low melting point alloy.
Claim 29
Dependent Claim
14 words
Apparatus as defined in claim 19 wherein said sealant is a solvent extactable material.
Claim 30
Dependent Claim
13 words
Apparatus as defined in claim 19 wherein said sealant is chemically decomposable material.
Claim 31
Dependent Claim
19 words
Apparatus as defined in claim 19 wherein between about 67 and 83 percent of said flow area is sealed.
Claim 32
Dependent Claim
32 words
Apparatus as defined in claim 19 wherein said sealant is placed so as to leave unsealed a plurality of narrow bands, said bands being evenly distributed along the length of said liner.
Claim 33
Dependent Claim
97 words
Apparatus for gravel packing wells comprising: a perforated liner; a removable sealant, said sealant partially sealing said liner at longitudinally spaced intervals to reduce the total flow area formed by the perforations of said liner so that the flow velocity about the outer periphery of said liner, of a carrier liquid having gravel suspended therein, is sufficiently maintained to prevent said gravel from prematurely settling out and forming gravel dunes near the upper portions of said liner; and a return tube which extends substantially through said liner and which is the return conduit for said carrier liquid.
Claim 34
Dependent Claim
97 words
Apparatus for gravel packing wells comprising: a perforated liner; a removable sealant, said sealant partially sealing said liner at longitudinally spaced intervals to reduce the total flow area formed by the perforations of said liner so that the flow velocity about the outer periphery of said liner, of a carrier liquid having gravel suspended therein, is sufficiently maintained to prevent said gravel from prematurely settling out and forming gravel dunes near the upper portions of said liner; and a return tube which extends substantially through said liner and which is the return conduit for said carrier liquid.
References Cited (Backward Citations)
US3273641A
Cited
US3216497A
Cited
US3277962A
Cited
US3268001A
Cited
US3333635A
Cited
US3322199A
Cited
US3905423A
Cited
US3880233A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-04-18 | 1980-10-18 | 1981-04-19 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-04-18 | 1984-10-18 | 1985-04-19 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-04-18 | 1988-10-18 | 1989-04-19 | $7700.00 | Window Closed / Lapsed |