Claims Analysis
Total Claims: 20
Claim 1
Independent Claim
149 words
A method of controlling a plurality of clocked loads controllable individually and independently of each other, more particularly electrical heating loads of an electric oven, for minimizing the demand on an alternating current mains due to switching transients, the loads being fed from a common phase of the alternating current mains and being switched on each time at the beginning of a clock period, the clock periods of the various loads being of the same length, the improvement comprising: sequentially connecting to the mains all loads neither switched off nor switched to full power in a switching cycle so as to be interlinked in time in such a manner that, when a preceding load is switched off, a next load is switched on, and starting again such as a switching cycle each time at the beginning of a common clock period independently of the length of the switching cycle.
Claim 2
Independent Claim
149 words
A method of controlling a plurality of clocked loads controllable individually and independently of each other, more particularly electrical heating loads of an electric oven, for minimizing the demand on an alternating current mains due to switching transients, the loads being fed from a common phase of the alternating current mains and being switched on each time at the beginning of a clock period, the clock periods of the various loads being of the same length, the improvement comprising: sequentially connecting to the mains all loads neither switched off nor switched to full power in a switching cycle so as to be interlinked in time in such a manner that, when a preceding load is switched off, a next load is switched on, and starting again such as a switching cycle each time at the beginning of a common clock period independently of the length of the switching cycle.
Claim 3
Dependent Claim
36 words
A method as claimed in claim 1, further comprising, varying the switching-on and switching-off times of the loads in the various switching cycles so that the loads, averaged over several clock periods, consume the desired power.
Claim 4
Dependent Claim
70 words
A method as claimed in claim 1 or 2, characterized in that sequence in which the loads are switched on in a switching cycle so as to be interlinked in time is chosen so that loads having a lower power consumption are switched at the beginning and at the end of the switching cycle and loads having a larger power consumption are switched in the middle of the switching cycle.
Claim 5
Dependent Claim
47 words
A method as claimed in claim 1 or 2, characterized in that the sequence in which the loads are switched on in a switching cycle so as to be interlinked in time is chosen so that the loads are switched in accordance with their uniformly increasing powers.
Claim 6
Dependent Claim
47 words
A method as claimed in claim 1 or 2, characterized in that the sequence in which the loads are switched on in a switching cycle so as to be interlinked in time is chosen so that the loads are switched in accordance with their uniformly decreasing powers.
Claim 7
Dependent Claim
43 words
A method as claimed in claim 1 or 2 further comprising, determining for the largest clocked individual load and the maximum permissible demand on the mains due to load variations, the smallest possible clock period to be used as a common clock period.
Claim 8
Dependent Claim
34 words
A method as claimed in claim 6, characterized in that the common clock period is chosen as small as possible with respect to the maximum permissible demand on the mains due to load variations.
Claim 9
Independent Claim
43 words
A method as claimed in claims 1 or 2 further comprising, calculating at the beginning of a first common clock period the switching-on and switching-off instants of the electrical loads in all switching cycles that may proceed simultaneously and switching the loads correspondingly.
Claim 10
Independent Claim
44 words
A method as claimed in claims 1 or 2, characterized in that the loads have different priorities and, when a maximum permissible overall load is exceeded, shortening the switching-on times of loads of lower priority such that the permissible overall load is not exceeded.
Claim 11
Independent Claim
28 words
A method as claimed in claims 1 or 2 further comprising, arranging in the forepart of the switching cycle the loads having a switching-on duration fluctuating only slightly.
Claim 12
Dependent Claim
41 words
A method as claimed in claim 3 further comprising: determining the shortest possible common clock period to be used in the case of the largest individual clocked load and the maximum permissible demand on the mains due to the load variations.
Claim 13
Independent Claim
34 words
A method as claimed in claims 1 or 2 wherein the common clock period is chosen as small as possible with respect to the maximum permissible demand on the mains due to load variations.
Claim 14
Dependent Claim
181 words
An electric heating apparatus for a plurality of clocked electric heating loads controllable individually and independently of each other, said apparatus comprising: relay means for selectively coupling said loads to a common phase of a source of AC supply voltage, a microprocessor for controlling the operation of said relay means so as to sequentially connect the loads to the AC supply voltage in a switching cycle in which the loads are interlinked in time so that when one load is switched off a next load is switched on, a switching cycle being started again each time at the beginning of a common clock period independently of the length of the switching cycle whereby the clock periods of the loads are all equal, and a keyboard connected to the microprocessor to supply thereto under user operation data related to the desired power levels of individual ones of the electric heating loads such that the time period a load is connected to the AC supply voltage varies with the power level of the load whereby the length of a switching cycle is variable.
Claim 15
Dependent Claim
181 words
An electric heating apparatus for a plurality of clocked electric heating loads controllable individually and independently of each other, said apparatus comprising: relay means for selectively coupling said loads to a common phase of a source of AC supply voltage, a microprocessor for controlling the operation of said relay means so as to sequentially connect the loads to the AC supply voltage in a switching cycle in which the loads are interlinked in time so that when one load is switched off a next load is switched on, a switching cycle being started again each time at the beginning of a common clock period independently of the length of the switching cycle whereby the clock periods of the loads are all equal, and a keyboard connected to the microprocessor to supply thereto under user operation data related to the desired power levels of individual ones of the electric heating loads such that the time period a load is connected to the AC supply voltage varies with the power level of the load whereby the length of a switching cycle is variable.
Claim 16
Dependent Claim
188 words
Apparatus for supplying power to a plurality of loads in sequence from a common source of AC supply voltage where the power to each load is selectable individually and independently of the other loads comprising: a plurality of controlled switching devices for coupling respective ones of said loads to said common source of AC supply voltage, means for operating said switching devices in sequence such that when a first load in the sequence is switched off a second load in the sequence is switched on and so on through a complete switching cycle, means for adjusting the length of time each switching device is switched on so that the on time of its respective load is determined by the desired power level individually set for such load and independent of the power level set for other loads in the sequence whereby a switching cycle is variable and is determined by the sum of the individual power levels set for the individual loads, and means for clocking said operating means to periodically start a new switching cycle independent of whether or not a preceding switching cycle has been completed.
Claim 17
Dependent Claim
188 words
Apparatus for supplying power to a plurality of loads in sequence from a common source of AC supply voltage where the power to each load is selectable individually and independently of the other loads comprising: a plurality of controlled switching devices for coupling respective ones of said loads to said common source of AC supply voltage, means for operating said switching devices in sequence such that when a first load in the sequence is switched off a second load in the sequence is switched on and so on through a complete switching cycle, means for adjusting the length of time each switching device is switched on so that the on time of its respective load is determined by the desired power level individually set for such load and independent of the power level set for other loads in the sequence whereby a switching cycle is variable and is determined by the sum of the individual power levels set for the individual loads, and means for clocking said operating means to periodically start a new switching cycle independent of whether or not a preceding switching cycle has been completed.
Claim 18
Dependent Claim
47 words
Apparatus as claimed in claim 14 wherein said operating means operates the switching devices so that only one switching device is switched on at any instant of time thereby to minimize transient loading on the common source of AC supply voltage due to switching of the loads.
Claim 19
Independent Claim
174 words
A method of sequentially applying power from a common source of AC supply voltage to a plurality of loads having power levels settable individually and independently of each other and in a manner so as to minimize transient loading on said common source of AC supply voltage, the method comprising: connecting the loads to the common source of AC supply voltage in sequence in a repetitive switching cycle such that when a first load in the sequence is switched off a second load is switched on and so on through each switching cycle, where each load is connected to the common source of AC supply voltage for a period of time determined by the desired power level set for such load and independent of power levels set for other ones of the loads whereby the length of the switching cycle is variable as a function of the individual power settings of the plurality of loads, and periodically starting a new switching cycle at regular time intervals independently of the length of the switching cycle.
Claim 20
Independent Claim
174 words
A method of sequentially applying power from a common source of AC supply voltage to a plurality of loads having power levels settable individually and independently of each other and in a manner so as to minimize transient loading on said common source of AC supply voltage, the method comprising: connecting the loads to the common source of AC supply voltage in sequence in a repetitive switching cycle such that when a first load in the sequence is switched off a second load is switched on and so on through each switching cycle, where each load is connected to the common source of AC supply voltage for a period of time determined by the desired power level set for such load and independent of power levels set for other ones of the loads whereby the length of the switching cycle is variable as a function of the individual power settings of the plurality of loads, and periodically starting a new switching cycle at regular time intervals independently of the length of the switching cycle.