Patent US2724736A successfully refreshed from Google Patents.
Patent US5021968A successfully refreshed from Google Patents.
US5021968A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Graphics-based wire-cable management system
Assignee: ROBERTSON-CECO Corp
•
Filing: 1989-11-20
•
Granted: 1991-06-04
•
Expires: 2009-11-20
Abstract
Abstract A method manages cable in a building structure that includes the capabilities of automatically routing the cable between two locations in the structure, displaying the cable route, providing alternate cable routes, reporting on the cable and components of the structure, and alerting the user when percent fill capacity of the cable run is exceeded. The method also maintains the service and status of any location in the cable run.
Inventors
- 👤 John A. Ferketic
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 05:12
CPC Classifications
G; G06; G06F; G06F30/00; G06F30/10; G06F30/18; G06F30/13; G06F2113/00; G06F2113/16; Y; Y10; Y10S; Y10S715/00; Y10S715/961; Y10S715/965; Y10S715/969
Claims Analysis
Total Claims: 22
Claim 1
Independent Claim
92 words
A method for managing cable in a building structure using a digital computer comprising the step of inputting into a database of said computer data pertaining to the building structure and the cable, and the computer implemented steps of: routing automatically in the building structure a cable having a service through a cable run having a plurality of cables and a fill capacity; displaying the route of the cable in the building structure; and determining percent fill capacity of the cable run after the routing of the cable through the cable run.
Claim 2
Independent Claim
92 words
A method for managing cable in a building structure using a digital computer comprising the step of inputting into a database of said computer data pertaining to the building structure and the cable, and the computer implemented steps of: routing automatically in the building structure a cable having a service through a cable run having a plurality of cables and a fill capacity; displaying the route of the cable in the building structure; and determining percent fill capacity of the cable run after the routing of the cable through the cable run.
Claim 3
Dependent Claim
21 words
The method as described in claim 1, including the step of reporting on the cable for purposes of inventory and analysis.
Claim 4
Dependent Claim
23 words
The method as described in claim 1 wherein the displaying step includes the step of highlighting at least one type of distribution component.
Claim 5
Dependent Claim
24 words
The method as described in claim 1 wherein the displaying step includes the step of displaying at least one component of the building structure.
Claim 6
Dependent Claim
27 words
The method as described in claim 1 wherein the displaying step includes the step of plotting at least one component at a location in the building structure.
Claim 7
Dependent Claim
46 words
The method as described in claim 5 wherein the plotting step includes the steps of: choosing a plot size and a scale size; selecting at least one type of component to be plotted; and plotting each selected component in a defined location of the building structure.
Claim 8
Dependent Claim
31 words
The method as described in claim 1 wherein the display step includes the step of listing information with regard to the building structure of at least one individual type of component.
Claim 9
Dependent Claim
27 words
The method as described in claim 1 including, before the routing step, the step of modifying the building structure database to take into account any changes thereof.
Claim 10
Dependent Claim
236 words
The method as described in claim 1 wherein the routing step includes the steps of: (a) identifying elements of length corresponding to an origin and a destination; (b) determining whether the origin element of length and the destination element of length identified in step (a) intersect; (c) identifying all elements of length that intersect the origin element of length and all elements of length that intersect the destination element of length; (d) determining whether the elements that intersect the origin element and the elements that intersect the destination element identified in step (c) intersect; (e) repeating step (c) at least once to identify elements of length that intersect elements corresponding with the origin and identified in the previously performed step (c), and to identify elements of length that intersect elements corresponding with the determination and identified in the previously performed step (c) and step (d) at least once to determine whether the elements corresponding with the origin and the elements corresponding with the destination and identified in the last performed step (c) intersect; (f) connecting all the elements of length corresponding with each intersection determined in steps (d) and (e) to form a set of routes; (g) eliminating all routes in the set that cross through, enter or exit a trench more than once; (h) eliminating all routes in the set that are longer than a cable's maximum length; and (i) arranging remaining routes by length.
Claim 11
Dependent Claim
39 words
The method as described in claim 9 wherein the displaying step includes the steps of displaying the routes in the order of increasing length until a desired cable run appears, and storing the desired route in the computer database.
Claim 12
Dependent Claim
60 words
The method as described in claim 1 wherein the routing step includes the steps of: choosing an origin; determining an origin element of length corresponding to the origin; determining a destination element of length corresponding to the destination; and selecting at least one additional element of length which communicates the origin element of length with the destination element of length.
Claim 13
Dependent Claim
42 words
The method as described in claim 1 wherein the determining step includes the step of adding an additional cross-sectional area of cable to an amount of cross-sectional area filled in the cable run; and displaying a preset fullness of the cable run.
Claim 14
Dependent Claim
21 words
The method as described in claim 1 wherein the routing step includes the step of entering the route in the database.
Claim 15
Dependent Claim
25 words
The method as described in claim 13 wherein the routing step includes after the entering step, the step of deleting the route from the database.
Claim 16
Dependent Claim
23 words
The method as described in claim 1 wherein the routing step includes the step of modifying the status and service of the cable.
Claim 17
Dependent Claim
98 words
A cable management system for managing cable in a building structure comprising the steps of: defining the building structure with regard to cable used therein; setting parameters of the structure with regard to the cable; defining specifications with respect to cable used in the structure; routing automatically in the building structure cable through a cable run having a plurality of cables and a fill capacity; determining percent fill capacity of each cable run with each individual cable added; displaying a cable's location in the structure; and reporting on status and service of the cable for analysis and inventory.
Claim 18
Dependent Claim
98 words
A cable management system for managing cable in a building structure comprising the steps of: defining the building structure with regard to cable used therein; setting parameters of the structure with regard to the cable; defining specifications with respect to cable used in the structure; routing automatically in the building structure cable through a cable run having a plurality of cables and a fill capacity; determining percent fill capacity of each cable run with each individual cable added; displaying a cable's location in the structure; and reporting on status and service of the cable for analysis and inventory.
Claim 19
Dependent Claim
128 words
A cable management system for a building comprising a computer having a memory storing a building structure and a cable database, said database including specifications of each type of cable used in the building, building parameters with regard to each cable, and locations of raceways of the building structure with regard to cable used therein; said computer including routing means for automatically routing in the building structure an individual cable having a status and a service through a cable run having a plurality of cables and fill capacity; displaying means for displaying the route of the cable in the building structure, said displaying means connected to said computer; and said computer further including determining means for determining percent fill capacity of each raceway intersection of the cable run.
Claim 20
Dependent Claim
128 words
A cable management system for a building comprising a computer having a memory storing a building structure and a cable database, said database including specifications of each type of cable used in the building, building parameters with regard to each cable, and locations of raceways of the building structure with regard to cable used therein; said computer including routing means for automatically routing in the building structure an individual cable having a status and a service through a cable run having a plurality of cables and fill capacity; displaying means for displaying the route of the cable in the building structure, said displaying means connected to said computer; and said computer further including determining means for determining percent fill capacity of each raceway intersection of the cable run.
Claim 21
Dependent Claim
21 words
The system as described in claim 17 wherein said computer includes means for reporting the status and service of the cable.
Claim 22
Dependent Claim
21 words
The system as described in claim 17 wherein said routing means includes means for storing the cable's route in said memory.
References Cited (Backward Citations)
US4275449A
Cited
JPS59226964A
Cited
US4700317A
Cited
US4615011A
Cited
US4636965A
Cited
US4590336A
Cited
US4752887A
Cited
US4756019A
Cited
US4764873A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1994-06-03 | 1994-12-03 | 1995-06-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1998-06-03 | 1998-12-03 | 1999-06-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2002-06-03 | 2002-12-03 | 2003-06-04 | $7700.00 | Window Closed / Lapsed |