← Back to Patent Explorer
US4275310A Expired / Lapsed US ⏱️ 0.0 years remaining

Peak power generation

Assignee: Individual
•
Filing: 1980-02-27
•
Granted: 1981-06-23
•
Expires: 2000-02-27
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Electric power is provided during periods of peak demand, employing a turbine generator facility activated by the expansion of compressed air, withdrawn from an underground air storage reservoir, in a substantially isothermal system. A generator system, which may comprise a steam boiler or a fuel gasifier, is employed for isothermal compression of air into reservoir storage during periods of low power demand.

Inventors

  • 👤 William A. Summers
  • 👤 Robert L. Longardner

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 15:56
CPC Classifications
F; F02; F02C; F02C6/00; F02C6/14; F02C6/16; F01; F01K; F01K21/00; F01K21/04; F05; F05D; F05D2260/00; F05D2260/20; F05D2260/211; Y; Y02; Y02E; Y02E60/00; Y02E60/16

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 235 words
A process for the generation of electric power during periods of peak power demand, employing a fuel gasification facility, turbine expanders, and an associated underground air storage reservoir, comprising the steps of: (a) compressing ambient air, by passage through at least one compressor stage, to a pressure greater than that maintained in the air storage reservoir, the compressor system of at least one compressor stage being driven at least in part by engagement with at least one turbine expander powered by a hot combustion gas mixture; (b) cooling the compressed air to substantially ambient temperature by heat exchange serially with air and water feed streams to the fuel gasification facility; (c) injecting the cooled, compressed air into the underground air storage reservoir through a first well system in communication therewith; (d) withdrawing stored, compressed air from the underground air storage reservoir through a second well system, responsive at least in part to a peak power demand; (e) commingling the withdrawn compressed air with fuel gas, from the fuel gasification facility, in a combustion zone to effect substantially complete combustion of the fuel gas; (f) generating electric power by passing the hot combustion gas mixture through at least one turbine expander in engagement with an electric power generation means; (g) discharging the expanded combustion gas to the atmosphere at substantially ambient temperature and pressure; and (h) delivering the generated electric power to a power supply system;
Claim 2
Dependent Claim 235 words
A process for the generation of electric power during periods of peak power demand, employing a fuel gasification facility, turbine expanders, and an associated underground air storage reservoir, comprising the steps of: (a) compressing ambient air, by passage through at least one compressor stage, to a pressure greater than that maintained in the air storage reservoir, the compressor system of at least one compressor stage being driven at least in part by engagement with at least one turbine expander powered by a hot combustion gas mixture; (b) cooling the compressed air to substantially ambient temperature by heat exchange serially with air and water feed streams to the fuel gasification facility; (c) injecting the cooled, compressed air into the underground air storage reservoir through a first well system in communication therewith; (d) withdrawing stored, compressed air from the underground air storage reservoir through a second well system, responsive at least in part to a peak power demand; (e) commingling the withdrawn compressed air with fuel gas, from the fuel gasification facility, in a combustion zone to effect substantially complete combustion of the fuel gas; (f) generating electric power by passing the hot combustion gas mixture through at least one turbine expander in engagement with an electric power generation means; (g) discharging the expanded combustion gas to the atmosphere at substantially ambient temperature and pressure; and (h) delivering the generated electric power to a power supply system;
Claim 3
Dependent Claim 43 words
The process of claim 1 wherein the underground air storage reservoir comprises an aquifer storage reservoir having a caprock impermeable to gas and containing air under a superatmospheric hydrostatic pressure within the range from about 200 to about 2,500 pounds per square inch.
Claim 4
Dependent Claim 23 words
The process of claim 2 wherein the hydrostatic pressure is within the range from about 250 to about 500 pounds per square inch.
Claim 5
Dependent Claim 32 words
The process of claim 2 wherein the air storage volume of the reservoir exceeds that required to afford peak power generation without substantial modification of the superatmospheric hydrostatic pressure of the reservoir.
Claim 6
Dependent Claim 58 words
The process of claim 1 wherein ambient air is compressed in two stages, effluent air from the first stage being cooled by indirect heat exchange with air feed to the fuel gasification facility and effluent air from the second stage being cooled to substantially ambient temperature by indirect heat exchange with water feed to the fuel gasification facility.
Claim 7
Dependent Claim 24 words
The process of claim 1 wherein water is removed from the cooled, compressed air prior to its injection into the underground air storage reservoir.
Claim 8
Dependent Claim 17 words
The process of claim 5 wherein water is removed from the effluent air after each cooling step.
Claim 9
Dependent Claim 16 words
The process of claim 1 wherein the fuel employed in the fuel gasification facility is coal.
Claim 10
Dependent Claim 20 words
The process of claim 1 wherein the hot combustion gas mixture is maintained rich in air when generating electric power.
Claim 11
Dependent Claim 25 words
The process of claim 1 wherein a common turbine expander is employed sequentially in the air compression step and in the electric power generation step.

References Cited (Backward Citations)

US3523192A Cited
US3831373A Cited
US3868817A Cited
US3939356A Cited
US3988897A Cited
US4150547A Cited
GB2000229A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-06-22 1984-12-22 1985-06-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-06-22 1988-12-22 1989-06-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-06-22 1992-12-22 1993-06-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag