← Back to Patent Explorer
US4612989A Expired / Lapsed US ⏱️ 0.0 years remaining

Combined replacement drive process for oil recovery

Assignee: ExxonMobil Upstream Research Co
•
Filing: 1985-06-03
•
Granted: 1986-09-23
•
Expires: 2005-06-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Performing steam drive operations in critical manipulative steps can improve the recovery of viscous hydrocarbons from tar sand deposits. Steam is injected into an injection well at a rate that is less than the rate needed to fracture the formation, and fluids are simultaneously produced from a communicating production well. When steam breakthrough occurs at the production well, the production well is shut-in, and the injection rate is increased to a rate at least sufficient to fracture the formation. After the reservoir is sufficiently heated, injection ceases and production resumes. Once the production rate declines to a rate that is no longer efficient, the process can be repeated.

Inventors

  • 👤 Alec Rakach
  • 👤 Caurino C. Bombardieri

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 20:46
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/2405

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 159 words
In a process for recovering hydrocarbons from a subterranean hydrocarbon-bearing formation which is penetrated by at least one injection well and at least one production well wherein a heated fluid is injected into said hydrocarbon formation through said injection well and fluids are produced from said production well, the improvement which comprises the following sequence of steps: (a) injecting said heated fluid through said injection well at a rate less than the rate needed to fracture said formation and producing fluids from said production well until said heated fluid breaks through to said production well; (b) shutting in said production well after said heated fluid from said injection well breaks through to said production well; (c) injecting heated fluid into said injection well at a rate at least sufficient to fracture said formation; (d) ceasing injection of said heated fluid after said formation is suitably heated; and (e) opening said production well and producing hydrocarbons from said production well.
Claim 2
Dependent Claim 159 words
In a process for recovering hydrocarbons from a subterranean hydrocarbon-bearing formation which is penetrated by at least one injection well and at least one production well wherein a heated fluid is injected into said hydrocarbon formation through said injection well and fluids are produced from said production well, the improvement which comprises the following sequence of steps: (a) injecting said heated fluid through said injection well at a rate less than the rate needed to fracture said formation and producing fluids from said production well until said heated fluid breaks through to said production well; (b) shutting in said production well after said heated fluid from said injection well breaks through to said production well; (c) injecting heated fluid into said injection well at a rate at least sufficient to fracture said formation; (d) ceasing injection of said heated fluid after said formation is suitably heated; and (e) opening said production well and producing hydrocarbons from said production well.
Claim 3
Dependent Claim 28 words
A process as described in claim 1 further comprising ceasing production at said production well when the production rate adversely declines and repeating steps (c), (d) and (e).
Claim 4
Dependent Claim 31 words
A process as described in claim 1 wherein said formation is heated radially from about 10 feet and to about 150 feet from such wellbore while said production well is shut-in.
Claim 5
Dependent Claim 13 words
A process as described in claim 1 wherein said heated fluid is steam.
Claim 6
Dependent Claim 21 words
A process as described in claim 4 wherein said steam ranges in temperature from about 465° F. to about 600° F.
Claim 7
Dependent Claim 26 words
A process as described in claim 4 wherein the injection rate during step (c) is from about 5000 to about 25,000 pounds of steam per hour.
Claim 8
Dependent Claim 24 words
A process as described in claim 4 wherein the amount of steam injected during step (c) is from about 30,000 to about 60,000 barrels.
Claim 9
Dependent Claim 172 words
In a process for recovering hydrocarbons from a subterranean hydrocarbon-bearing formation which is penetrated by at least one injection well and at least one production well wherein steam is injected into said hydrocarbon formation through said injection well and fluids are produced from said production well, the improvement which comprises the following sequence of steps: (a) injecting said steam through said injection well at a rate less than the rate needed to fracture said formation and producing fluids from said production well until said steam breaks through to said production well; (b) shutting in said production well after said steam from said injection well breaks through to said production well; (c) injecting steam into said injection well at a rate at least sufficient to fracture said formation; (d) ceasing injection of said steam after said formation is suitably heated; (e) opening said production well and producing hydrocarbons from said production well; and (f) ceasing production at said production well when the production rate adversely declines and repeating steps (c), (d) and (e).
Claim 10
Dependent Claim 172 words
In a process for recovering hydrocarbons from a subterranean hydrocarbon-bearing formation which is penetrated by at least one injection well and at least one production well wherein steam is injected into said hydrocarbon formation through said injection well and fluids are produced from said production well, the improvement which comprises the following sequence of steps: (a) injecting said steam through said injection well at a rate less than the rate needed to fracture said formation and producing fluids from said production well until said steam breaks through to said production well; (b) shutting in said production well after said steam from said injection well breaks through to said production well; (c) injecting steam into said injection well at a rate at least sufficient to fracture said formation; (d) ceasing injection of said steam after said formation is suitably heated; (e) opening said production well and producing hydrocarbons from said production well; and (f) ceasing production at said production well when the production rate adversely declines and repeating steps (c), (d) and (e).
Claim 11
Dependent Claim 31 words
A process as described in claim 8 wherein said formation is heated radially from about 10 feet and to about 150 feet from such wellbore while said production well is shut-in.
Claim 12
Dependent Claim 21 words
A process as described in claim 8 wherein said steam ranges in temperature from about 465° F. to about 600° F.
Claim 13
Dependent Claim 26 words
A process as described in claim 8 wherein the injection rate during step (c) is from about 5000 to about 25,000 pounds of steam per hour.
Claim 14
Dependent Claim 24 words
A process as described in claim 8 wherein the amount of steam injected during step (c) is from about 30,000 to about 60,000 barrels.

References Cited (Backward Citations)

US3259186A Cited
US3280909A Cited
US3367419A Cited
US3354954A Cited
US3420298A Cited
US3796262A Cited
US3845817A Cited
US4121661A Cited
US4130163A Cited
US4182416A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-09-22 1990-03-24 1990-09-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-09-22 1994-03-24 1994-09-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-09-22 1998-03-24 1998-09-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag