Abstract

Abstract A method for establishing connections by automatically routing a plurality of paths between individual components using initially simple connection path shapes. The method is used to create an interconnection package with better use of wiring space. Each connection, in turn, is removed if previously routed, rerouted and evaluated according to specified penalty costs to minimize undesirable routing characteristics. This method is particularly advantageous in providing automatic path routing in directionally uncommitted planes for wiring highly integrated electric circuits, or the like.

Inventors

  • 👤 Ralph Linsker

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 02:06
CPC Classifications
G; G06; G06F; G06F30/00; G06F30/30; G06F30/39; G06F30/394

Claims Analysis

Total Claims: 52
Claim 1
Independent Claim 311 words
A method of establishing a plurality of connections, using global routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, wherein said connections are formed substantially from I, L, Z and U-shaped paths comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c) and removing from said grid the path assigned to said selected connection; (e) calculating said penalty function for each of the substantially I, L, Z, and U-shaped paths which joins the two pins of said selected connection and whose length does not exceed a specified value; (f) selecting one of said paths based on the value of said penalty function; (g) assigning said selected path to said selected connection; (h) repeating steps (d) through (g) above until a desired number of connections have been routed thereby completing a pass; (i) generating data describing X, Y and Z coordinates of the paths assigned to said routed connections; (j) repeating steps (c) through (i) above until a desired number of passes have been completed; and (k) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 2
Independent Claim 311 words
A method of establishing a plurality of connections, using global routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, wherein said connections are formed substantially from I, L, Z and U-shaped paths comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c) and removing from said grid the path assigned to said selected connection; (e) calculating said penalty function for each of the substantially I, L, Z, and U-shaped paths which joins the two pins of said selected connection and whose length does not exceed a specified value; (f) selecting one of said paths based on the value of said penalty function; (g) assigning said selected path to said selected connection; (h) repeating steps (d) through (g) above until a desired number of connections have been routed thereby completing a pass; (i) generating data describing X, Y and Z coordinates of the paths assigned to said routed connections; (j) repeating steps (c) through (i) above until a desired number of passes have been completed; and (k) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 3
Dependent Claim 27 words
The method of claim 1 wherein the step of selecting one of said paths is performed by selecting that path having a penalty function of smallest value.
Claim 4
Dependent Claim 92 words
The method of claim 1 wherein the step of defining a penalty function includes the following: a cost (WX) per link of path along the X coordinate; a cost (WY) per link of path along the Y coordinate; a cost (BEND) for each bend present in the path; and, a cost (CONG) for each unit by which the number of wires passing through a link (LOAD), exceeds some preselected fraction (THRESH), of the maximum number (CAPACITY) of paths allowed to pass through that link, each of said costs being a real number.
Claim 5
Dependent Claim 15 words
The method of claim 3 wherein the costs vary as a function of node location.
Claim 6
Dependent Claim 18 words
The method of claim 3 wherein the costs vary as a function of which connection is being routed.
Claim 7
Dependent Claim 18 words
The method of claim 1 wherein the step of ulilizing said data includes the step of generating artwork.
Claim 8
Dependent Claim 20 words
The method of claim 1 wherein the step of utilizing said data includes the step of controlling connection fabrication apparatus.
Claim 9
Dependent Claim 26 words
The method of claim 1 wherein said costs relate to path shape complexity and path position with respect to other paths and component on said grid.
Claim 10
Independent Claim 343 words
A method of establishing a plurality of connections, using global routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, wherein said connections are formed from substantially I, L, Z and U-shaped paths comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c) and removing from said grid the path assigned to said selected connection; (e) calculating said penalty function for each of the substantially I, L, Z, and U-shaped paths which joins the two pins of said selected connection and whose length does not exceed a specified value; (f) assigning a non-negative, numerical weight to each of said paths, the weight depending upon the value of the penalty function, and decreasing as the value of the penalty function increases; (g) selecting a path from among said paths, with a probability proportional to said weight; (h) assigning said selected path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been routed thereby completing a pass; (j) generating data describing X, Y and Z coordinates of the paths assigned to said routed connections; (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 11
Independent Claim 343 words
A method of establishing a plurality of connections, using global routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, wherein said connections are formed from substantially I, L, Z and U-shaped paths comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c) and removing from said grid the path assigned to said selected connection; (e) calculating said penalty function for each of the substantially I, L, Z, and U-shaped paths which joins the two pins of said selected connection and whose length does not exceed a specified value; (f) assigning a non-negative, numerical weight to each of said paths, the weight depending upon the value of the penalty function, and decreasing as the value of the penalty function increases; (g) selecting a path from among said paths, with a probability proportional to said weight; (h) assigning said selected path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been routed thereby completing a pass; (j) generating data describing X, Y and Z coordinates of the paths assigned to said routed connections; (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 12
Dependent Claim 18 words
The method of claim 9 wherein the step of utilizing said data includes the step of generating artwork.
Claim 13
Dependent Claim 20 words
The method of claim 9 wherein the step of utilizing said data includes the step of controlling connection fabrication apparatus.
Claim 14
Independent Claim 274 words
A method of establishing a plurality of connections, using global routing techniques on a data processing machine, each connection join two pins using links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c) and removing from said grid the path assigned to said connection; (e) using a mazerouter procedure to calculate a path having a penalty function of smallest value, which joins the two pins of said selected connection; (f) assigning said calculated path to said selected connection; (g) repeating steps (d) through (f) above until a desired number of connections have been routed thereby completing a pass; (h) generating data describing X, Y and Z coordinates of the paths assigned to said routed connections; (i) repeating steps (c) through (h) above until a desired number of passes have been completed; and (j) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 15
Independent Claim 274 words
A method of establishing a plurality of connections, using global routing techniques on a data processing machine, each connection join two pins using links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c) and removing from said grid the path assigned to said connection; (e) using a mazerouter procedure to calculate a path having a penalty function of smallest value, which joins the two pins of said selected connection; (f) assigning said calculated path to said selected connection; (g) repeating steps (d) through (f) above until a desired number of connections have been routed thereby completing a pass; (h) generating data describing X, Y and Z coordinates of the paths assigned to said routed connections; (i) repeating steps (c) through (h) above until a desired number of passes have been completed; and (j) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 16
Dependent Claim 15 words
The method of claim 12 wherein the costs vary as a function of node location.
Claim 17
Dependent Claim 18 words
The method of claim 12 wherein the costs vary as a function of which connection is being routed.
Claim 18
Dependent Claim 18 words
The method of claim 12 wherein the step of utilizing said data includes the step of generating artwork.
Claim 19
Dependent Claim 20 words
The method of claim 12 wherein the step of utilizing said data includes the step of controlling connection fabrication apparatus.
Claim 20
Dependent Claim 127 words
The method of claim 12 wherein the mazerouter procedure at a given execution of step (e) comprises the following additional steps: (e)(1) calculating a lowest cost routing using one value of a penalty parameter; (e)(2) incrementing or decrementing the value of said penalty parameter to generate a new penalty parameter value if a property of the resulting routing has a value exceeding the upper limit of a user specified range of allowable values or is less than a minimum value of said user specified range, respectively; (e)(3) recalculating a lowest cost routing using said new penalty parameter value; and (e)(4) repeating the steps (e)(1) to (e)(3) a user specified number of times or until said property has a value within said user specified range, whichever occurs first.
Claim 21
Independent Claim 404 words
A method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c); (e) determining if said selected connection is to be rerouted; (f) removing from said grid the path assigned to said selected connection to be rerouted; (g) rerouting said selected connection using a mazerouter procedure to calculate a path having a penalty function of smallest value; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing a pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; and (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) establishing said plurality of connections corresponding to said data.
Claim 22
Independent Claim 404 words
A method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c); (e) determining if said selected connection is to be rerouted; (f) removing from said grid the path assigned to said selected connection to be rerouted; (g) rerouting said selected connection using a mazerouter procedure to calculate a path having a penalty function of smallest value; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing a pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; and (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) establishing said plurality of connections corresponding to said data.
Claim 23
Dependent Claim 20 words
The method of claim 18 wherein costs (Wx) and (Wy) vary as a function of link location on the grid.
Claim 24
Dependent Claim 19 words
The method of claim 18 wherein the cost (OVER) varies as a function of node location on the grid.
Claim 25
Dependent Claim 23 words
The method of claim 18 wherein the cost (OVER) varies as a function of the locations of other path crossings on the grid.
Claim 26
Dependent Claim 20 words
The method of claim 18 where one or more costs vary as a function of which connection is being routed.
Claim 27
Dependent Claim 31 words
The method of claim 18 wherein the costs (Wx) and (Wy) are chosen to be substantially equal to each other for one or more planes and for one or more passes.
Claim 28
Dependent Claim 69 words
The method of claim 18 wherein the step for defining each penalty function includes the further step of categorizing certain costs as (COST ILLEGAL) and certain other costs as (COST LEGAL) and varying the relative values of said costs such that the ratio (COST ILLEGAL)/(COST LEGAL) increases for a first series of passes, decreases for a next series of passes, and increases again for a final series of passes.
Claim 29
Dependent Claim 127 words
The method of claim 18 wherein the mazerouter procedure at a given execution of step (g) comprises the following additional steps: (g)(1) calculating a lowest cost routing using one value of a penalty parameter; (g)(2) incrementing or decrementing the value of said penalty parameter to generate a new penalty parameter value if a property of the resulting routing has a value exceeding the upper limit of a user specified range of allowable values or is less than a minimum value of said user specified range, respectively; (g)(3) recalculating a lowest cost routing using said new penalty parameter value; and (g)(4) repeating the steps (g)(1) to (g)(3) a user specified number of times or until said property has a value within said user specified range, whichever occurs first.
Claim 30
Independent Claim 466 words
A method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, connection listings and information related to one or more connections pertaining to a perimeter of a swath within which the connection preferentially is to be routed; (b) randomly assigning an initial path for each connection on said grid for which no perimeter information has been provided, using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in an x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; and a cost (BORDER) for each link that the path uses outside said perimeter; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c); (e) determining if said selected connection is to be routed during this pass; (f) removing from said detailed grid, the path assigned to said selected connection to be routed if said connection has been previously routed; (g) using a mazerouter procedure to calculate a path having a penalty function of smallest value, which joins the two pins of said selected connection; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing this pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) utilizing said data to establish said plurality of connections using said data.
Claim 31
Independent Claim 466 words
A method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, connection listings and information related to one or more connections pertaining to a perimeter of a swath within which the connection preferentially is to be routed; (b) randomly assigning an initial path for each connection on said grid for which no perimeter information has been provided, using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in an x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; and a cost (BORDER) for each link that the path uses outside said perimeter; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c); (e) determining if said selected connection is to be routed during this pass; (f) removing from said detailed grid, the path assigned to said selected connection to be routed if said connection has been previously routed; (g) using a mazerouter procedure to calculate a path having a penalty function of smallest value, which joins the two pins of said selected connection; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing this pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) utilizing said data to establish said plurality of connections using said data.
Claim 32
Dependent Claim 18 words
The method of claim 26 wherein the step of utilizing said data includes the step of generating artwork.
Claim 33
Dependent Claim 20 words
The method of claim 26 wherein the step of utilizing said data includes the step of controlling connection fabrication apparatus.
Claim 34
Dependent Claim 124 words
The method of claim 26 wherein the mazerouter procedure at a give execution of step (g) comprises the following additional steps: (g)(1) calculating a lowest cost routing using one value of a penalty parameter; (g)(2) incrementing or decrementing the value of said penalty parameter to generate a new penalty parameter value if a property of the resulting routing has a value exceeding the upper limit of a user specified range of allowable values or is less than a minimum value of said user specified range, respectively; (g)(3) recalculating a lowest cost routing using said new penalty parameter value; and (g)(4) repeating steps (g)(1)-(g)(3) a user specified number of times or until said property has a value within said user specified range, whichever occurs first.
Claim 35
Independent Claim 386 words
A method of establishing a plurality of routed jobs, using detailed routing techniques on a data processing machine, wherein each job is defined to be (i) a pair of pins, (ii) a pin and a path, or (iii) two paths; each job using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and a job list and a job priority list which identifies a specific order for routing said jobs; (b) beginning a pass through said jobs by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in an x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same or adjacent planes; (c) selecting one of said jobs which has not been considered previously during this pass, according to said job priority list; (d) determining if said selected job is to be routed during this pass; (e) removing from said grid the path assigned to said selected job to be routed, if said selected job has been routed previously; (f) routing said selected job using a mazerouter procedure to calculate a path having a penalty function of smallest value; (g) repeating steps (c) through (f) above until a desired number of jobs have been selected thereby completing this pass; (h) generating data describing x, y, z coordinates of the paths assigned to said plurality of jobs; (i) repeating steps (b) through (h) above until a desired number of passes have been completed; and (j) utilizing said data to establish said plurality of routed jobs corresponding to said data.
Claim 36
Independent Claim 386 words
A method of establishing a plurality of routed jobs, using detailed routing techniques on a data processing machine, wherein each job is defined to be (i) a pair of pins, (ii) a pin and a path, or (iii) two paths; each job using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and a job list and a job priority list which identifies a specific order for routing said jobs; (b) beginning a pass through said jobs by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in an x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same or adjacent planes; (c) selecting one of said jobs which has not been considered previously during this pass, according to said job priority list; (d) determining if said selected job is to be routed during this pass; (e) removing from said grid the path assigned to said selected job to be routed, if said selected job has been routed previously; (f) routing said selected job using a mazerouter procedure to calculate a path having a penalty function of smallest value; (g) repeating steps (c) through (f) above until a desired number of jobs have been selected thereby completing this pass; (h) generating data describing x, y, z coordinates of the paths assigned to said plurality of jobs; (i) repeating steps (b) through (h) above until a desired number of passes have been completed; and (j) utilizing said data to establish said plurality of routed jobs corresponding to said data.
Claim 37
Dependent Claim 18 words
The method of claim 30 wherein the step of utilizing said data includes the step of generating artwork.
Claim 38
Dependent Claim 20 words
The method of claim 30 wherein the step of utilizing said data includes the step of controlling connection fabrication apparatus.
Claim 39
Dependent Claim 124 words
The method of claim 30 wherein the mazerouter procedure at a given execution of step (f) comprises the following additional steps: (f)(1) calculating a lowest cost routing using one value of a penalty parameter; (f)(2) incrementing or decrementing the value of said penalty parameter to generate a new penalty parameter value if a property of the resulting routing has a value exceeding the upper limit of a user specified range of allowable values or is less than a minimum value of said user specified range, respectively; (f)(3) recalculating a lowest cost routing using said new penalty parameter value; and (f)(4) repeating steps (f)(1)-(f)(3) a user specified number of times or until said property has a value within said user specified range, whichever occurs first.
Claim 40
Independent Claim 551 words
A method of establishing a plurality of connections, using global and detailed routing techniques on a data processing machine, each connection joining two pins, using a global grid comprising links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, and a detailed grid comprising links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings including global and detailed grid positions of said pins; (b) randomly assigning an initial path for each connection on said global grid using a randomly oriented, substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a global routing pass through said connections by defining a penalty function in terms of specified costs wherein said costs are real numbers; (d) selecting one of said connections which has not been considered previously during this global pass, and removing from said global grid the path assigned to said selected connection; (e) calculating said penalty function for each substantially I, L, Z and U-shaped path which joins the two pins of said selected connection, and whose length does not exceed a specified value; (f) selecting one of said paths based on the value of said penalty function; (g) assigning said selected path to said selected connection; (h) repeating steps (d) through (g) above until a desired number of connections have been rerouted thereby completing one global routing pass; (i) generating data describing X, Y and Z coordinates of the paths assigned to said plurality of connections; (j) repeating steps (c) through (i) above until a desired number of global passes have been completed; (k) assuming, for each connection, a global swath comprising those global cells through which said connection has been globally routed; (l) beginning a detailed routing pass through said connections by defining said penalty function in terms of specified costs wherein said costs are nonnegative, real numbers; (m) selecting one of said connections which has not been considered previously during this detailed routing pass; (n) removing from said detailed grid, the path assigned to said connection to be routed selected in step (m), if said connection selected in step (m) has been routed previously on the detailed grid; (o) routing said connection selected in step (m) using a mazerouter procedure to calculate a path having a penalty function of smallest value which joins the two pins of said connection selected in step (m) on said detailed grid; (p) assigning said calculated path to said connection selected in step (m); (g) repeating steps (m) through (p) above until a desired number of connections have been selected thereby completing a detailed routing pass; (r) generating data describing x, y and z coordinates of the paths assigned to said plurality of connections; and (s) repeating steps (l) through (r) above until a desired number of detailed routing passes have been completed; and (t) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 41
Independent Claim 551 words
A method of establishing a plurality of connections, using global and detailed routing techniques on a data processing machine, each connection joining two pins, using a global grid comprising links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, and a detailed grid comprising links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid specifications and connection listings including global and detailed grid positions of said pins; (b) randomly assigning an initial path for each connection on said global grid using a randomly oriented, substantially L-shaped path, unless said pins lie along the same X or Y coordinate in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a global routing pass through said connections by defining a penalty function in terms of specified costs wherein said costs are real numbers; (d) selecting one of said connections which has not been considered previously during this global pass, and removing from said global grid the path assigned to said selected connection; (e) calculating said penalty function for each substantially I, L, Z and U-shaped path which joins the two pins of said selected connection, and whose length does not exceed a specified value; (f) selecting one of said paths based on the value of said penalty function; (g) assigning said selected path to said selected connection; (h) repeating steps (d) through (g) above until a desired number of connections have been rerouted thereby completing one global routing pass; (i) generating data describing X, Y and Z coordinates of the paths assigned to said plurality of connections; (j) repeating steps (c) through (i) above until a desired number of global passes have been completed; (k) assuming, for each connection, a global swath comprising those global cells through which said connection has been globally routed; (l) beginning a detailed routing pass through said connections by defining said penalty function in terms of specified costs wherein said costs are nonnegative, real numbers; (m) selecting one of said connections which has not been considered previously during this detailed routing pass; (n) removing from said detailed grid, the path assigned to said connection to be routed selected in step (m), if said connection selected in step (m) has been routed previously on the detailed grid; (o) routing said connection selected in step (m) using a mazerouter procedure to calculate a path having a penalty function of smallest value which joins the two pins of said connection selected in step (m) on said detailed grid; (p) assigning said calculated path to said connection selected in step (m); (g) repeating steps (m) through (p) above until a desired number of connections have been selected thereby completing a detailed routing pass; (r) generating data describing x, y and z coordinates of the paths assigned to said plurality of connections; and (s) repeating steps (l) through (r) above until a desired number of detailed routing passes have been completed; and (t) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 42
Dependent Claim 15 words
The method of claim 34 wherein the costs vary as a function of node location.
Claim 43
Dependent Claim 18 words
The method of claim 34 wherein the costs vary as a function of which connection is being routed.
Claim 44
Dependent Claim 124 words
The method of claim 34 wherein the mazerouter procedure at a given execution of step (o) comprises the following additional steps: (o)(1) calculating a lowest cost routing using one value of a penalty parameter; (o)(2) incrementing or decrementing the value of said penalty parameter to generate a new penalty parameter value if a property of the resulting routing has a value exceeding the upper limit of a user specified range of allowable value or is less than a minimum value of said user specified range, respectively; (o)(3) recalculating a lowest cost routing using said new penalty parameter value; and (o)(4) repeating steps (o)(1)-(o)(3) a user specified number of times or until said property has a value within said user specified range, whichever occurs first.
Claim 45
Dependent Claim 417 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, said method comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; (d) selecting one of said connections which has not been considered previously during this pass through said connections begun in step (c); (e) determining if said selected connections is to be rerouted; (f) removing from said grid the path assigned to said selected connection to be rerouted; (g) rerouting said selected connection using a mazerouter procedure to calculate a path having a penalty function of smallest value; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing a pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; and (k) repeating steps (c) through (j) above until a desired number of passes have been completed; (l) establishing said plurality of connections corresponding to said data.
Claim 46
Dependent Claim 417 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, said method comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and connection listings; (b) randomly assigning an initial path for each connection on said grid using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; (d) selecting one of said connections which has not been considered previously during this pass through said connections begun in step (c); (e) determining if said selected connections is to be rerouted; (f) removing from said grid the path assigned to said selected connection to be rerouted; (g) rerouting said selected connection using a mazerouter procedure to calculate a path having a penalty function of smallest value; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing a pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; and (k) repeating steps (c) through (j) above until a desired number of passes have been completed; (l) establishing said plurality of connections corresponding to said data.
Claim 47
Dependent Claim 484 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, said method comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and connection listings and information related to one or more connections pertaining to a perimeter of a swath within which the connection preferentially is to be routed; (b) randomly assigning an initial path for each connection on said grid for which no perimeter information has been provided, using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; and a cost (BORDER) for each link that the path uses outside said perimeter; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c); (e) determining if said selected connection is to be routed during this pass; (f) removing from said grid, the path assigned to said selected connection to be routed if said connection has been previously routed; (g) using a mazerouter procedure to calculate a path having a penalty function of smallest value, which joins the two pins of said selected connection; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing this pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) utilizing said data to establish said plurality of connections using said data.
Claim 48
Dependent Claim 484 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of connections, using detailed routing techniques on a data processing machine, each connection joining two pins using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, said method comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and connection listings and information related to one or more connections pertaining to a perimeter of a swath within which the connection preferentially is to be routed; (b) randomly assigning an initial path for each connection on said grid for which no perimeter information has been provided, using a randomly oriented substantially L-shaped path unless said pins lie along the same x or y coordinates in which an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a pass through said connections by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within user specified regions within one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same plane or adjacent planes; and a cost (BORDER) for each link that the path uses outside said perimeter; (d) selecting one of said connections which has not been considered previously during this pass through said connections which pass was initiated in step (c); (e) determining if said selected connection is to be routed during this pass; (f) removing from said grid, the path assigned to said selected connection to be routed if said connection has been previously routed; (g) using a mazerouter procedure to calculate a path having a penalty function of smallest value, which joins the two pins of said selected connection; (h) assigning said calculated path to said selected connection; (i) repeating steps (d) through (h) above until a desired number of connections have been selected thereby completing this pass; (j) generating data describing the x, y and z coordinates of the paths assigned to said routed connections; (k) repeating steps (c) through (j) above until a desired number of passes have been completed; and (l) utilizing said data to establish said plurality of connections using said data.
Claim 49
Dependent Claim 406 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of routed jobs, using detailed routing techniques on a data processing machine, wherein each job is defined to be (i) a pair of pins, (ii) a pin and a path, or (iii) two paths; each routed job using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, said method comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and a job list and a job priority list which identifies a specific order for routing said jobs; (b) beginning a pass through said jobs by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within specified regions within user one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same or adjacent planes; (c) selecting one of said jobs which has not been considered previously during this pass, according to said job priority list; (d) determining if said selected job is to be routed during this pass; (e) removing from said grid the path assigned to said selected job to be routed, if said selected job has been routed previously; (f) routing said selected job using a mazerouter procedure to calculate a path having a penalty function of smallest value; (g) repeating steps (c) through (f) above until a desired number of jobs have been selected thereby completing this pass; (h) generating data describing the x, y and z coordinates of the paths assigned to said plurality of jobs; (i) repeating steps (b) through (h) above until a desired number of passes have been completed; and (j) utilizing said data to establishing said plurality of routed jobs corresponding to said data.
Claim 50
Dependent Claim 406 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of routed jobs, using detailed routing techniques on a data processing machine, wherein each job is defined to be (i) a pair of pins, (ii) a pin and a path, or (iii) two paths; each routed job using links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, said method comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications, such as blockage and via locations, and a job list and a job priority list which identifies a specific order for routing said jobs; (b) beginning a pass through said jobs by defining a penalty function in terms of specified costs constituting non-negative numbers wherein said costs include: a cost (Wx) per link of path in a x direction; a cost (Wy) per link of path in a y direction; a cost (OVER) for using a node already used by another path or occupied by a blockage; a cost (BEND) for each path bend; a cost (VIA) for each via used; a cost (VIAOVER) for using a via already occupied by another path; a cost (REGION) for each link that the path uses within specified regions within user one or more of said planes; a cost (ADJAC) for each link that the path uses, which link lies adjacent to another path within the same or adjacent planes; (c) selecting one of said jobs which has not been considered previously during this pass, according to said job priority list; (d) determining if said selected job is to be routed during this pass; (e) removing from said grid the path assigned to said selected job to be routed, if said selected job has been routed previously; (f) routing said selected job using a mazerouter procedure to calculate a path having a penalty function of smallest value; (g) repeating steps (c) through (f) above until a desired number of jobs have been selected thereby completing this pass; (h) generating data describing the x, y and z coordinates of the paths assigned to said plurality of jobs; (i) repeating steps (b) through (h) above until a desired number of passes have been completed; and (j) utilizing said data to establishing said plurality of routed jobs corresponding to said data.
Claim 51
Dependent Claim 569 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of connections, using global and detailed routing techniques on a data processing machine, each connection joining two pins, using a global grid comprising links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, and a detailed grid comprising links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications and connection listings including global and detailed grid positions of said pins; (b) randomly assigning an initial path for each connection on said global grid using a randomly oriented, substantially L-shaped path, unless said pins lie along the same X or Y coordinates in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a global routing pass through said connections by defining a penalty function in terms of specified costs wherein said costs are real numbers; (d) selecting one of said connections which has not been considered previously during this global pass, and removing from said global grid the path assigned to said selected connection; (e) calculating said penalty function for each substantially I, L, Z and U-shaped path which joins the two pins of said selected connection, and whose length does not exceed a specified value; (f) selecting one of said paths based on the value of said penalty function; (g) assigning said selected path to said selected connection; (h) repeating steps (d) through (g) above until a desired number of connections have been rerouted thereby completing one global routing pass; (i) generating data describing X, Y and Z coordinates of the paths assigned to said plurality of connections; (j) repeating steps (c) through (i) above until a desired number of global routing passes have been completed; (k) assuming, for each connection, a global swath comprising those global cells through which said connection has been globally routed; (l) beginning a detailed routing pass through said connections by defining said penalty function in terms of specified costs wherein said costs are non-negative, real numbers; (m) selecting one of said connections which has not been considered previously during this detailed routing pass; (n) removing from said detailed grid, the path assigned to said connection to be routed selected in step (m), if said connection selected in step (m) has been routed previously on the detailed grid; (o) routing said removed connection selected in step (m) using a mazerouter procedure to calculate a path having a penalty function of smallest value which joins the two pins of said connection selected in step (m) on said detailed grid; (p) assigning said calculated path to said connection selected in step (m); (g) repeating steps (m) through (p) above until a desired number of connections have been selected thereby completing a detailed routing pass; (r) generating data describing x, y and z coordinates of the paths assigned to said plurality of connections; and (s) repeating steps (l) through (r) above until a desired number of detailed routing passes have been completed; and (t) utilizing said data to establish said plurality of connections corresponding to said data.
Claim 52
Dependent Claim 569 words
A circuit board wherein a plurality of connections are formed between specified pins according to the method of establishing a plurality of connections, using global and detailed routing techniques on a data processing machine, each connection joining two pins, using a global grid comprising links arranged between nodes in a rectangular grid having X and Y coordinates in one or more planes labelled by a Z coordinate, and a detailed grid comprising links arranged between nodes in a rectangular grid having x and y coordinates in one or more planes labelled by a z coordinate, comprising the steps of: (a) inputting information to said data processing machine pertaining to grid model specifications and connection listings including global and detailed grid positions of said pins; (b) randomly assigning an initial path for each connection on said global grid using a randomly oriented, substantially L-shaped path, unless said pins lie along the same X or Y coordinates in which case an I-shaped path is used, and randomly assigning each of said initial paths to one of said one or more planes; (c) beginning a global routing pass through said connections by defining a penalty function in terms of specified costs wherein said costs are real numbers; (d) selecting one of said connections which has not been considered previously during this global pass, and removing from said global grid the path assigned to said selected connection; (e) calculating said penalty function for each substantially I, L, Z and U-shaped path which joins the two pins of said selected connection, and whose length does not exceed a specified value; (f) selecting one of said paths based on the value of said penalty function; (g) assigning said selected path to said selected connection; (h) repeating steps (d) through (g) above until a desired number of connections have been rerouted thereby completing one global routing pass; (i) generating data describing X, Y and Z coordinates of the paths assigned to said plurality of connections; (j) repeating steps (c) through (i) above until a desired number of global routing passes have been completed; (k) assuming, for each connection, a global swath comprising those global cells through which said connection has been globally routed; (l) beginning a detailed routing pass through said connections by defining said penalty function in terms of specified costs wherein said costs are non-negative, real numbers; (m) selecting one of said connections which has not been considered previously during this detailed routing pass; (n) removing from said detailed grid, the path assigned to said connection to be routed selected in step (m), if said connection selected in step (m) has been routed previously on the detailed grid; (o) routing said removed connection selected in step (m) using a mazerouter procedure to calculate a path having a penalty function of smallest value which joins the two pins of said connection selected in step (m) on said detailed grid; (p) assigning said calculated path to said connection selected in step (m); (g) repeating steps (m) through (p) above until a desired number of connections have been selected thereby completing a detailed routing pass; (r) generating data describing x, y and z coordinates of the paths assigned to said plurality of connections; and (s) repeating steps (l) through (r) above until a desired number of detailed routing passes have been completed; and (t) utilizing said data to establish said plurality of connections corresponding to said data.

References Cited (Backward Citations)

US3654615A Cited
US3603771A Cited
US3653072A Cited
US3653071A Cited
US3681782A Cited
US4093990A Cited
US4495559A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-09-29 1990-03-31 1990-09-30 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-09-29 1994-03-31 1994-09-30 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-09-29 1998-03-31 1998-09-30 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag