Erosion control foundation mat and method
Assignee: Individual
•
Filing: 1985-01-17
•
Granted: 1987-09-01
•
Expires: 2005-01-17
Abstract
Abstract An erosion control structure and method involves placing a large permeable mat with peripheral weighted pockets around and attached to the mat on the bottom of the water body such that at least a portion of the mat extends into a shallow portion of the water body where currents have a velocity sufficient to erode the bottom. The peripheral pockets are filled with a weighted material, such as sand. Large weighted stabilizers are placed on the mat and positioned in the areas where the currents exceed the erosion velocity such that the stabilizers are below the surface of the water.
Inventors
- 👤 Dick L. Holmberg
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 16:41
CPC Classifications
E; E02; E02B; E02B3/00; E02B3/04; E02B3/12; E02B3/122; E02B3/127
Claims Analysis
Total Claims: 56
Claim 1
Independent Claim
236 words
A method of restoring coastal shoreline of a water body having a surface, a bottom with granular material on said bottom, and having erosion zones in which currents exceed an erosion velocity, comprising: providing a generally flat water permeable geotextile sheet having peripheral edges; forming peripheral pockets extending around said peripheral edges of said sheet and forming a plurality of spaced openings along said pockets such that said sheet is provided with a substantially flat central region intermediate said peripheral pockets; positioning said sheet at said shoreline so as to extend into said water body such that at least a portion of said sheet is positioned along said bottom where currents exceed said erosion velocity sufficient to entrain granular material on said bottom; filling said peripheral pockets with ballast material such that said peripheral pockets assume a downwardly oriented substantially vertical position in the granular material along said bottom; providing a flexible stabilizer chamber separable from said sheet; placing said stabilizer chamber on said substantially flat central region of said sheet with said peripheral pockets spaced from said stabilizer chamber and extending around said stabilizer chamber; and filling said stabilizer chamber with ballast material such that said stabilizer chamber extends upwardly in a low profile from said sheet into said currents, but at least a portion of said stabilizer chamber is disposed beneath said surface sufficient to permit water currents to pass over said stabilizer chamber.
Claim 2
Independent Claim
236 words
A method of restoring coastal shoreline of a water body having a surface, a bottom with granular material on said bottom, and having erosion zones in which currents exceed an erosion velocity, comprising: providing a generally flat water permeable geotextile sheet having peripheral edges; forming peripheral pockets extending around said peripheral edges of said sheet and forming a plurality of spaced openings along said pockets such that said sheet is provided with a substantially flat central region intermediate said peripheral pockets; positioning said sheet at said shoreline so as to extend into said water body such that at least a portion of said sheet is positioned along said bottom where currents exceed said erosion velocity sufficient to entrain granular material on said bottom; filling said peripheral pockets with ballast material such that said peripheral pockets assume a downwardly oriented substantially vertical position in the granular material along said bottom; providing a flexible stabilizer chamber separable from said sheet; placing said stabilizer chamber on said substantially flat central region of said sheet with said peripheral pockets spaced from said stabilizer chamber and extending around said stabilizer chamber; and filling said stabilizer chamber with ballast material such that said stabilizer chamber extends upwardly in a low profile from said sheet into said currents, but at least a portion of said stabilizer chamber is disposed beneath said surface sufficient to permit water currents to pass over said stabilizer chamber.
Claim 3
Dependent Claim
23 words
The shoreline restoration method of claim 1 which further comprises filling said central compartment with in situ granular material after positioning said sheet.
Claim 4
Dependent Claim
88 words
The shoreline restoration method of claim 1 wherein said sheet positioning step includes: rolling said sheet into a roll; positioning a pair of first cables as parallel guide cables along said bottom, said first cables each having first ends and second ends; anchoring said ends of said first cables; placing said rolled sheet between said first cables adjacent said first ends of said first cables; unrolling said rolled sheet between said first cables over said bottom; and temporarily fastening the edges of said sheet to said first cables.
Claim 5
Dependent Claim
128 words
The shoreline restoration method of claim 3 wherein: rolling said sheet further includes rolling said sheet onto an elongated member having a pair of ends, said sheet being rolled such that said elongated member ends are accessible from either end of said rolled sheet; providing a pair of second cables each having first ends and second ends; unrolling said sheet further comprises fastening said first ends of said second cables to said elongated member ends; providing pulley means near said second ends of said first cables; extending each of said second cables through one of said pulley means so that said second cables and said first cables are generally parallel to each other; and pulling said second cables so that said rolled sheet unrolls from said elongated member.
Claim 6
Dependent Claim
31 words
The method of claim 1, wherein: said stabilizer chamber placing step includes limiting the placing of said stabilizer chamber on said sheet to a single layer thereof placed on said sheet.
Claim 7
Independent Claim
189 words
A method of retarding shoreline erosion of a water body having a shoreline, a water surface, a bottom and an erosion zone in which currents exceed an erosion velocity, comprising: providing an elongated sheet of permeable fabric having a length substantially greater than the width thereof, said sheet having two opposite lengthwise edges; forming peripheral pockets along said lengthwise edges and attached to the periphery of said sheet; positioning said sheet such that at least a portion of said sheet extends along said bottom of said water body into a shallow region of said water body where currents have a velocity sufficient to erode said bottom; filling said peripheral pockets with weighted material; providing an elongated weighted stabilizer means having a length substantially greater than the width thereof; and positioning said weighted stabilizer means along a central region of said sheet to extend a majority of the length of said sheet, such that in a region of said erosion zone said stabilizer means project upwardly from said sheet but is disposed below the surface of the water, and is adapted to cause particulate accretion about said weighted stabilizer means.
Claim 8
Independent Claim
189 words
A method of retarding shoreline erosion of a water body having a shoreline, a water surface, a bottom and an erosion zone in which currents exceed an erosion velocity, comprising: providing an elongated sheet of permeable fabric having a length substantially greater than the width thereof, said sheet having two opposite lengthwise edges; forming peripheral pockets along said lengthwise edges and attached to the periphery of said sheet; positioning said sheet such that at least a portion of said sheet extends along said bottom of said water body into a shallow region of said water body where currents have a velocity sufficient to erode said bottom; filling said peripheral pockets with weighted material; providing an elongated weighted stabilizer means having a length substantially greater than the width thereof; and positioning said weighted stabilizer means along a central region of said sheet to extend a majority of the length of said sheet, such that in a region of said erosion zone said stabilizer means project upwardly from said sheet but is disposed below the surface of the water, and is adapted to cause particulate accretion about said weighted stabilizer means.
Claim 9
Dependent Claim
77 words
The method of claim 6 which further includes positioning said stabilizer means sufficiently below said water surface in said erosion zone such that said currents are forced upwardly over said weighted stabilizer means whereupon the velocity of said currents is reduced, and such that said currents do not reflect substantially downwardly toward said bottom to scour said bottom and do not reflect substantially away from said stabilizer means to carry particulate matter away from said erosion zone.
Claim 10
Dependent Claim
31 words
The method of claim 7 which further includes filling said peripheral pockets with weighted material having a weight of at least about 90 pounds per linear foot of said peripheral pockets.
Claim 11
Dependent Claim
34 words
The method of claim 6 which further includes forming said peripheral pockets by folding each edge of said sheet over on said sheet to form hems and fastening the folded edges in folded position.
Claim 12
Dependent Claim
69 words
The method of claim 9 wherein: said folding includes folding all said hems to the same side of said sheet and which further comprises forming a plurality of spaced openings along said fastening of said folded edges, said openings being formed on one side of said sheet, whereby said hems are provided with the ability to fill by themselves with granular material on the bottom of said water body.
Claim 13
Dependent Claim
32 words
The method of claim 10 wherein: said hems are fastened and said openings are formed by stitching said folded edges to said sheet while leaving spaced unstitched regions to create spaced openings.
Claim 14
Dependent Claim
21 words
The method of claim 11 which includes positioning said sheet on said bottom with said openings oriented upwardly from said bottom.
Claim 15
Dependent Claim
15 words
The method of claim 9 wherein: said peripheral pockets are filled with a cementitious material.
Claim 16
Dependent Claim
34 words
The method of claim 9 wherein: said pockets are filled with sand and which further includes liquifying sand on said bottom of said water body and injecting said liquified sand into said peripheral pockets.
Claim 17
Dependent Claim
30 words
The method of claim 6 wherein: said stabilizer means is provided by forming at least one compartment from a permeable flexible material and filling said compartment with a weighted material.
Claim 18
Dependent Claim
36 words
The method of claim 15 wherein: said sheet has a length, and said compartment is formed by disposing at least one elongated tubular central pocket on said sheet to extend substantially the length of said sheet.
Claim 19
Dependent Claim
14 words
The method of claim 16, wherein said compartment is filled with a cementitious material.
Claim 20
Dependent Claim
44 words
The method of claim 16 wherein: said sheet is a first sheet; said central pocket is formed by placing a second sheet of permeable material over said first sheet, and stitching said second sheet around its periphery to one side of said first sheet.
Claim 21
Dependent Claim
48 words
The method of claim 18 which further includes: stitching the center of said second sheet to the center of said first sheet by stitching a central stitch lengthwise down the middle of said two sheets, thereby forming two central compartments, one on either side of said central stitch.
Claim 22
Dependent Claim
13 words
The method of claim 19 wherein: said two compartments are filled with sand.
Claim 23
Dependent Claim
45 words
The method of claim 6 which further comprises: providing a plurality of structures each comprising said sheet having said peripheral pockets with said weighted stabilizer means on each said sheet; and positioning said plurality of said structures generally spaced from and parallel to one another.
Claim 24
Dependent Claim
21 words
The method of claim 21 wherein: said structures positioning step includes positioning said structures to extend generally perpendicular to said shoreline.
Claim 25
Dependent Claim
26 words
The method of claim 21 wherein: said structures positioning step includes positioning said structures to extend generally parallel to said shoreline and spaced from said shoreline.
Claim 26
Dependent Claim
229 words
An erosion control structure adapted to retard erosion along a body of water having a shoreline, a water surface, a bottom and an erosion zone in which currents have an erosion velocity, comprising: an elongated permeable fabric mat having a pair of longitudinal edges and having a pair of peripheral pockets extending along said longitudinal edges thereof, said peripheral pockets adapted to hold ballast material and anchor said mat in said bottom; stabilizer means comprising a flexible compartment having sides and a submergable end, said flexible compartment adapted to be filled with ballast material and positioned atop and extending upwardly from a medial region of said mat; said mat dimensioned to extend outwardly from said stabilizer means sides when said stabilizer means is positioned thereon, said mat spacing said peripheral pockets from said stabilizer means to provide a generally flat fabric section on each side of said stabilizer means, whereby said mat can be laid such that said mat extends along said bottom to said erosion zone whereat said currents exceed the erosion velocity and said stabilizer means placed atop said mat to project upwardly from a central region thereof, with said mat providing a supporting base wider than said stabilizer means when in a filled condition and disposing a region of said stabilizer means below said water surface causing soil particles to accumulate around said erosion control structure.
Claim 27
Dependent Claim
229 words
An erosion control structure adapted to retard erosion along a body of water having a shoreline, a water surface, a bottom and an erosion zone in which currents have an erosion velocity, comprising: an elongated permeable fabric mat having a pair of longitudinal edges and having a pair of peripheral pockets extending along said longitudinal edges thereof, said peripheral pockets adapted to hold ballast material and anchor said mat in said bottom; stabilizer means comprising a flexible compartment having sides and a submergable end, said flexible compartment adapted to be filled with ballast material and positioned atop and extending upwardly from a medial region of said mat; said mat dimensioned to extend outwardly from said stabilizer means sides when said stabilizer means is positioned thereon, said mat spacing said peripheral pockets from said stabilizer means to provide a generally flat fabric section on each side of said stabilizer means, whereby said mat can be laid such that said mat extends along said bottom to said erosion zone whereat said currents exceed the erosion velocity and said stabilizer means placed atop said mat to project upwardly from a central region thereof, with said mat providing a supporting base wider than said stabilizer means when in a filled condition and disposing a region of said stabilizer means below said water surface causing soil particles to accumulate around said erosion control structure.
Claim 28
Dependent Claim
32 words
The erosion control structure of claim 24 wherein: said peripheral pockets have a plurality of spaced openings which are adapted to be oriented upwardly when said mat is positioned along said bottom.
Claim 29
Dependent Claim
49 words
The erosion control structure as recited in claim 25 wherein: said mat has an upper surface; said peripheral pockets comprise a hem sewn along each said longitudinal edge of said mat by folding said edges over said mat and stitching said edges to said upper surface of said mat.
Claim 30
Dependent Claim
18 words
The erosion control structure of claim 26 wherein: said openings comprise spaced unstitched regions of said stitched edges.
Claim 31
Dependent Claim
45 words
The erosion control structure as recited in claim 27 wherein: said stabilizer means comprises an upper sheet having edges, said upper sheet secured around said upper sheet edges to said upper surface of said mat forming at least one compartment adapted to receive weighted material.
Claim 32
Dependent Claim
28 words
The erosion control structure as recited in claim 28 wherein said upper sheet is secured to said mat so as to form two compartments for receiving weighted material.
Claim 33
Dependent Claim
32 words
The erosion control structure as recited in claim 24 wherein: said stabilizer means comprises a plurality of bags made of a permeable material and adapted to be filled with a weighted material.
Claim 34
Dependent Claim
60 words
The erosion control structure of claim 24 wherein: said compartment includes at least one layered patch assembly comprising two patches placed one on the other on said compartment, and said patches fastened around the peripheries of said patches to said compartment, whereby slits can be cut through said patches and into said compartment for injecting weighted material into said compartment.
Claim 35
Dependent Claim
23 words
The erosion control structure of claim 24, wherein: said stabilizer means comprises an elongated tubular compartment extending substantially the length of said mat.
Claim 36
Dependent Claim
19 words
The erosion control structure of claim 32, wherein said stabilizer means is adapted to be filled with cementitious material.
Claim 37
Dependent Claim
32 words
The erosion control structure of claim 33, wherein: said mat has a length substantially greater than the width thereof; and said stabilizer means has a length substantially greater than the width thereof.
Claim 38
Dependent Claim
25 words
The erosion control structure of claim 24, wherein: said stabilizer means is limited to a single layer of said stabilizer means disposed on said mat.
Claim 39
Dependent Claim
25 words
The erosion control structure of claim 35, wherein: said stabilizer means placing step includes placing a plurality of rows of said compartments on said mat.
Claim 40
Independent Claim
103 words
A method of installing erosion control apparatus at a shoreline along a body of water, comprising: providing an elongated mat having longitudinal sides and an anchoring compartment extending along each said longitudinal side thereof, said mat having a length substantially greater than the width thereof; providing an elongated tubular element having a length substantially greater than the width thereof; positioning said elongated mat to extend out into said body of water; filling said anchoring compartments with ballast material; positioning said elongated tubular element on said mat to extend out into said body of water; and filling said elongated tubular element with ballast material.
Claim 41
Independent Claim
103 words
A method of installing erosion control apparatus at a shoreline along a body of water, comprising: providing an elongated mat having longitudinal sides and an anchoring compartment extending along each said longitudinal side thereof, said mat having a length substantially greater than the width thereof; providing an elongated tubular element having a length substantially greater than the width thereof; positioning said elongated mat to extend out into said body of water; filling said anchoring compartments with ballast material; positioning said elongated tubular element on said mat to extend out into said body of water; and filling said elongated tubular element with ballast material.
Claim 42
Dependent Claim
22 words
The method of claim 37, wherein: said elongated tubular element filling step includes filling said elongated tubular element with a cementitious material.
Claim 43
Dependent Claim
21 words
The method of claim 37, wherein: said elongated tubular element providing step includes providing a plurality of said elongated tubular elements.
Claim 44
Dependent Claim
31 words
The method of claim 39, wherein: said elongated tubular element positioning step includes positioning said plurality of elongated tubular elements laterally adjacent each other at a medial region of said mat.
Claim 45
Dependent Claim
19 words
The method of claim 40, wherein: said elongated tubular element providing step includes securing said elongated tubular elements together.
Claim 46
Dependent Claim
22 words
The method of claim 41, wherein: said elongated tubular element positioning step includes securing said elongated tubular elements to said elongated mat.
Claim 47
Dependent Claim
25 words
The method of claim 37, wherein: said elongated tubular element filling step includes pumping filling material into said elongated tubular element through a single inlet.
Claim 48
Independent Claim
122 words
A method of installing erosion control apparatus at a shoreline along a body of water, comprising: providing an elongated mat having longitudinal sides and an anchoring compartment extending along each said longitudinal side thereof; providing a plurality of laterally adjacent flexible elongated tubular compartments, said elongated tubular compartments secured together to provide longitudinal sides, and said elongated tubular compartments disposed on a medial region of said mat so that a generally flat section of mat extends to each said longitudinal side of said elongated tubular compartments; positioning said elongated mat and said elongated tubular compartments to extend from said shoreline out into said body of water; filling said anchoring compartments with fill material; and filling said elongated tubular compartments with fill material.
Claim 49
Independent Claim
122 words
A method of installing erosion control apparatus at a shoreline along a body of water, comprising: providing an elongated mat having longitudinal sides and an anchoring compartment extending along each said longitudinal side thereof; providing a plurality of laterally adjacent flexible elongated tubular compartments, said elongated tubular compartments secured together to provide longitudinal sides, and said elongated tubular compartments disposed on a medial region of said mat so that a generally flat section of mat extends to each said longitudinal side of said elongated tubular compartments; positioning said elongated mat and said elongated tubular compartments to extend from said shoreline out into said body of water; filling said anchoring compartments with fill material; and filling said elongated tubular compartments with fill material.
Claim 50
Dependent Claim
22 words
The method of claim 44, wherein: said elongated tubular compartments filling step includes filling said elongated tubular compartments with a cementitious material.
Claim 51
Dependent Claim
31 words
The method of claim 45, wherein: said elongated tubular compartments filling step includes pumping filling material into said elongated tubular compartments through a single inlet in each said elongated tubular compartment.
Claim 52
Dependent Claim
162 words
An erosion control structure adpated for reducing erosion at a shoreline of a body of water having a bottom and a water surface, comprising: an elongated mat having longitudinal edges and having peripheral pockets extending along said longitudinal edges and adapted to hold ballast material, said elongated mat having a length substantially greater than the width thereof, said elongated mat adapted to be extended out into said body of water and anchored by said peripheral pockets to the bottom thereof; and an elongated tubular element positioned atop and extending upwardly from said mat, said elongated tubular element having a length substantially greater than the width thereof, said elongated tubular element adapted to be filled with ballast material, and said elongated tubular element width when filled being less than said elongated mat width, whereby when installed said mat and said elongated tubular element are extended out into said body of water to a location beneath said water surface and filled with ballast material.
Claim 53
Dependent Claim
162 words
An erosion control structure adpated for reducing erosion at a shoreline of a body of water having a bottom and a water surface, comprising: an elongated mat having longitudinal edges and having peripheral pockets extending along said longitudinal edges and adapted to hold ballast material, said elongated mat having a length substantially greater than the width thereof, said elongated mat adapted to be extended out into said body of water and anchored by said peripheral pockets to the bottom thereof; and an elongated tubular element positioned atop and extending upwardly from said mat, said elongated tubular element having a length substantially greater than the width thereof, said elongated tubular element adapted to be filled with ballast material, and said elongated tubular element width when filled being less than said elongated mat width, whereby when installed said mat and said elongated tubular element are extended out into said body of water to a location beneath said water surface and filled with ballast material.
Claim 54
Dependent Claim
30 words
The erosion control structure of claim 47, further comprising: a plurality of said elongated tubular elements positioned atop said mat and adapted to extend out into said body of water.
Claim 55
Dependent Claim
19 words
The erosion control structure of claim 48, wherein: said elongated tubular elements are secured together laterally adjacent each other.
Claim 56
Dependent Claim
21 words
The erosion control structure of claim 49, wherein: said elongated tubular elements are adapted to be filled with a cementitious material.
References Cited (Backward Citations)
US752637A
Cited
US984121A
Cited
US1253209A
Cited
US1039579A
Cited
US2570271A
Cited
GB894675A
Cited
US3344609A
Cited
US3205619A
Cited
US3315408A
Cited
US3396542A
Cited
US3425227A
Cited
US3474626A
Cited
US3425228A
Cited
US3561219A
Cited
US3696623A
Cited
US3769747A
Cited
US3786640A
Cited
US3957098A
Cited
US3871182A
Cited
US3862876A
Cited
US3874177A
Cited
US4135843A
Cited
US4184788A
Cited
US4405257A
Cited
US4420275A
Cited
US4449847A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-08-31 | 1991-03-02 | 1991-09-01 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-08-31 | 1995-03-02 | 1995-09-01 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-08-31 | 1999-03-02 | 1999-09-01 | $7700.00 | Window Closed / Lapsed |