Patent US4673652A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4673652A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of testing and reconditioning insulating tubular conduits

Assignee: Nippon Steel Corp
•
Filing: 1986-12-01
•
Granted: 1987-06-16
•
Expires: 2006-12-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A non-destructive on-site method of inspection, and testing of the insulating performance and reconditioning of a concentric insulating tubular conduit member is disclosed. The insulating tubular conduit members comprise concentric walled members with an intermediate annular insulating cavity defined therebetween. This non-destructive method of testing and inspection is based on a determination of the presence of an unacceptable level of moisture in the annular insulating cavity. Visual, auditory, electrical, and radioactive indicating means can be employed in accordance with the principles of this invention. The use of a vacuum pump to establish at least a partial vacuum in the annular insulating cavity in conjunction with the testing technique employed herein, additionally provides a means for reconditioning and improving the insulating performance of insulating tubular conduits and permits reassembly of a fluid transmission conduit in which each of the tubular conduit sections will have the desirable insulating capacity.

Inventors

  • 👤 David M. McStravick
  • 👤 David V. Chenoweth
  • 👤 David M. Anderson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 15:10
CPC Classifications
E; E21; E21B; E21B36/00; E21B36/003; E21B17/00; G; G01; G01N; G01N25/00; G01N25/56

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 155 words
A method of indirect, non-destructive on-site inspection, testing and repair of the insulating capacity of a tubular fluid transmission conduit installed in a subterranean well, comprising the steps of: providing a plurality of threadably interconnected concentric walled insulating tubular sections, each tubular section having an individually sealed annular insulating cavity between said concentric walls disconnecting the insulating tubular sections at the well surface; separately exposing each of said annular insulating cavity of each tubular section to a precalibrated moisture sensitive means to determine the amount of water, in the liquid and vaporous state, present in each said annular cavity; determining the insulating performance of each tubular section according to a preselected moisture level above which the tubular section is unacceptable; exposing the annular insulating cavity of each unacceptable tubular section to a vacuum means to reduce the moisture to an acceptable level; and thereafter resealing the annular insulating cavity of each such unacceptable tubular section.
Claim 2
Independent Claim 155 words
A method of indirect, non-destructive on-site inspection, testing and repair of the insulating capacity of a tubular fluid transmission conduit installed in a subterranean well, comprising the steps of: providing a plurality of threadably interconnected concentric walled insulating tubular sections, each tubular section having an individually sealed annular insulating cavity between said concentric walls disconnecting the insulating tubular sections at the well surface; separately exposing each of said annular insulating cavity of each tubular section to a precalibrated moisture sensitive means to determine the amount of water, in the liquid and vaporous state, present in each said annular cavity; determining the insulating performance of each tubular section according to a preselected moisture level above which the tubular section is unacceptable; exposing the annular insulating cavity of each unacceptable tubular section to a vacuum means to reduce the moisture to an acceptable level; and thereafter resealing the annular insulating cavity of each such unacceptable tubular section.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-06-15 1990-12-15 1991-06-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-06-15 1994-12-15 1995-06-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-06-15 1998-12-15 1999-06-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag