← Back to Patent Explorer
US3276208A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of forming a subterranean asphaltic water barrier

Assignee: Standard Oil Co
•
Filing: 1965-07-28
•
Granted: 1966-10-04
•
Expires: 1985-07-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 John A Bolt

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 03:28
CPC Classifications
E; E02; E02B; E02B13/00; E02D; E02D19/00; E02D19/06; E02D19/12; E02D19/16

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 149 words
THE METHOD OF FORMING A SUBTERRANEAN ASPHALTIC WATER BARRIER IN SITU IN A PRESELECTED SUBSURFACE STRATUM OF SOIL AND IN A PLANE SUBSTANTIALLY PARALLEL TO AND COEXTENSIVE WITH THE SOIL SURFACE, WHICH COMPRISES THE STEPS OF: (A) FORMING A TRANSLATING CAVITY IN A PRESELECTED SUBSURFACE STRATUM OF SOIL IN A PLANE SUBSTANTIALLY PARALLEL WITH THE SOIL SURFACE WITHOUT SIGNIFICANTLY PARALING THE STRUCTURE OF THE SOIL SURFACE, SAID CAVITY HAVING THE BOTTOM SURFACE THEREOF IN A PLANE SUBSTANTIALLY PARALLEL WITH THE SOIL SURFACE, (B) SPRAYING ONTO SAID BOTTOM SURFAFE AN AQUEOUS ASPHALTIC EMULSION WHICH QUICKLY BREAKS AND SETS TO FORM A CONTINUOUS WATER IMPERMEABLE FLEXIBLE ASPHALT MEMBRANE ON THE BOTTOM SURFACE OF SAID CAVITY PROIR TO CLOSING OF SAID CAVITY; AND (C) THEREAFTER CLOSING SAID CAVITY TO THEREBY FORM IN SAID SUBSURFACE STRATUM OF SOIL AN ASPHALTIC WATER BARRIER IN A PLANE SUBSTANTIALLY PARALLEL TO AND COEXTENSIVE WITH SOIL SURFACE.
Claim 2
Independent Claim 149 words
THE METHOD OF FORMING A SUBTERRANEAN ASPHALTIC WATER BARRIER IN SITU IN A PRESELECTED SUBSURFACE STRATUM OF SOIL AND IN A PLANE SUBSTANTIALLY PARALLEL TO AND COEXTENSIVE WITH THE SOIL SURFACE, WHICH COMPRISES THE STEPS OF: (A) FORMING A TRANSLATING CAVITY IN A PRESELECTED SUBSURFACE STRATUM OF SOIL IN A PLANE SUBSTANTIALLY PARALLEL WITH THE SOIL SURFACE WITHOUT SIGNIFICANTLY PARALING THE STRUCTURE OF THE SOIL SURFACE, SAID CAVITY HAVING THE BOTTOM SURFACE THEREOF IN A PLANE SUBSTANTIALLY PARALLEL WITH THE SOIL SURFACE, (B) SPRAYING ONTO SAID BOTTOM SURFAFE AN AQUEOUS ASPHALTIC EMULSION WHICH QUICKLY BREAKS AND SETS TO FORM A CONTINUOUS WATER IMPERMEABLE FLEXIBLE ASPHALT MEMBRANE ON THE BOTTOM SURFACE OF SAID CAVITY PROIR TO CLOSING OF SAID CAVITY; AND (C) THEREAFTER CLOSING SAID CAVITY TO THEREBY FORM IN SAID SUBSURFACE STRATUM OF SOIL AN ASPHALTIC WATER BARRIER IN A PLANE SUBSTANTIALLY PARALLEL TO AND COEXTENSIVE WITH SOIL SURFACE.

References Cited (Backward Citations)

US668362A Cited
US1006116A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-10-03 1970-04-04 1970-10-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-10-03 1974-04-04 1974-10-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-10-03 1978-04-04 1978-10-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag