Compressed air energy storage turbomachinery cycle with compression heat recovery, storage, steam generation and utilization during power generation
Assignee: UE&C URBAN SERVICES Corp
•
Filing: 1987-05-12
•
Granted: 1988-08-23
•
Expires: 2007-05-12
Abstract
Abstract A thermal energy peaking/intermediate power plant is disclosed having a compression mode in which thermal energy is produced and stored in a thermal energy storage device and an expansion mode in which such stored thermal energy is utilized to produce steam from water and inject such steam into a combustion process.
Inventors
- 👤 Michael Nakhamkin
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 02:25
CPC Classifications
F; F02; F02C; F02C7/00; F02C7/08; F01; F01K; F01K21/00; F01K21/04; F01K21/047; F02C6/00; F02C6/003; F02C6/14; F02C6/16; F02C7/12; F02C7/14; F02C7/141; F02C7/143; Y; Y02; Y02E; Y02E60/00; Y02E60/16
Claims Analysis
Total Claims: 22
Claim 1
Independent Claim
201 words
A Compressed Air Energy Storage (CAES) plant cycle which utilizes otherwise wasted compression heat by storing such heat in a thermal energy storage (TES) device for subsequent use for steam generation and injection into compressed air flow before entering a high pressure combustor which expands such compressed air to produce additional power, said cycle comprising the steps of: compressing a quantity of air in a low pressure compressor during an off-peak load period; partially extracting thermal energy from said compressed air thereby producing cooled compressed air; storing said extracted thermal energy in said thermal energy storage device; further compressing said cooled compressed air in a high pressure compressor; cooling said further compressed air output by said high pressure compressor in an aftercooler; storing said cooled further compressed air output by said aftercooler in an underground air storage during said off-peak load period; producing steam by heating water in said thermal energy storage device during a peak load period; injecting said steam into said compressed air flow before entering said high pressure combustor; combusting fuel in said high pressure combustor to produce a high temperature mixture of the products of said combustion and said steam; and expanding said mixture in a turbine.
Claim 2
Dependent Claim
201 words
A Compressed Air Energy Storage (CAES) plant cycle which utilizes otherwise wasted compression heat by storing such heat in a thermal energy storage (TES) device for subsequent use for steam generation and injection into compressed air flow before entering a high pressure combustor which expands such compressed air to produce additional power, said cycle comprising the steps of: compressing a quantity of air in a low pressure compressor during an off-peak load period; partially extracting thermal energy from said compressed air thereby producing cooled compressed air; storing said extracted thermal energy in said thermal energy storage device; further compressing said cooled compressed air in a high pressure compressor; cooling said further compressed air output by said high pressure compressor in an aftercooler; storing said cooled further compressed air output by said aftercooler in an underground air storage during said off-peak load period; producing steam by heating water in said thermal energy storage device during a peak load period; injecting said steam into said compressed air flow before entering said high pressure combustor; combusting fuel in said high pressure combustor to produce a high temperature mixture of the products of said combustion and said steam; and expanding said mixture in a turbine.
Claim 3
Dependent Claim
29 words
The method of claim 1 wherein said compressed air flow is preheated by a recuperator subsequent to leaving said air storage and prior to entering said high pressure combustor.
Claim 4
Dependent Claim
118 words
In a power plant of the type which by use of excess energy generated during off-peak load periods produces compressed air which is accumulated in a storage underground, the stored compressed air being withdrawn from said storage and delivered to a turbine during peak load periods for generation of additional energy, the improvement comprising: a thermal energy storage device; heat transfer means for withdrawing heat from a compressor portion of said power plant and transferring said heat to said thermal energy storage device during off-peak load periods; and supply means for supplying H 2 O heated by said thermal energy storage device to a combustor associated with a turbine portion of said power plant during peak load periods.
Claim 5
Dependent Claim
118 words
In a power plant of the type which by use of excess energy generated during off-peak load periods produces compressed air which is accumulated in a storage underground, the stored compressed air being withdrawn from said storage and delivered to a turbine during peak load periods for generation of additional energy, the improvement comprising: a thermal energy storage device; heat transfer means for withdrawing heat from a compressor portion of said power plant and transferring said heat to said thermal energy storage device during off-peak load periods; and supply means for supplying H 2 O heated by said thermal energy storage device to a combustor associated with a turbine portion of said power plant during peak load periods.
Claim 6
Dependent Claim
13 words
The power plant of claim 3 wherein said H 2 O is steam.
Claim 7
Dependent Claim
23 words
The power plant of claim 4 wherein said combustor combines a fuel, said steam and said compressed air for use in a turbine.
Claim 8
Dependent Claim
21 words
The power plant of claim 3 further comprising a heat recuperator to preheat said compressed air for use by said combustor.
Claim 9
Independent Claim
119 words
A method for generating peaking/intermediate electricity from expansion of compressed air comprising the steps: compressing a quantity of air during an off-peak load period; extracting thermal energy from said compressed air thereby producing cooled compressed air; storing said extracted thermal energy in a thermal energy storage device; storing said cooled compressed air in an air storage device during said off-peak load period; producing steam by heating water in said thermal energy device during a peak load period; injecting said steam into compressed air flow from said storage device before entering a combustor; combusting fuel in said combustor to produce a high temperature mixture of the products of said combustion and said steam; and expanding said mixture in a turbine.
Claim 10
Independent Claim
119 words
A method for generating peaking/intermediate electricity from expansion of compressed air comprising the steps: compressing a quantity of air during an off-peak load period; extracting thermal energy from said compressed air thereby producing cooled compressed air; storing said extracted thermal energy in a thermal energy storage device; storing said cooled compressed air in an air storage device during said off-peak load period; producing steam by heating water in said thermal energy device during a peak load period; injecting said steam into compressed air flow from said storage device before entering a combustor; combusting fuel in said combustor to produce a high temperature mixture of the products of said combustion and said steam; and expanding said mixture in a turbine.
Claim 11
Dependent Claim
28 words
The method of claim 7 wherein said compressed air flow is preheated by a recuperator subsequent to leaving said air storage device and prior to entering said combustor.
Claim 12
Dependent Claim
67 words
In a Compressed Air Energy Storage (CAES) system having a compression train and an expansion train, the improvement comprising the steps: extracting thermal energy from said compression train; storing said extracted thermal energy in a thermal energy storage device; producing steam for use in said expansion train by introducing water to said thermal energy storage device; and injecting said steam into a combustor of said expansion train.
Claim 13
Dependent Claim
67 words
In a Compressed Air Energy Storage (CAES) system having a compression train and an expansion train, the improvement comprising the steps: extracting thermal energy from said compression train; storing said extracted thermal energy in a thermal energy storage device; producing steam for use in said expansion train by introducing water to said thermal energy storage device; and injecting said steam into a combustor of said expansion train.
Claim 14
Dependent Claim
159 words
A Compressed Air Energy Storage (CAES) system comprising: an electrical machine for use as a motor during a compression mode and for use as a generator during an expansion mode; a compression train which compresses air and stores such compressed air in an air storage device during said compression mode, said compression train being selectively coupled to said motor by way of a first clutch means; a turbine train which expands said compressed air from said air storage device during said expansion mode, said turbine train being selectively coupled to said generator by way of a second clutch means; a thermal energy storage device for storing thermal energy; air flow piping for withdrawing heat from said compression train and transferring said heat to said thermal energy storage device during off-peak load periods; and supply means for supplying H 2 O heated by said thermal energy storage device to a combustor associated with said turbine train during peak load periods.
Claim 15
Dependent Claim
159 words
A Compressed Air Energy Storage (CAES) system comprising: an electrical machine for use as a motor during a compression mode and for use as a generator during an expansion mode; a compression train which compresses air and stores such compressed air in an air storage device during said compression mode, said compression train being selectively coupled to said motor by way of a first clutch means; a turbine train which expands said compressed air from said air storage device during said expansion mode, said turbine train being selectively coupled to said generator by way of a second clutch means; a thermal energy storage device for storing thermal energy; air flow piping for withdrawing heat from said compression train and transferring said heat to said thermal energy storage device during off-peak load periods; and supply means for supplying H 2 O heated by said thermal energy storage device to a combustor associated with said turbine train during peak load periods.
Claim 16
Dependent Claim
75 words
The CAES system of claim 10 wherein said compression train comprises: a low pressure compressor to initially compress ambient air to a first pressure level; and a high pressure compressor having an input connected to a compressed air output of said thermal energy storage device for further compressing air at said first pressure level to an increased second pressure level and subsequently storing such air at said second pressure level in said air storage device.
Claim 17
Dependent Claim
38 words
The CAES system of claim 11 wherein said air flow piping is connected to a compressed air output of said low pressure compressor and is also connected to a compressed air input of said thermal energy storage device.
Claim 18
Dependent Claim
21 words
The CAES system of claim 11 wherein said low pressure compressor has a higher compression ratio than said high pressure compressor.
Claim 19
Dependent Claim
16 words
The CAES system of claim 10 wherein said H 2 O is heated to generate steam.
Claim 20
Dependent Claim
27 words
The CAES system of claim 14 wherein said combuster burns a fuel in a mixture of said steam and said compressed air for use in a turbine.
Claim 21
Dependent Claim
21 words
The CAES system of claim 10 further comprising a heat recuperator to preheat said compressed air for use by said combustor.
Claim 22
Dependent Claim
41 words
The CAES system of claim 10 wherein said turbine train comprises: a high pressure turbine to initially expand compressed air from said air storage device; and a low pressure turbine to further expand compressed air output by said high pressure turbine.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-08-23 | 1992-02-22 | 1992-08-23 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-08-23 | 1996-02-22 | 1996-08-23 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-08-23 | 2000-02-22 | 2000-08-23 | $7700.00 | Window Closed / Lapsed |