Method and device for forming a fluid permeation control layer of the ground
Assignee: Individual
•
Filing: 1987-05-14
•
Granted: 1989-06-13
•
Expires: 2007-05-14
Abstract
Abstract There is provided a method for forming a subterranean fluid permeation control layer in an area of ground. The method comprises the steps of forming a first portion of a trench of a predetermined depth from the surface of the ground and sequentially widening the trench along one side of the previously formed trench while selectively, simultaneously applying a fluid permeation layer substantially along the bottom surface of the previously formed trench and while at least partly covering the layer with earth removed from the widened portion of the trench being formed until the entire area of the ground is covered. The invention also provides a device for carrying out this method.
Inventors
- 👤 Shlomo Pinto
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 08:24
CPC Classifications
A; A01; A01G; A01G25/00; E; E02; E02D; E02D19/00; E02D19/06; E02D19/12; E02D19/18; E02D31/00; E02D31/02; E02F; E02F3/00; E02F3/04; E02F3/76; E02F3/7663; E02F3/7668; E02F3/7695; E02F5/00; E02F5/02; E02F5/10; A01G25/003
Claims Analysis
Total Claims: 19
Claim 1
Independent Claim
163 words
A method for forming a subterranean fluid permeation control layer in an area of ground for controlling fluid passage therethrough, comprising the steps of: (a) forming a first portion of a trench of a predetermined depth from the surface of the ground; (b) widening said trench along one side thereof to form a widened portion; (c) applying a fluid permeation control layer substantially along the bottom surface of said first portion of said trench; (d) only partly covering said layer with earth removed from a widened portion of said trench such that at least the edge of said layer adjacent said one side of the trench remains uncovered; and (e) selectively repeating steps (b), (c) and (d) until the entire area of the ground is lined by the permeation control layer, wherein, in repeating step (c) a newly applied layer is applied along the bottom surface of an adjacent, previously widened portion of the trench, partly contacting and overlapping an adjoining applied layer.
Claim 2
Independent Claim
163 words
A method for forming a subterranean fluid permeation control layer in an area of ground for controlling fluid passage therethrough, comprising the steps of: (a) forming a first portion of a trench of a predetermined depth from the surface of the ground; (b) widening said trench along one side thereof to form a widened portion; (c) applying a fluid permeation control layer substantially along the bottom surface of said first portion of said trench; (d) only partly covering said layer with earth removed from a widened portion of said trench such that at least the edge of said layer adjacent said one side of the trench remains uncovered; and (e) selectively repeating steps (b), (c) and (d) until the entire area of the ground is lined by the permeation control layer, wherein, in repeating step (c) a newly applied layer is applied along the bottom surface of an adjacent, previously widened portion of the trench, partly contacting and overlapping an adjoining applied layer.
Claim 3
Dependent Claim
31 words
The method as claimed in claim 1 wherein said layer is a layer of sheet material which is applied on said bottom surface by rolling the same off a supply roll.
Claim 4
Dependent Claim
24 words
The method as claimed in claim 1 wherein said layer is formed by spraying fluid repellent material upon the bottom surface of said trench.
Claim 5
Dependent Claim
23 words
The method as claimed in claim 2 further comprising the step of causing the sheets adhere to each other along the overlapping area.
Claim 6
Dependent Claim
24 words
The method as claimed in claim 1 further comprising the step of smoothing the bottom surface of the trench prior to applying said layer.
Claim 7
Dependent Claim
29 words
The method as claimed in claim 2 further comprising the step of pressing said sheet material against the bottom of the trench after applying the same on the ground.
Claim 8
Dependent Claim
25 words
The method as claimed in claim 2 further comprising the step of securing at least portions of one of the sheet edges in the ground.
Claim 9
Independent Claim
138 words
A device for forming a subterranean fluid permeation control layer in an area of ground for controlling fluid passage therethrough, comprising: a chassis having a front and a rear end; earth digging means mounted on said chassis and associated with means for removing the dug-out earth from the ground to form a trench; powered conveying means mounted on said chassis for conveying said dug-out earth to a location laterally displaced from said earth digging means; and an applicator mounted on said chassis and arranged to apply a fluid permeation control layer substantially along the bottom surface of an initially formed or widened trench, laterally displaced from said earth digging means; said conveying means being constructed and arranged such that the dug-out earth from an adjacent trench covers only a part of said layer leaving an edge thereof uncovered.
Claim 10
Independent Claim
138 words
A device for forming a subterranean fluid permeation control layer in an area of ground for controlling fluid passage therethrough, comprising: a chassis having a front and a rear end; earth digging means mounted on said chassis and associated with means for removing the dug-out earth from the ground to form a trench; powered conveying means mounted on said chassis for conveying said dug-out earth to a location laterally displaced from said earth digging means; and an applicator mounted on said chassis and arranged to apply a fluid permeation control layer substantially along the bottom surface of an initially formed or widened trench, laterally displaced from said earth digging means; said conveying means being constructed and arranged such that the dug-out earth from an adjacent trench covers only a part of said layer leaving an edge thereof uncovered.
Claim 11
Dependent Claim
12 words
The device as claimed in claim 8 further comprising driving means therefor.
Claim 12
Dependent Claim
19 words
The device as claimed in claim 8 wherein said earth digging means includes a plough share and a scraper.
Claim 13
Dependent Claim
28 words
The device as claimed in claim 8 wherein said earth digging means includes at least one earth cutter angularly oriented with respect to the axis of said chassis.
Claim 14
Independent Claim
155 words
A device for forming a subterranean fluid permeation control layer in a area of ground for controlling fluid passage therethrough, comprising: a chassis having a front and a rear end; earth digging means mounted on said chassis and associated with means for removing the dug-out earth from the ground to form a trench; conveying means mounted on said chassis for conveying said dug-out earth to a location laterally displaced from said earth digging means; and an applicator mounted on said chassis and arranged to apply a fluid permeation control layer substantially along the bottom surface of an initially formed or widened trench, laterally displaced from said earth digging means; said conveying means being constructed and arranged such that the dug-out earth from an adjacent trench covers only a part of said layer leaving an edge thereof uncovered; and wherein said means for conveying said dug-out earth is an endless belt conveyor mounted across said chassis.
Claim 15
Independent Claim
155 words
A device for forming a subterranean fluid permeation control layer in a area of ground for controlling fluid passage therethrough, comprising: a chassis having a front and a rear end; earth digging means mounted on said chassis and associated with means for removing the dug-out earth from the ground to form a trench; conveying means mounted on said chassis for conveying said dug-out earth to a location laterally displaced from said earth digging means; and an applicator mounted on said chassis and arranged to apply a fluid permeation control layer substantially along the bottom surface of an initially formed or widened trench, laterally displaced from said earth digging means; said conveying means being constructed and arranged such that the dug-out earth from an adjacent trench covers only a part of said layer leaving an edge thereof uncovered; and wherein said means for conveying said dug-out earth is an endless belt conveyor mounted across said chassis.
Claim 16
Dependent Claim
29 words
The device as claimed in claim 12 wherein the lateral extension of the output end of said conveyor with respect to the major axis of the excavator, is adjustable.
Claim 17
Dependent Claim
37 words
The device as claimed in claim 8 wherein said applicator is a sheet strip applicator including a support for a supply roll and a framework for guiding and spreading said strip along the bottom of the trench.
Claim 18
Dependent Claim
20 words
The device as claimed in claim 14 further comprising means for effecting the joining of overlapping edges of said strips.
Claim 19
Dependent Claim
26 words
The device as claimed in claim 15 further comprising means for securing at least portions of one of the sheet strip longitudinal edges in the ground.
References Cited (Backward Citations)
US1803838A
Cited
US2158952A
Cited
GB711551A
Cited
GB869831A
Cited
DE1243111B
Cited
US3276208A
Cited
US3405528A
Cited
US3590588A
Cited
US3618329A
Cited
US3874182A
Cited
FR2199333A5
Cited
FR2232211A6
Cited
US4073152A
Cited
SU718530A1
Cited
IL51969A
Cited
SU819263A1
Cited
IL58712A
Cited
US4379655A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1992-06-12 | 1992-12-12 | 1993-06-13 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1996-06-12 | 1996-12-12 | 1997-06-13 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2000-06-12 | 2000-12-12 | 2001-06-13 | $7700.00 | Window Closed / Lapsed |