US4986352A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Intermittent steam injection
Assignee: Mobil Oil AS
•
Filing: 1989-09-28
•
Granted: 1991-01-22
•
Expires: 2009-09-28
Abstract
Abstract A method for intermittent steam injection which comprises completing wells in more than one zone and selecting a number of wells as steam injectors. As interwell communication (temperature breakthrough) develops, producers are shut-in to allow for the reservoir pressure to build up and heat to propagate from the channel of communication (e.g., fractures) to the reservoir matrix. The injection phase is followed by blowdown. Thereafter, shut in producers and, in certain other cases, injectors are put on production.
Inventors
- 👤 Bassem R. Alameddine
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 20:03
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/30; E21B43/16; E21B43/24
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
127 words
A method to improve vertical sweep efficiency during intermittent steam injection into a multi-layered oil containing reservoir comprising: a. injecting a substantially large volume of steam into said reservoir via at least one injector well into a lower level of said reservoir while at least one producer well is shut in which pressurizes the reservoir and propagates heat away from any induced fracture; b. allowing the reservoir pressure to increase as steam injection continues until steam has entered each layer of the reservoir; c. shutting in the injector well and allowing each layer of the reservoir to heat up so as to reduce the viscosity of oil contained in each layer; and d. opening the producer well and producing oil to the surface thereby completing one cycle.
Claim 2
Independent Claim
127 words
A method to improve vertical sweep efficiency during intermittent steam injection into a multi-layered oil containing reservoir comprising: a. injecting a substantially large volume of steam into said reservoir via at least one injector well into a lower level of said reservoir while at least one producer well is shut in which pressurizes the reservoir and propagates heat away from any induced fracture; b. allowing the reservoir pressure to increase as steam injection continues until steam has entered each layer of the reservoir; c. shutting in the injector well and allowing each layer of the reservoir to heat up so as to reduce the viscosity of oil contained in each layer; and d. opening the producer well and producing oil to the surface thereby completing one cycle.
Claim 3
Dependent Claim
20 words
The method as recited in claim 1 where after step (d), steps (a) through (d) are repeated for eight cycles.
Claim 4
Dependent Claim
30 words
The method as recited in claim 1 where the volume of steam injected is increased during each subsequent cycle which results in deeper contact of the reservoir matrix by steam.
Claim 5
Dependent Claim
25 words
The method as recited in claim 1 were oil is produced from the formation for about 200 to 300 days before commencing another injection cycle.
Claim 6
Dependent Claim
23 words
The method as recited in claim 1 where initially steam comprising over 10% of the reservoir's pore volume is injected into the reservoir.
Claim 7
Dependent Claim
33 words
The method as recited in claim 1 where the injector well in step (d) is shut in for a desired time and thereafter oil is produced from both the injector and producer wells.
Claim 8
Dependent Claim
18 words
The method as recited in claim 1 where at least two injector and two producer wells are utilized.
Claim 9
Dependent Claim
53 words
The method as recited in claim 1 where after step (d), steps (a) through (d) are repeated for three cycles where the volume of steam injected is increased during each subsequent cycle and thereafter, steps (a) through (d) are repeated for four cycles during which the volume of steam injected is kept constant.
References Cited (Backward Citations)
CA733808A
Cited
US3332482A
Cited
US3796262A
Cited
US3771598A
Cited
US4130163A
Cited
US4182416A
Cited
US4257650A
Cited
US4271905A
Cited
US4262745A
Cited
US4445573A
Cited
US4612989A
Cited
US4635720A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1994-01-21 | 1994-07-23 | 1995-01-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1998-01-21 | 1998-07-23 | 1999-01-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2002-01-21 | 2002-07-23 | 2003-01-22 | $7700.00 | Window Closed / Lapsed |