← Back to Patent Explorer
US4130992A Expired / Lapsed US ⏱️ 0.0 years remaining

Arrangement for the storage of energy in power plants

Assignee: Deutsche Babcock AG
•
Filing: 1977-02-07
•
Granted: 1978-12-26
•
Expires: 1997-02-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An arrangement for the storage of energy in power plants in which an excess of water during low-load operation is heated in feed water preheaters, and is stored as hot water in a hot storage vessel. During peak-load operation, the hot water from the storage vessel is fed into a feed water line, bypassing the feed water preheaters. Alternately with the hot water, colder water is taken from or stored in the lower portion of the hot storage tank. Before being fed into the hot storage tank, the colder water is thermally degassed with bleeder steam at a pressure slightly above atmospheric pressure, preferably between 1.01 and 1.5 atmospheres (abs). The feed water tank connected to the degasser is used for volume compensation while storing the hot water in the hot water storage tank. The storage tank may be in the form of three units of substantially identical volume. The hot storage tank and the feed water tank used as warm-water storage, are alternately filled and emptied. The condensate is temporarily stored in a cold storage tank lying behind the condenser. The hot water is stored at a temperature corresponding to the feed water temperature at full-load operation.

Inventors

  • 👤 Eberhard Bitterlich
  • 👤 Franz Thelen
  • 👤 Henning Weber

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 17:56
CPC Classifications
F; F01; F01K; F01K3/00; F01K3/004; F01K17/00; F01K7/00; F01K7/16; F01K7/22; F01K7/24; Y; Y02; Y02E; Y02E20/00; Y02E20/14

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 103 words
A method for the storage of energy in power plants comprising the steps of: heating an excess of water during low-load operation in water preheaters; storing the heated water as hot water in a hot storage vessel; feeding the heated water from said storage vessel during peak-load operation into a feed water line and bypassing said feed water preheaters; alternately taking from and storing in a lower portion of said storage vessel cold water and said hot water; degassing thermally said cold water before storing in said storage vessel, said degassing step being applied with bleeder steam at a pressure substantially above atmospheric.
Claim 2
Independent Claim 103 words
A method for the storage of energy in power plants comprising the steps of: heating an excess of water during low-load operation in water preheaters; storing the heated water as hot water in a hot storage vessel; feeding the heated water from said storage vessel during peak-load operation into a feed water line and bypassing said feed water preheaters; alternately taking from and storing in a lower portion of said storage vessel cold water and said hot water; degassing thermally said cold water before storing in said storage vessel, said degassing step being applied with bleeder steam at a pressure substantially above atmospheric.
Claim 3
Dependent Claim 18 words
A method as defined in claim 1 wherein said pressure is substantially between 1.01 and 1.5 atmospheres absolute.
Claim 4
Dependent Claim 31 words
A method as defined in claim 2 wherein during the step of storing hot water in said storage vessel a feed water tank connected to a degasser provides for volume compensation.
Claim 5
Dependent Claim 37 words
A method as defined in claim 2 including the step of alternately filling and emptying a hot storage tank and a feed water tank; and storing temporarily condensate in a cold storage tank lying behind a condenser.
Claim 6
Dependent Claim 27 words
A method as defined in claim 2 wherein said hot water is stored at a temperature corresponding substantially to the feed water temperature at full load operation.
Claim 7
Dependent Claim 21 words
A method as defined in claim 5 wherein said hot water is stored after peak-load operation and at substantially full load.
Claim 8
Dependent Claim 34 words
A method as defined in claim 2 wherein temperature and pressure of reheated steam at peak load operation are balanced so that they lie on a line of constant lifetime utilization of pipe material.
Claim 9
Dependent Claim 38 words
A method as defined in claim 2 including the step of transferring part of the heat from at least part of the hot water to a heat consumer prior to feeding the hot water into a steam generator.
Claim 10
Dependent Claim 131 words
Apparatus for the storage of energy in power plants, comprising: water preheaters for heating an excess of water during low-load operation; a feed water line for receiving the heated water from said storage vessel during peak-load operation and bypassing said feed water preheaters; said storage vessel having a lower storage portion, cold water and hot water being alternately taken from and stored in said lower storage portion of said storage vessel; means for degassing thermally said cold water before storing in said storage vessel by applying bleeder steam at a pressure substantially above atmospheric; said degassing means comprising thermal degasser means having a mixer preheater connected ahead of said hot storage vessel, and a bleeder line connected to said thermal degasser means and having a withdrawal pressure substantially above atmospheric pressure.
Claim 11
Dependent Claim 131 words
Apparatus for the storage of energy in power plants, comprising: water preheaters for heating an excess of water during low-load operation; a feed water line for receiving the heated water from said storage vessel during peak-load operation and bypassing said feed water preheaters; said storage vessel having a lower storage portion, cold water and hot water being alternately taken from and stored in said lower storage portion of said storage vessel; means for degassing thermally said cold water before storing in said storage vessel by applying bleeder steam at a pressure substantially above atmospheric; said degassing means comprising thermal degasser means having a mixer preheater connected ahead of said hot storage vessel, and a bleeder line connected to said thermal degasser means and having a withdrawal pressure substantially above atmospheric pressure.
Claim 12
Dependent Claim 41 words
Apparatus as defined in claim 9 including feed water tank means connected to said degasser means and having a volume of substantially 30% of the volume of said hot storage vessel, said hot storage vessel being substantially completely filled with water.
Claim 13
Dependent Claim 65 words
Apparatus as defined in claim 9 including a condenser and low pressure preheaters; a cold storage tank located between said condenser and said low pressure preheaters; a warm storage tank connected to said degasser means; high-pressure preheaters located behind said degasser means; and medium pressure pump means, said hot storage vessel being connected in parallel with said high-pressure preheaters and said medium pressure pump means.
Claim 14
Dependent Claim 32 words
Apparatus as defined in claim 9 including heat consumer means; and pressure reduction valve means, said heat consumer means being connected to said hot storage vessel through said pressure reduction valve means.

References Cited (Backward Citations)

US1728375A Cited
US3457725A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-12-25 1982-06-26 1982-12-26 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-12-25 1986-06-26 1986-12-26 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-12-25 1990-06-26 1990-12-26 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag