Abstract

Abstract Subject of the invention is a process for the realization of cogenerative supply of electricity and heat, and in given case for their combination with waste heat recovery, particularly in case of combined (gas-steam) cycle industrial power plants. The essential feature of the invention is that during the season without heat demand the condenser with heating capacity N is operated by cooling with cooling tower, and during the heat-intensive season it is operated at a higher temperature required for the heat supplying operation mode, while the cooling tower (7) is disconnected partially or completely, and the resultant reduction of the specific expansion and heating capacity of the steam turbine (4) is compensated by increasing the steam parameters and steam output of the waste heat recovery boiler (3) with supplementary firing (11).

Inventors

  • 👤 Zoltan Vadas
  • 👤 Zoltan Belcsak
  • 👤 Istvan Papp
  • 👤 Bela Wenzel
  • 👤 Geza Takacsy

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 07:31
CPC Classifications
F; F01; F01K; F01K9/00; F01K9/003; F01K17/00; F01K17/02; F01K17/025; Y; Y02; Y02E; Y02E20/00; Y02E20/14; Y02E20/16; Y02P; Y02P80/00; Y02P80/10; Y02P80/15

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 236 words
A process for the realization of a cogenerated supply of electricity and heat with waste heat recovery as necessary, in a power plant including a gas turbine-driven generator, and a waste heat recovery boiler connected to the gas turbine to provide steam to a steam turbine-driven generator including a condensor and a cooling tower operatively associated with each other and with said stream turbine, comprising the steps of: (a) providing said steam turbine with a capability of a specific heating capacity N during a season without heat demand and while its condensor is cooled by said cooling tower, (b) selectively partially or completely disconnecting said cooling tower, (c) selectively operating said condensor at a higher temperature, (d) selectively implementing steps (b) and (c) during a heat-intensive season to reduce the specific expansion and heating capacity of the steam turbine, (e) utilizing the resultant reduction of the specific expansion and heating capacity of the steam turbine realized by the selective implementation of steps (b), (c) and (d) in a means for heat consumption, and (f) simultaneously with the selective implementation of steps (b), (c) and (d) operating a supplementary firing on said waste heat recovery boiler to increase the steam parameters and steam output of said waste recovery boiler to compensate for said resultant reduction of the specific expansion and heating capacity of the steam turbine caused by the selective implementation of steps (b), (c) and (d).
Claim 2
Dependent Claim 236 words
A process for the realization of a cogenerated supply of electricity and heat with waste heat recovery as necessary, in a power plant including a gas turbine-driven generator, and a waste heat recovery boiler connected to the gas turbine to provide steam to a steam turbine-driven generator including a condensor and a cooling tower operatively associated with each other and with said stream turbine, comprising the steps of: (a) providing said steam turbine with a capability of a specific heating capacity N during a season without heat demand and while its condensor is cooled by said cooling tower, (b) selectively partially or completely disconnecting said cooling tower, (c) selectively operating said condensor at a higher temperature, (d) selectively implementing steps (b) and (c) during a heat-intensive season to reduce the specific expansion and heating capacity of the steam turbine, (e) utilizing the resultant reduction of the specific expansion and heating capacity of the steam turbine realized by the selective implementation of steps (b), (c) and (d) in a means for heat consumption, and (f) simultaneously with the selective implementation of steps (b), (c) and (d) operating a supplementary firing on said waste heat recovery boiler to increase the steam parameters and steam output of said waste recovery boiler to compensate for said resultant reduction of the specific expansion and heating capacity of the steam turbine caused by the selective implementation of steps (b), (c) and (d).
Claim 3
Dependent Claim 24 words
The process according to claim 1, further characterized by providing several waste heat recovery boilers each of which includes a means for supplementary firing.
Claim 4
Dependent Claim 259 words
A process for the realization of cogenerated supply of electricity and heat with waste heat recovery in a power plant, comprising the steps of: (a) providing and operating a means for waste heat recovery to generate steam, (b) providing a steam turbine-driven generator, (c) utilizing the steam generated by said means for waste heat recovery to operate said stem turbine-driven generator, (d) providing a condensor for operative association with said steam turbine, (e) operating said condensor during a season without heat demand at a specific heating capacity N, (f) providing a cooling tower in operative association with said condensor during said season without heat demand to maintain the specific heating capacity N of said condensor, (g) selectively operating said condensor at a higher temperature, (h) selectively partially or completely disconnecting said cooling tower from said condensor, (i) selectively implementing steps (g) and (h) during a heat-intensive season to reduce the specific expansion and heating capacity of the steam turbine, (j) utilizing the resultant reduction of the specific expansion and heating capacity of the steam turbine realized by the selective implementation of steps (g), (h) and (i) in a means for heat consumption, and (k) simultaneously with the selective implementation of steps (g), (h) and (i) operating a supplementary firing on said means for waste heat recovery to increase the steam parameters and steam output of said means for waste heat recovery to compensate for said resultant reduction of the specific expansion and heating capacity of the steam turbine caused by the selective implementation of steps (g), (h) and (i).
Claim 5
Dependent Claim 259 words
A process for the realization of cogenerated supply of electricity and heat with waste heat recovery in a power plant, comprising the steps of: (a) providing and operating a means for waste heat recovery to generate steam, (b) providing a steam turbine-driven generator, (c) utilizing the steam generated by said means for waste heat recovery to operate said stem turbine-driven generator, (d) providing a condensor for operative association with said steam turbine, (e) operating said condensor during a season without heat demand at a specific heating capacity N, (f) providing a cooling tower in operative association with said condensor during said season without heat demand to maintain the specific heating capacity N of said condensor, (g) selectively operating said condensor at a higher temperature, (h) selectively partially or completely disconnecting said cooling tower from said condensor, (i) selectively implementing steps (g) and (h) during a heat-intensive season to reduce the specific expansion and heating capacity of the steam turbine, (j) utilizing the resultant reduction of the specific expansion and heating capacity of the steam turbine realized by the selective implementation of steps (g), (h) and (i) in a means for heat consumption, and (k) simultaneously with the selective implementation of steps (g), (h) and (i) operating a supplementary firing on said means for waste heat recovery to increase the steam parameters and steam output of said means for waste heat recovery to compensate for said resultant reduction of the specific expansion and heating capacity of the steam turbine caused by the selective implementation of steps (g), (h) and (i).

References Cited (Backward Citations)

US4032793A Cited
US4037413A Cited
US4130992A Cited
US4274256A Cited
US4558228A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-06-29 1990-12-29 1991-06-30 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-06-29 1994-12-29 1995-06-30 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-06-29 1998-12-29 1999-06-30 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag